Commercial Tenant Improvement / Tenant Finish Permit in West Bountiful, Utah
Required for tenant improvement and remodel work in existing commercial buildings in West Bountiful. The city's Consolidated Fee Schedule publishes a distinct $300 deposit specifically labeled 'Commercial Tenant Improvement,' separate from the $1,000 new house/commercial construction deposit — the same 65% commercial Plan Review Fee and valuation-based fee formula apply.
Verified 2026-07-19 · Source
When you need this permit
- Tenant improvement or remodel work in an existing commercial building, regulated by the statewide-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a))
- Site plan and building plans reviewed by West Bountiful's building official (via contracted plan reviewer Sunrise Engineering) before fees are calculated and the permit issued
- Structural calculations for any structural work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Framing / Rough-In
Performed by Sunrise Engineering under contract to the City; schedule at 800-560-6151 at least 24 hours in advance.
- 2
Final Inspection
Final inspection and approval required prior to occupying the tenant space.
See the full West Bountiful inspection guide — scheduling & re-inspection fees →
Tips
- West Bountiful publishes a distinct $300 deposit specifically labeled 'Commercial Tenant Improvement' in its Consolidated Fee Schedule — lower than the $1,000 deposit for new house/commercial construction, but the 65% commercial Plan Review Fee still applies.
- As with new commercial construction, plan review and inspections are performed by contracted Sunrise Engineering (800-560-6151), not city staff directly.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Bountiful building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in West Bountiful.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in West Bountiful
Commercial Tenant Improvement / Tenant Finish Permit in other cities
Compare commercial tenant improvement / tenant finish permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your West Bountiful project checklist
Describe your project once and get every permit, document, and fee it triggers in West Bountiful — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →