Fire Sprinkler System Permit in West Bountiful, Utah

Required for installation or modification of an automatic fire sprinkler (suppression) system in West Bountiful. Fire protection system plan review and permitting for West Bountiful is handled by South Davis Metro Fire (SDMF), the fire agency serving West Bountiful, Bountiful, Centerville, North Salt Lake, and Woods Cross — this is a separate submittal and fee from the City's own building permit process.

Verified 2026-07-20 · Source

When you need this permit

  • Installation, modification, or removal from service of an automatic fire protection (suppression) system, fire pumps and related fuel tanks, jockey pumps, controllers, or a standpipe system
  • Per International Fire Code Section 104.7.2, SDMF requires a 'technical opinion and report' (peer review) of plans for these systems
  • Projects with more than 10 sprinkler devices are treated as a deferred submittal and reviewed by a qualified third-party peer reviewer rather than by SDMF directly
  • Submit plan review application and plans to fireplans@sdmetrofire.gov

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sprinkler Plan ReviewSDMF Fee Ordinance (04/2024), 'PERMITS/PLAN REVIEWS/INSPECTIONS' section, line item 'Sprinkler - Plan Review ... $100 per hour, Minimum 1 hour' — fetched directly as a PDF and rendered to confirm column alignment. This is the plan-review component referenced imprecisely on SDMF's website as 'will require a plan review fee of $100 if there are less than 10 devices' (see Deferred Submittal fee below for the 10+-device case, where this fee is waived in favor of third-party review).
$100 per hour, minimum 1 hour ($100 minimum)
Fire Sprinkler System PermitSDMF Fee Ordinance (04/2024), same section: 'Fire sprinkler system permit (3 Inspections) ... $300.' This flat $300 permit fee includes 3 inspections and is separate from (in addition to) the hourly Sprinkler Plan Review fee above. SDMF's website (sdmetrofire.gov/copy-of-plan-reviews-1) independently confirms the $300 figure under 'SUPPRESSION REVIEWS - $300 (review /2 inspections)' — the formal fee ordinance's '3 Inspections' is treated as authoritative over the website's '2 inspections' wording since the ordinance is the dated, official fee-setting document.
$300
Deferred Submittal (10+ devices)South Davis Metro Fire, Plan Reviews page (sdmetrofire.gov/copy-of-plan-reviews-1, re-fetched live 2026-07-20): 'DEFERRED SUBMITTALS - If there are more than 10 devices, the plans will need to be reviewed by a qualified 3rd party reviewer... and will not require a plan review fee.' The third-party reviewer is paid separately by the applicant; SDMF's own Sprinkler Plan Review fee (above) is waived in this case. The $300 permit fee itself is not stated as waived.
No additional SDMF plan review fee

Review timeline

Plan reviewWest Bountiful’s published plan-review target
14–14 business days

How long did your Fire Sprinkler System Permit permit actually take in West Bountiful?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Inspection 1 of 3

    SDMF Fee Ordinance (04/2024) lists the $300 Fire Sprinkler System Permit as covering '(3 Inspections)' without naming each one individually; contact SDMF at 801-677-2400 for the specific inspection stages on a given project.

  2. 2

    Inspection 2 of 3

    Second of the 3 inspections included in the $300 permit fee, per the SDMF Fee Ordinance.

  3. 3

    Inspection 3 of 3 (Final)

    Third of the 3 inspections included in the $300 permit fee, per the SDMF Fee Ordinance. Final inspections will not be scheduled until SDMF's pre-check list is complete.

See the full West Bountiful inspection guide — scheduling & re-inspection fees →

Tips

  • Fire sprinkler plan review and permitting in West Bountiful is handled entirely by South Davis Metro Fire (SDMF) — a separate agency and fee from the City's own building permit and Sunrise Engineering plan review. Submit to fireplans@sdmetrofire.gov, not the City Building Department.
  • West Bountiful's own Building Permit Application Requirements list separately notes that solar panel permits require prior approval from the South Davis Metro Fire Marshal (801-677-2407) — a reminder that SDMF sign-off can apply beyond just sprinkler/alarm installs.
  • SDMF's fee page states incomplete submissions will not be reviewed, and final inspections will not be scheduled until the pre-check list is complete.
  • Budget for both fee components: the $100/hour (1-hour minimum) Sprinkler Plan Review plus the flat $300 Fire Sprinkler System Permit fee, per SDMF's own Fee Ordinance (04/2024) — SDMF's website bundles these into a single confusingly worded line, but the formal ordinance breaks them out separately.

