Electric Vehicle Charging Station Permit — Village of Corrales, New Mexico · Requirements sheet
Verified 2026-07-20 · Source: https://www.corrales-nm.org/342/Building-Permits-Inspections
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle Charging Station Permit in Village of Corrales, New Mexico
The Village of Corrales does not publish a dedicated EV charger/EVSE permit application, fee line, or webpage — the Building Permits & Inspections page, the Application for Construction Permit/Building Permit Guide (rev. June 2026), and the Building Permit Fees and Rates schedule name no electric vehicle charging stations, EV chargers, or EVSE. An EV charger installation is electrical work, and under the Village's own governance model, electrical permitting and inspection for Corrales is NOT handled by the Village itself — it is routed to the City of Rio Rancho Building Department under an interlocal service arrangement, the same referral documented in the solar-pv-permit entry for solar's electrical interconnection portion. The City of Rio Rancho's own live Electrical Permit fee form publishes a real, currently-in-force fee table (no EV-specific line, but a catch-all 'items not listed' minimum plus a base permit fee and administration fee) that governs this exact referral pathway.
Verified 2026-07-20 · Source
When you need this permit
- Neither the Village of Corrales' website nor the City of Rio Rancho's publishes an EV-charger-specific permit application
- Per the Village's own Building Permits & Inspections page: 'The City of Rio Rancho performs mechanical, electrical, and plumbing inspections for the Village of Corrales. The permits and inspections for these disciplines should be coordinated with the prospective subcontractor'
- Per the Village's Application for Construction Permit (Building Permit Guide, rev. June 2026, page 5 of 6), under Required Inspections: 'Plumbing, Electrical, Mechanical Inspections: Permits must be obtained in the City of Rio Rancho Building Department unless directed otherwise by the Building Official'
- If the EV charger installation is mounted on or attached to a structure requiring its own permit (e.g., a new carport canopy), a separate Village of Corrales Application for Construction Permit for that structural work would additionally apply
- Licensed New Mexico electrical contractor required for the electrical work, consistent with state licensing law
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Per the City of Rio Rancho's own live Electrical Permit form (rrnm.gov/DocumentCenter/View/76076/ELECTRICAL-PERMIT-2, rev. Show full citationHide
Per the City of Rio Rancho's own live Electrical Permit form (rrnm.gov/DocumentCenter/View/76076/ELECTRICAL-PERMIT-2, rev. 5/2015, still the current form served on the City's site). No EV-charger/EVSE line item is named; the form's catch-all line ('Items not listed with a minimum $33.00 fee may require additional fees') and this base permit fee govern an EV charger circuit that doesn't match a named service/panel-size or appliance line.Review timeline
Inspection process
- 1
Electrical Inspection (conducted by City of Rio Rancho)
New circuit/outlet or hardwired charger installation inspected by Rio Rancho Building Division inspectors under the interlocal MEP-trade referral arrangement
See the full Village of Corrales inspection guide — scheduling & re-inspection fees →
Tips
- Do not look for an EV charger permit on the Village of Corrales website -- like all electrical work in Corrales, it is handled entirely by the City of Rio Rancho Building Department under the interlocal arrangement described in the electrical-trade referral notes.
- If the charger is mounted to a new or existing structure that itself needs a Village building permit (e.g., a new carport), budget for two separate permitting tracks: the Village of Corrales for the structural work and the City of Rio Rancho for the electrical circuit.
- Rio Rancho's own Electrical Permit form has no EV-specific line item — expect the $33 base permit fee plus $23 administration fee at minimum, with an added service/panel-size fee only if the project also upsizes the electrical service.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Village of Corrales building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Village of Corrales's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Village of Corrales yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Village of Corrales lands. Privacy.
Other permits in Village of Corrales
Electric Vehicle Charging Station Permit in other cities
Compare electric vehicle charging station permit fees across New Mexico →
Look up this fee in a different city →
Related guides
Now live
Build your Village of Corrales project checklist
Describe your project once and get every permit, document, and fee it triggers in Village of Corrales — in one checklist. Free, for any city and any number of projects.
Get started →