Demolition Permit in Springerville, Arizona

Required for demolition of any structure in the Town of Springerville, including stand-alone concrete structures such as sidewalks, seawalls, or other concrete walls.

Verified 2026-07-07 · Source

When you need this permit

  • Permit required prior to demolishing a structure within Springerville town limits (submitted via the Plan/Design Review Application form)
  • Fill out a Plan Review application, to be reviewed by the Building Department, with inspections scheduled
  • Contact appropriate utilities (water, electric, gas, telephone, cable) to remove meters and wires
  • Abandonment of Septic Tank (if applicable) must be filled out by a licensed contractor and kept on file; if sewer is available, the septic tank must be collapsed before a new sewer hookup is provided Contractor
  • Obtain approval from the Water Department at Town Hall to abandon water and/or sewer service, if necessary
  • Pre-demolition inspection typically required to verify all utilities/water/sewer disconnected; final inspection required after demolition and cleanup is complete

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition Permit (per structure)Town of Springerville Fee Schedule, effective January 15, 2025. Note: the Town's separate 'Demolition/Remodeling' informational document states 'There is no cost for the demolition permits' but that additional fees apply for services such as inspection of electric power disconnection and capping water/sewer at the property line, plus possible additional municipal fees depending on future development plans for the site — the $20 figure on the January 15, 2025 fee schedule is treated as the current authoritative base permit fee, with the informational document's caveat about additional service fees (electric/water/sewer disconnection) still applying on top of it
$20.00

Review timeline

Plan reviewSpringerville’s published plan-review target
10–10 business days

How long did your Demolition Permit permit actually take in Springerville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Pre-Demolition

    Verifies all utilities and water/sewer facilities are disconnected

  2. 2

    Final

    Required after all demolition and final clean-up has been completed

See the full Springerville inspection guide — scheduling & re-inspection fees →

Tips

  • Springerville processes demolition permits through its standard Plan/Design Review Application, which carries the Town-wide 10-working-day review procedure under Municipal Code Chapter 17.88 (rather than a demolition-specific separate timeline document).
  • The Town's own 'Demolition/Remodeling' guidance says 'There is no cost for the demolition permits,' which appears to refer only to the base permit fee — the January 15, 2025 fee schedule lists a $20 per-structure demolition permit fee, and the guidance itself flags additional charges for utility-disconnection inspection and water/sewer capping/abandonment services on top of that.
  • If sewer is available to the property, an existing septic tank must be collapsed before a new sewer hookup will be provided.

Frequently asked questions

Springerville requires a demolition permit for: Permit required prior to demolishing a structure within Springerville town limits (submitted via the Plan/Design Review Application form); Fill out a Plan Review application, to be reviewed by the Building Department, with inspections scheduled; Contact appropriate utilities (water, electric, gas, telephone, cable) to remove meters and wires; Abandonment of Septic Tank (if applicable) must be filled out by a licensed contractor and kept on file; if sewer is available, the septic tank must be collapsed before a new sewer hookup is provided; Obtain approval from the Water Department at Town Hall to abandon water and/or sewer service, if necessary; Pre-demolition inspection typically required to verify all utilities/water/sewer disconnected; final inspection required after demolition and cleanup is complete. If your project isn't listed, confirm with Town of Springerville Planning & Zoning Department — Building Department at 928-333-2656 ext. 227 (Building Department); 928-333-2656 (Planning & Zoning main line); fax 928-333-5598 before starting work.

The Town of Springerville Fee Schedule (effective January 15, 2025) lists a Demolition Permit fee of $20.00 per structure. The Town's separate Demolition/Remodeling guidance notes there is no cost for the base permit itself but that additional service fees apply for utility-disconnection inspections and water/sewer capping or abandonment.

Ten (10) working days from submission of a complete Plan/Design Review application, per Town of Springerville Municipal Code Chapter 17.88, the same standard review track used for demolition permits.

You'll need: Demolition Permit Application (Plan Review Application). Depending on your project, Springerville may also ask for: Septic Tank Abandonment Form. See the required-documents checklist on this page for details on each.