Frequently asked questions

West Bountiful requires a fire sprinkler system permit for: Installation, modification, or removal from service of an automatic fire protection (suppression) system, fire pumps and related fuel tanks, jockey pumps, controllers, or a standpipe system; Per International Fire Code Section 104.7.2, SDMF requires a 'technical opinion and report' (peer review) of plans for these systems; Projects with more than 10 sprinkler devices are treated as a deferred submittal and reviewed by a qualified third-party peer reviewer rather than by SDMF directly; Submit plan review application and plans to fireplans@sdmetrofire.gov. If your project isn't listed, confirm with West Bountiful City Building Department (Community Development) at (801) 292-4486 before starting work.

In West Bountiful, the published Sprinkler Plan Review is: $100 per hour, minimum 1 hour ($100 minimum). Additional published fees: Fire Sprinkler System Permit — $300; Deferred Submittal (10+ devices) — No additional SDMF plan review fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

SDMF's Plan Reviews page states a minimum 14 working day allowance from the date of submission. Projects with more than 10 sprinkler devices are deferred to a third-party peer reviewer, which may add time.

You'll need: Plan Review Application; Fire Sprinkler System Plans. Depending on your project, West Bountiful may also ask for: Third-Party Peer Review Report. See the required-documents checklist on this page for details on each.

West Bountiful requires 3 inspection(s) for a fire sprinkler system permit, in order: Inspection 1 of 3, Inspection 2 of 3, Inspection 3 of 3 (Final). Schedule each through West Bountiful City Building Department (Community Development) ((801) 292-4486).

Apply through West Bountiful City Building Department (Community Development) at 550 North 800 West, West Bountiful, UT 84087. Phone: (801) 292-4486, email: info@wbcityut.gov. Office hours: Mon–Thu 7:30 AM – 5:00 PM; Fri 7:30 AM – 3:00 PM. Official information: https://wbcityut.gov/building-permits/.

West Bountiful, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J, with Utah amendments — statewide-adopted edition per Utah Code § 15A-2-103(1)(a), currently in force in West Bountiful as in all Utah jurisdictions since July 1, 2026 (superseded the 2021 IBC).; 2021 International Residential Code (IRC) with Utah amendments — statewide-adopted edition per Utah Code § 15A-2-103(1)(b), unchanged by the July 1, 2026 code cycle flip. Note: West Bountiful's own Building Permits page (wbcityut.gov/building-permits) still instructs applicants to submit 'Building Plans/Drawings per 2015 IRC' (re-confirmed live 2026-07-16), which appears to be stale/unrevised web copy rather than a deliberate local amendment — Utah's Building Code Commission sets a single statewide IRC edition and West Bountiful does not publish any ordinance opting out of the current statewide cycle, so the current statewide 2021 IRC is used here rather than the page's stale reference.; 2024 International Plumbing Code (IPC) with Utah amendments — statewide-adopted edition per Utah Code § 15A-2-103(1)(d), in force since July 1, 2026 (superseded the 2021 IPC).; 2024 International Mechanical Code (IMC) with Utah amendments — statewide-adopted edition per Utah Code § 15A-2-103(1)(e), in force since July 1, 2026 (superseded the 2021 IMC).; 2024 International Fuel Gas Code (IFGC) — statewide-adopted edition per Utah Code § 15A-2-103(1)(f), in force since July 1, 2026; not separately itemized on West Bountiful's own Building Permits page, added here as it applies statewide.; 2024 International Existing Building Code (IEBC) with Utah amendments — statewide-adopted edition per Utah Code § 15A-2-103(1)(i), in force since July 1, 2026 (superseded the 2021 IEBC).; 2024 International Energy Conservation Code (IECC) with Utah amendments — statewide-adopted edition per Utah Code § 15A-2-103(1)(h), in force since July 1, 2026 (superseded the 2021 IECC; one edition applies statewide, no separate residential/commercial split).; 2023 National Electrical Code (NEC) — statewide-adopted edition per Utah Code § 15A-2-103(1)(g), unchanged by the July 1, 2026 code cycle flip.. Local amendments apply — see the West Bountiful overview page for the full list.

South Davis Metro Fire (SDMF) handles fire sprinkler system plan review and permitting for West Bountiful, separately from the City's building permit process. Submit plans to fireplans@sdmetrofire.gov. Per SDMF's Fee Ordinance (04/2024), the Sprinkler Plan Review is $100/hour (1-hour minimum) and the Fire Sprinkler System Permit itself is a flat $300 (includes 3 inspections).