EV Charger / EVSE Permit in Nibley, Utah

Nibley's Consolidated Fee Schedule does not publish a distinct EV-charger fee line item, and the city has no general electrical-permit category — only the valuation-based Building Permit fee, a 0.1% Plan Review Fee, and a $50 Reinspection Fee. A full-text search of the fee schedule found zero mentions of 'EV,' 'electric vehicle,' 'charging station,' or 'EVSE,' and no separate standalone electrical-trade fee line item (unlike neighboring Cache County cities such as Logan or Millcreek). The city has not published explicit confirmation of how EV charger installs are billed, so this entry is marked partial confidence.

Reviewed 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • Nibley uses the ICC codes as amended by the State of Utah (2023 NEC electrical code, adopted statewide per Utah Code § 15A-2-103(1)(g))
  • Confirm applicable fee category directly with the Building Department before applying, since no EV-specific or general electrical-permit line item is published

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, closest published analog)Nibley City Consolidated Fee Schedule, 'Building Permit Fees' section. Not confirmed as EV-specific; Nibley has no standalone electrical-permit or EV-charger line item, so this is the closest published fee that would likely apply if the city treats an EV charger install as valuation-based work.
$24.00 minimum (valuation $1–$500), scaling per Nibley's published valuation table for higher-value work
Plan Review FeeNibley City Consolidated Fee Schedule, Building Permit Fees section.
0.1% of valuation of the improvement
State Collected 1% FeeNibley City Consolidated Fee Schedule.
1% of Building Permit Fees
Reinspection FeeNibley City Consolidated Fee Schedule, Miscellaneous Items section.
$50.00

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Nibley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Inspection of the installed circuit, panel work, and EVSE equipment. Required inspections vary by project and are listed upon permit issuance per Nibley's official Building Department page.

See the full Nibley inspection guide — scheduling & re-inspection fees →

Tips

  • Nibley has no distinct EV charger / EVSE permit type or fee, and no general electrical-permit category at all — confirm the correct fee category with the Building Department before applying.
  • A full-text search of the Consolidated Fee Schedule PDF found no mentions of EV chargers, EVSE, or a standalone electrical-trade fee line item, unlike some neighboring Cache County cities.

Frequently asked questions

Nibley requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property; Nibley uses the ICC codes as amended by the State of Utah (2023 NEC electrical code, adopted statewide per Utah Code § 15A-2-103(1)(g)); Confirm applicable fee category directly with the Building Department before applying, since no EV-specific or general electrical-permit line item is published. If your project isn't listed, confirm with Nibley City Building Department (Public Works) at (435) 752-0431 before starting work.

Not published. Nibley's Consolidated Fee Schedule does not list an EV-charger, EVSE, or general electrical-permit fee category. The closest published fee is the valuation-based Building Permit fee, but the city has not explicitly confirmed this applies to EV charger installs — contact the Building Department to confirm before applying.

Nibley does not publish a plan-review timeline for this permit. Contact Nibley City Building Department (Public Works) at (435) 752-0431 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Nibley requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through Nibley City Building Department (Public Works) ((435) 752-0431).

Apply through Nibley City Building Department (Public Works) at 455 W 3200 S, Nibley, UT 84321-6337. Phone: (435) 752-0431. Office hours: Mon–Fri 9:00 AM – 5:00 PM. Official information: https://nibleycity.gov/building-department/.

Nibley, Utah has adopted: 2021 International Residential Code (IRC) — Nibley City Building Department page states: 'Nibley is currently using the ICC Codes as amended by the state of Utah'; per Utah Code § 15A-2-103(1)(b), the 2021 IRC continues in force statewide, unchanged by the July 1, 2026 update.; 2024 International Building Code (IBC), including Appendices C and J — current statewide edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026.; 2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026; per Nibley's own 'ICC Codes as amended by the state of Utah' statement.; 2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026; per Nibley's own 'ICC Codes as amended by the state of Utah' statement.; 2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026; per Nibley's own 'ICC Codes as amended by the state of Utah' statement.; 2024 International Energy Conservation Code (IECC) — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026; per Nibley's own 'ICC Codes as amended by the state of Utah' statement.; 2024 International Existing Building Code (IEBC) — current statewide edition per Utah Code § 15A-2-103(1)(i), effective July 1, 2026; per Nibley's own 'ICC Codes as amended by the state of Utah' statement.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide edition per Utah Code § 15A-2-103(1)(n), effective July 1, 2026; per Nibley's own 'ICC Codes as amended by the state of Utah' statement.; 2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update.; Modular Building Institute Standards 1200 and 1205 — adopted statewide per Utah Code § 15A-2-103(1)(o); not separately itemized on Nibley's own page, but applies statewide.. Local amendments apply — see the Nibley overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nibley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.