Skip to main content
PermitBase

South Weber building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for South Weber, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
1600 E South Weber Drive, South Weber, UT 84405
Phone
(801) 479-3177
Office hours
Mon–Thu 8:30 AM – 5:30 PM, Fri 8:00 AM – 12:00 PM

Inspection guide

See how inspections work in South Weber — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • South Weber City is subject to the Utah State Construction Code (Utah Code § 15A-2-103), which as of 7/1/2026 CURRENTLY adopts: the 2024 International Building Code (IBC), including Appendices C and J, § 15A-2-103(1)(a); the 2021 International Residential Code (IRC), § 15A-2-103(1)(b), UNCHANGED by the 7/1/2026 amendment, plus Appendix AQ of the 2021 IRC, § 15A-2-103(1)(c); the 2024 International Plumbing Code (IPC), § 15A-2-103(1)(d); the 2024 International Mechanical Code (IMC), § 15A-2-103(1)(e); the 2024 International Fuel Gas Code (IFGC), § 15A-2-103(1)(f); the 2024 International Energy Conservation Code (IECC), single unsplit statewide edition, § 15A-2-103(1)(h); the 2024 International Existing Building Code (IEBC), § 15A-2-103(1)(i); and the residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC), § 15A-2-103(1)(n). South Weber's own Building Department page and forms (live-checked 2026-07-16) do not publish a city-specific code-edition statement beyond referencing 'building codes' generally, so the applicable edition is the statewide-adopted edition rather than a city-specific amendment — this could not be independently confirmed on a South Weber-specific ordinance page beyond the code index (see localAmendments note on codelibrary.amlegal.com access). No city-page conflict to record since South Weber publishes no edition statement of its own to contradict the statute.
  • 2023 National Electrical Code (NEC) — statewide-adopted edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment; no South Weber-specific amendment to the NEC edition was found.
  • NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification; this entry previously described the 2024-cycle codes in future tense ('scheduled to take effect July 1, 2026') and as a single undifferentiated '2021 I-Codes' set. That date has now passed, so IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now individually itemized above and stated as CURRENT (2024 editions), while IRC (2021) and NEC (2023) are explicitly flagged as unchanged. Utah's statewide-mandatory code regime (Utah Code § 15A-1-204) binds South Weber directly since it publishes no city-specific edition page of its own.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
3units

3 buildings · $1.5M valuation

Trailing 12 months
39units

12 of 12 months reported · #73 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
13units

13 buildings · $7M valuation

5 month(s) reported to Census

Full year 2025
46units

42 buildings · $24.2M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • South Weber is located in Davis County, Utah — despite its name (referencing the Weber River, which forms part of the city's boundary), it is NOT part of Weber County. Confirm this distinction before filing permits or comparing fee schedules with Weber County or 'unincorporated-weber' entries.
  • South Weber operates its own independent Building Department led by a dedicated Building Official/Public Works Director (Mark Larsen, mlarsen@southwebercity.com) — it is not contracted out to Davis County or a third-party inspection agency for standard building permits.
  • City Office Hours are Mon-Thu 8:30 AM-5:30 PM and Friday 8:00 AM-12:00 PM only (closed Friday afternoons) — narrower than many neighboring Davis County cities.
  • South Weber's building permit fee (new construction) uses the ICC Building Valuation Data formula rather than a flat table; most trade/accessory permit types (Electrical/Mechanical, Remodeling, Finish Basement, Roof, Alternative Energy, Swimming Pool, Sign) instead use flat fees that bundle a refundable completion bond and, where applicable, a $100 plan check fee.
  • New residential construction triggers six separate impact fees (Parks & Trails $2,096, Public Safety Fire Station $126, Recreation Building $834, Water $1,463, Storm Sewer $1,281/ERU, Transportation $3,597 for single-family detached) plus Central Weber Sewer District fees ($3,792, includes 5% administrative fee) — see Consolidated Fee Schedule Chapter 7.
  • No South Weber-specific published plan-review turnaround time was found on southwebercity.gov or in the Consolidated Fee Schedule (FY2026-2027) for any permit type. Only the new-construction Residential Building Permit uses a review timeline, sourced from the Utah statutory floor (Utah Code § 10-20-909: 3-business-day screening period + 14 business days = 17 business days total for one-/two-family dwelling or townhome plan review) rather than a South Weber-published figure — all other (trade/accessory/sign) permit types are honestly left reviewTimelineDays: null with a note, per PermitBase's scoping policy that the statute applies only to dwelling-construction plan review.
  • One-story detached storage-type sheds up to 200 sq ft on one- and two-family dwelling lots (120 sq ft for commercial/multi-family 4+ units) do NOT require a building permit in South Weber, per the city's official 'When Do I Need a Building Permit?' handout.
  • South Weber City Code (codelibrary.amlegal.com/codes/southweberut) is a React-rendered site that does not expose ordinance body text to automated fetch — only the code index/navigation was confirmed; full Building/Construction title ordinance text was not independently rendered, consistent with the same access limitation documented for Murray's amlegal code library.

Comparable nearby cities

Kaysville
Both in Davis County10 shared permit types~7 mi away
Compare fees →
Layton
Both in Davis County9 shared permit types~4 mi away
Compare fees →
Syracuse
Both in Davis County9 shared permit types~7 mi away
Compare fees →