Change Of Use / Certificate Of Occupancy — Village of Corrales, New Mexico · Requirements sheet
Verified 2026-07-22 · Source: https://www.corrales-nm.org/DocumentCenter/View/3526/site_development_plan_application-2026
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change Of Use / Certificate Of Occupancy in Village of Corrales, New Mexico
A straightforward change in a structure's occupancy (with no additional parking or site alteration triggered) is handled by the Village's Building Official as part of the general Application for Construction Permit process -- the Village's own Building Permit Guide states any owner who intends to 'change the occupancy of a building or structure shall first apply to the Building Official and obtain the required permit.' A change of use that WOULD require additional parking and/or any alteration or addition to the site is instead routed through a Site Development Plan Permit reviewed by the Planning & Zoning Commission under Village Code Sec. 18-45(b), culminating in a Planning & Zoning-issued 'Certificate of Occupancy (Compliance)' distinct from the Building Official's construction-completion Certificate of Occupancy documented elsewhere in this file.
Verified 2026-07-22 · Source
When you need this permit
- Any owner or authorized agent who intends to change the occupancy of a building or structure must first apply to the Building Official and obtain the required permit (Village of Corrales Application for Construction Permit / Building Permit Guide, rev. June 2026)
- Per Village Code Sec. 18-45(b)(1): 'No building, structure, or land in any zone may be occupied by a use designated as requiring site development plan approval without the approval of a site development plan by the planning and zoning commission'
- Per Sec. 18-45(b)(6): 'Any change in use which would require additional parking and/or any alteration or addition to the site of any structure upon the site shall require the resubmittal of an application and approval' -- i.e., a change of use triggering additional parking or site alteration requires a (re)submitted Site Development Plan Permit application, not just a Building Official sign-off
- Site Development Plan applications require a pre-submittal meeting with the Planning & Zoning Administrator, a completed application with a narrative of existing and proposed uses (including hours/days of operation), and fourteen (14) sets of required drawings meeting minimum content standards (proposed/existing structures, lot coverage, property lines, utilities, parking, drainage, landscaping, adjacent structures within 25 feet, zone designations of adjacent properties, north arrow/scale)
- The Planning & Zoning Administrator schedules a hearing before the P&Z Commission no later than sixty (60) calendar days following submittal of a completed application (Sec. 18-45(b)(2)-(3))
- The Village's own Schedule of Fees (Updated September 24, 2024) separately lists a 'Certificate of Occupancy (Compliance); (Related to Site Development Plan)' fee and a 'Zoning Certification' fee, both administered by Planning & Zoning
- Site Development Plan approval automatically expires 24 months after Commission approval (or conditional approval) if development is not complete, unless extended by the Commission (Sec. 18-45(b)(8))
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Compliance Verification (Certificate of Occupancy)
Planning & Zoning verifies the completed development matches the approved Site Development Plan before issuing the Certificate of Occupancy (Compliance); distinct from the Building Official's own final construction inspection and Certificate of Occupancy for new-construction projects (documented under this file's residential-building-permit entry)
See the full Village of Corrales inspection guide — scheduling & re-inspection fees →
Tips
- Corrales has two distinct 'Certificate of Occupancy' concepts: the Building Official issues one automatically after the final general construction inspection on a new-construction project (see this file's residential-building-permit entry), while Planning & Zoning separately issues a 'Certificate of Occupancy (Compliance)' ($47.00) tied to Site Development Plan approval -- these are not the same product and are not both required for every project.
- A simple change of tenant/occupancy with no added parking demand and no site alteration can be handled through the Building Official's general Construction Permit process. The moment a change of use would require additional parking or any site alteration/addition, Sec. 18-45(b)(6) requires a (re)submitted Site Development Plan application instead -- budget for the 1.5%/0.1% valuation-based fee (minimum $500.00), not just a flat permit fee.
- The 60-day clock in Sec. 18-45(b) only guarantees a hearing gets scheduled within 60 days of a COMPLETE application -- it does not guarantee approval within 60 days, and an incomplete application is returned without being scheduled at all.
- Site Development Plan approval automatically expires 24 months after Commission approval if the project isn't complete -- track this deadline separately from any building-permit expiration.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Village of Corrales building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Village of Corrales
Change Of Use / Certificate Of Occupancy in other cities
Compare change of use / certificate of occupancy fees across New Mexico →
Look up this fee in a different city →