South Weber building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for South Weber, Utah.
Last verified 2026-07-08 · Source · Embed this page’s badge · Version history
Building department
- Address
- 1600 E South Weber Drive, South Weber, UT 84405
- Phone
- (801) 479-3177
- Office hours
- Mon–Thu 8:30 AM – 5:30 PM, Fri 8:00 AM – 12:00 PM
- Website
- Official site
- Permit portal
- Apply online at South Weber's portal
Inspection guide
See how inspections work in South Weber — sequence, scheduling & re-inspection fees.
Codes adopted
Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.
- South Weber City is subject to the Utah State Construction Code (Utah Code § 15A-2-103), which as of 7/1/2026 CURRENTLY adopts: the 2024 International Building Code (IBC), including Appendices C and J, § 15A-2-103(1)(a); the 2021 International Residential Code (IRC), § 15A-2-103(1)(b), UNCHANGED by the 7/1/2026 amendment, plus Appendix AQ of the 2021 IRC, § 15A-2-103(1)(c); the 2024 International Plumbing Code (IPC), § 15A-2-103(1)(d); the 2024 International Mechanical Code (IMC), § 15A-2-103(1)(e); the 2024 International Fuel Gas Code (IFGC), § 15A-2-103(1)(f); the 2024 International Energy Conservation Code (IECC), single unsplit statewide edition, § 15A-2-103(1)(h); the 2024 International Existing Building Code (IEBC), § 15A-2-103(1)(i); and the residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC), § 15A-2-103(1)(n). South Weber's own Building Department page and forms (live-checked 2026-07-16) do not publish a city-specific code-edition statement beyond referencing 'building codes' generally, so the applicable edition is the statewide-adopted edition rather than a city-specific amendment — this could not be independently confirmed on a South Weber-specific ordinance page beyond the code index (see localAmendments note on codelibrary.amlegal.com access). No city-page conflict to record since South Weber publishes no edition statement of its own to contradict the statute.
- 2023 National Electrical Code (NEC) — statewide-adopted edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment; no South Weber-specific amendment to the NEC edition was found.
- NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification; this entry previously described the 2024-cycle codes in future tense ('scheduled to take effect July 1, 2026') and as a single undifferentiated '2021 I-Codes' set. That date has now passed, so IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now individually itemized above and stated as CURRENT (2024 editions), while IRC (2021) and NEC (2023) are explicitly flagged as unchanged. Utah's statewide-mandatory code regime (Utah Code § 15A-1-204) binds South Weber directly since it publishes no city-specific edition page of its own.
Permit types & fees
Residential Building Permit (New Construction)
Required for new single-family and two-family residential construction, room additions, detached/attached garages, and any structural work regulated by the Utah State Construction Code in South Weber City. Fee is calculated using the ICC Building Valuation Data formula per South Weber's official Consolidated Fee Schedule.
Electrical / Mechanical Permit
Required for standalone electrical work (new circuits, wiring, service changes) and mechanical work (HVAC installation/replacement) in South Weber. South Weber's fee schedule lists a single combined flat fee for Electrical/Mechanical permits, distinct from its valuation-based new-construction formula. EV charger/EVSE installation is electrical work and falls under this combined Electrical/Mechanical permit; the Consolidated Fee Schedule FY2026-2027 does not publish a separate EV-specific fee line item.
Remodeling / Finish Basement Permit
Required for residential remodels and basement finishes in South Weber, including moving walls, doors, or windows, and room finishes. South Weber's fee schedule lists identical flat fees for Remodeling and Finish Basement permit types.
Roofing Permit (Structural Change Only)
Required for re-roofing that involves a structural component change in South Weber. Minor roof repairs do not require a permit per the city's official guidance.
Solar Panel / Alternative Energy Permit
Required for residential solar panel, wind turbine, and other alternative energy installations in South Weber.
Swimming Pool Permit
Required for swimming pool installation in South Weber. Prefabricated pools less than 24 inches deep are exempt per the city's official guidance.
Sign Permit (Temporary)
Required for temporary signs in South Weber, requiring both a completion inspection and Planning Commission sign-off.
Commercial Building Permit
Required for new commercial construction in South Weber. South Weber's Consolidated Fee Schedule does not publish a separate commercial building-permit fee table — the same ICC Building Valuation Data formula and 30%/$100-minimum Plan Check Fee used for residential construction apply to commercial projects, but a distinct, higher Completion Bond tier and Non-Residential Zone Conditional Use Permit fee apply.
Commercial Tenant Improvement / Tenant Finish Permit
Required for tenant improvement and remodel work in existing commercial buildings in South Weber. South Weber's Consolidated Fee Schedule does not publish a tenant-improvement-specific fee line — the same ICC-formula Building Permit Fee and Plan Check Fee that apply to new commercial construction apply to commercial tenant improvements, with the same higher commercial Completion Bond tier.
