Electric Vehicle Charging Station Permit — Village of Corrales, New Mexico · Requirements sheet
Verified 2026-07-20 · Source: https://www.corrales-nm.org/342/Building-Permits-Inspections
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle Charging Station Permit in Village of Corrales, New Mexico
The Village of Corrales does not publish a dedicated EV charger/EVSE permit application, fee line, or webpage -- checked the Building Permits & Inspections page, the Application for Construction Permit/Building Permit Guide (rev. June 2026), and the Building Permit Fees and Rates schedule directly; none name electric vehicle charging stations, EV chargers, or EVSE. An EV charger installation is electrical work, and per the Village's own governance model documented throughout this file, electrical permitting and inspection for Corrales is NOT handled by the Village itself -- it is routed to the City of Rio Rancho Building Department under an interlocal service arrangement, the same referral already documented in this file's solar-pv-permit entry for solar's electrical interconnection portion. Re-chased 2026-07-20: located and directly fetched the City of Rio Rancho's own live Electrical Permit fee form, which publishes a real, currently-in-force fee table (no EV-specific line, but a catch-all 'items not listed' minimum plus a base permit fee and administration fee) that governs this exact referral pathway.
Verified 2026-07-20 · Source
When you need this permit
- No EV-charger-specific permit application exists on either the Village of Corrales' or the City of Rio Rancho's website -- checked directly
- Per the Village's own Building Permits & Inspections page: 'The City of Rio Rancho performs mechanical, electrical, and plumbing inspections for the Village of Corrales. The permits and inspections for these disciplines should be coordinated with the prospective subcontractor'
- Per the Village's Application for Construction Permit (Building Permit Guide, rev. June 2026, page 5 of 6), under Required Inspections: 'Plumbing, Electrical, Mechanical Inspections: Permits must be obtained in the City of Rio Rancho Building Department unless directed otherwise by the Building Official'
- If the EV charger installation is mounted on or attached to a structure requiring its own permit (e.g., a new carport canopy), a separate Village of Corrales Application for Construction Permit for that structural work would additionally apply
- Licensed New Mexico electrical contractor required for the electrical work, consistent with state licensing law
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection (conducted by City of Rio Rancho)
New circuit/outlet or hardwired charger installation inspected by Rio Rancho Building Division inspectors under the interlocal MEP-trade referral arrangement
See the full Village of Corrales inspection guide — scheduling & re-inspection fees →
Tips
- Do not look for an EV charger permit on the Village of Corrales website -- like all electrical work in Corrales, it is handled entirely by the City of Rio Rancho Building Department under the interlocal arrangement described in this file's electrical-trade referral notes.
- If the charger is mounted to a new or existing structure that itself needs a Village building permit (e.g., a new carport), budget for two separate permitting tracks: the Village of Corrales for the structural work and the City of Rio Rancho for the electrical circuit.
- Rio Rancho's own Electrical Permit form has no EV-specific line item — expect the $33 base permit fee plus $23 administration fee at minimum, with an added service/panel-size fee only if the project also upsizes the electrical service.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Village of Corrales building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Village of Corrales
Electric Vehicle Charging Station Permit in other cities
Compare electric vehicle charging station permit fees across New Mexico →
Look up this fee in a different city →
Related guides
Now live
Build your Village of Corrales project checklist
Describe your project once and get every permit, document, and fee it triggers in Village of Corrales — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →