Hobbs has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. A retrofit EV charger circuit is billed as standard electrical work under the City's amperage-based Electrical Permit fee schedule (Municode 15.28.090) -- the same schedule used for the interconnection portion of the sibling solar-pv-permit entry. Separately, the statewide 2021 New Mexico Residential Energy Conservation Code (14.6.6 NMAC, effective 7/30/2024, enforced by Hobbs as an NMAC-code-enforcing jurisdiction) requires NEW single-family homes to be built with a dedicated 50-amp/240V EV-ready circuit and outlet, and the 2021 New Mexico Commercial Energy Conservation Code (14.7.9 NMAC) requires new commercial buildings to provision EV charging capacity for 1-5% of parking spaces depending on use -- these are new-construction wiring-capacity mandates, not a separate retrofit EV charger permit or fee.
Verified 2026-07-20 · Source
When you need this permit
- Electrical Permit Application (City of Hobbs) required for EV charger circuit installation, billed under the amperage-based fee schedule (Municode 15.28.090) -- no dedicated EV/EVSE fee line exists
- New single-family homes must be built with a dedicated 50-amp/240V circuit and outlet capable of EV charging, per the 2021 New Mexico Residential Energy Conservation Code (14.6.6 NMAC), effective statewide 7/30/2024
- New commercial buildings must provision EV charging infrastructure for 1-5% of parking spaces depending on building use, per the 2021 New Mexico Commercial Energy Conservation Code (14.7.9 NMAC)
- Electrical work must be performed and permitted by a CID-licensed electrician (EE-98, EL-1, or ER-1), per N.M. Admin. Code 14.5.2.8 Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Hobbs Code of Ordinances Section 15.28.090 -- no separately itemized EV-specific electrical fee line was located; Show full citationHide
City of Hobbs Code of Ordinances Section 15.28.090 -- no separately itemized EV-specific electrical fee line was located; an EV charger circuit is billed on the same amperage-based schedule as any other electrical service work, the same mechanism already documented for the solar-pv-permit's interconnection portionReview timeline
Inspection process
- 1
Final Electrical
Charger circuit, disconnect, and GFCI/load-management compliance verified per the 2020 New Mexico Electrical Code (NMAC 14.10.4) before energizing
See the full Hobbs inspection guide — scheduling & re-inspection fees →
Tips
- Hobbs does not have an EV-specific permit fee -- an EV charger circuit is billed on the same amperage-based Electrical Permit schedule (Municode 15.28.090) used for any other service/circuit work.
- If you're building a new single-family home in Hobbs, the 2021 New Mexico Residential Energy Conservation Code already requires a 50-amp/240V EV-ready circuit and outlet be roughed in -- confirm this is included in your electrical plan rather than treating it as an optional add-on later.
- New commercial construction in Hobbs must provision EV charging capacity for a percentage of parking spaces under the 2021 New Mexico Commercial Energy Conservation Code (14.7.9 NMAC) -- factor this into site/electrical plans for new commercial permits.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hobbs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Hobbs's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Hobbs yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Hobbs lands. Privacy.
Other permits in Hobbs
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across New Mexico →
Look up this fee in a different city →
Related guides
Now live
Build your Hobbs project checklist
Describe your project once and get every permit, document, and fee it triggers in Hobbs — in one checklist. Free, for any city and any number of projects.
Get started →