EV Charger / EVSE Permit
South Weber does not publish a distinct EV-charger/EVSE fee category. Installing electric vehicle charging equipment (a new circuit/wiring for the EVSE) is electrical work covered by the city's combined Electrical/Mechanical permit, billed at the single flat fee on the Consolidated Fee Schedule FY2026-2027. This is confirmed directly by South Weber's own electrical-mechanical-permit entry, which explicitly states EV charger/EVSE installation falls under the combined Electrical/Mechanical permit and that the fee schedule carries no EV-specific line item.
Fire Sprinkler & Fire Alarm System Review
South Weber City does not publish a standalone fire-sprinkler or fire-alarm system permit, application form, or dedicated fee schedule of its own — confirmed via the city's Fire Department page (southwebercity.gov/fire-department/) and the full FY2026-2027 Consolidated Fee Schedule. South Weber operates its own independent city Fire Department (not a joint fire district), but fire-protection review is folded into two existing processes instead of a distinct permit: (1) new commercial construction or tenant-improvement projects with fire sprinkler/alarm scope have those system plans reviewed as part of the Commercial Building Permit's Plan Check Fee, billed as outside-engineering 'professional services' (which explicitly 'includes fire protection & sprinkler system evaluations') at 100% of the city's actual cost, rather than as a separate published line-item fee; and (2) every commercial business license (new or renewal) requires a general life-safety Fire Inspection, a flat $100/year fee, which is a walkthrough (extinguishers, smoke/CO alarms, electrical, clearances) rather than a fire-sprinkler/alarm system plan review.
Change of Use / Commercial Business License (Occupancy Verification)
South Weber City does not publish a standalone 'change of use' or 'certificate of occupancy' permit application distinct from its Commercial Business License process — confirmed by South Weber's own Forms page (southwebercity.gov/i-want-to/forms/) and City Code Title 3, Business & License Regulations, neither of which lists a separately named change-of-use or certificate-of-occupancy product. A change of tenant or use in existing commercial space is instead verified through the Commercial Business License Application (Consolidated Fee Schedule, Chapter 5), which captures the parcel and zone, determines whether a Conditional Use Permit is required (Chapter 8), and requires a Fire Inspection before issuance. 'Certificate of Occupancy' language does appear elsewhere in South Weber's fee schedule, but only as the outcome of the Building Permit's final inspection for NEW construction (see this jurisdiction's Residential and Commercial Building Permit entries) — it is not a separate standalone product for a change of use in an existing building.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- 3units
3 buildings · $1.5M valuation
- Trailing 12 months
- 39units
12 of 12 months reported · #73 in Utah coverage by units
- Year to date (2026 YTD through 2026-05)
- 13units
13 buildings · $7M valuation
5 month(s) reported to Census
- Full year 2025
- 46units
42 buildings · $24.2M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity
Tips & gotchas
- South Weber is located in Davis County, Utah — despite its name (referencing the Weber River, which forms part of the city's boundary), it is NOT part of Weber County. Confirm this distinction before filing permits or comparing fee schedules with Weber County or 'unincorporated-weber' entries.
- South Weber operates its own independent Building Department led by a dedicated Building Official/Public Works Director (Mark Larsen, mlarsen@southwebercity.com) — it is not contracted out to Davis County or a third-party inspection agency for standard building permits.
- City Office Hours are Mon-Thu 8:30 AM-5:30 PM and Friday 8:00 AM-12:00 PM only (closed Friday afternoons) — narrower than many neighboring Davis County cities.
- South Weber's building permit fee (new construction) uses the ICC Building Valuation Data formula rather than a flat table; most trade/accessory permit types (Electrical/Mechanical, Remodeling, Finish Basement, Roof, Alternative Energy, Swimming Pool, Sign) instead use flat fees that bundle a refundable completion bond and, where applicable, a $100 plan check fee.
- New residential construction triggers six separate impact fees (Parks & Trails $2,096, Public Safety Fire Station $126, Recreation Building $834, Water $1,463, Storm Sewer $1,281/ERU, Transportation $3,597 for single-family detached) plus Central Weber Sewer District fees ($3,792, includes 5% administrative fee) — see Consolidated Fee Schedule Chapter 7.
- No South Weber-specific published plan-review turnaround time was found on southwebercity.gov or in the Consolidated Fee Schedule (FY2026-2027) for any permit type. Only the new-construction Residential Building Permit uses a review timeline, sourced from the Utah statutory floor (Utah Code § 10-20-909: 3-business-day screening period + 14 business days = 17 business days total for one-/two-family dwelling or townhome plan review) rather than a South Weber-published figure — all other (trade/accessory/sign) permit types are honestly left reviewTimelineDays: null with a note, per PermitBase's scoping policy that the statute applies only to dwelling-construction plan review.
- One-story detached storage-type sheds up to 200 sq ft on one- and two-family dwelling lots (120 sq ft for commercial/multi-family 4+ units) do NOT require a building permit in South Weber, per the city's official 'When Do I Need a Building Permit?' handout.
- South Weber City Code (codelibrary.amlegal.com/codes/southweberut) is a React-rendered site that does not expose ordinance body text to automated fetch — only the code index/navigation was confirmed; full Building/Construction title ordinance text was not independently rendered, consistent with the same access limitation documented for Murray's amlegal code library.