Springerville requires 2 inspection(s) for a demolition permit, in order: Pre-Demolition, Final. Schedule each through Town of Springerville Planning & Zoning Department — Building Department (928-333-2656 ext. 227 (Building Department); 928-333-2656 (Planning & Zoning main line); fax 928-333-5598).

Apply through Town of Springerville Planning & Zoning Department — Building Department at 418 E. Main St., Springerville, AZ 85938. Phone: 928-333-2656 ext. 227 (Building Department); 928-333-2656 (Planning & Zoning main line); fax 928-333-5598, email: Publicly listed on the Town's Building Department page as an obfuscated/masked address; no plain-text department email address was recoverable from the live site. Contact by phone at 928-333-2656 ext. 227, or via the Town's online contact form at springervilleaz.gov/contact-us.. Office hours: Not published on the Town's Building Department page as of this review (no explicit hours-of-operation statement was found on the Building Department, Community Development, or Contact Us pages). Applicants must contact the Building Department a minimum of twenty-four (24) hours in advance to schedule an inspection, per the Town's own permit application forms.. Official information: https://www.springervilleaz.gov/building-department.

Springerville, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Springerville runs its own Planning & Zoning Department / Building Department and independently adopts and administers its own construction codes and fee schedule; it does NOT defer building permitting to Apache County or to the neighboring Town of Eagar — Springerville's own permit applications, fee schedule, and Municipal Code sections (e.g., Chapter 17.28 Walls and Fences, Chapter 17.88 Plan Review) are self-contained and administered entirely by Springerville's own Planning & Zoning/Building staff. This is confirmed independently from Springerville's own primary sources, not inferred from the Eagar precedent.; 2015 edition of the International Residential Code (IRC), as adopted by the Town of Springerville. Source: Town of Springerville 'Building Health and Safety' reference document (springervilleaz.gov, Building Department Forms), restated verbatim on multiple Town permit application checklists (Manufactured Home, Shed/Storage, Plan/Design Review).; 2015 International Building Code (IBC), as adopted by the Town of Springerville for commercial/non-residential construction. Source: Town of Springerville 'Building Health and Safety' reference document.; 2015 International Fire Code (IFC), as adopted by the Town of Springerville as its uniform fire code. Source: Town of Springerville 'Building Health and Safety' reference document.; 2015 International Mechanical Code (IMC), as adopted by the Town of Springerville. Source: Town of Springerville 'Building Health and Safety' reference document.; 2015 International Plumbing Code (IPC), as adopted by the Town of Springerville. Source: Town of Springerville 'Building Health and Safety' reference document.; 2015 International Green Building Code (IgCC), as adopted by the Town of Springerville. Source: Town of Springerville 'Building Health and Safety' reference document.; 2014 National Electrical Code (NEC), as adopted by the Town of Springerville (electrical code cycle predates the 2015 ICC set). Source: Town of Springerville 'Building Health and Safety' reference document.; Manufactured homes, mobile homes, and factory-built buildings (FBB) are regulated directly by the State of Arizona (Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing, 1110 West Washington, Suite 100, Phoenix, AZ 85007) for construction/installation standards, including HUD federal preemption under 24 CFR §3280 (construction) and §3285 (installation, non-preemptive — local jurisdictions MAY set stricter local snow-load/installation standards per the Department's own May 24, 2010 clarification letter); the Town of Springerville issues a separate local Manufactured Home Installation Permit for site installation, utility connections, accessory structures, and inspections. Source: Town of Springerville Manufactured Home Installation Permit Application (Department of Fire, Building and Life Safety letterhead) and Arizona Department of Fire, Building and Life Safety letter re: Design Roof Load Zone 'South' in Arizona (May 24, 2010).; Flood Hazards: the National Flood Insurance Program (NFIP) as adopted by the Town Council of Springerville on 10/2/2007, administered by the Apache County Engineer. Source: Town of Springerville 'Building Health and Safety' / Climate and Geographic Design reference document.; Note on code-text access: the Town's Code of Ordinances is hosted on Municode Library (library.municode.com/az/springerville) which returned HTTP 403 Forbidden on direct fetch attempts; the specific adopted code edition years above are instead sourced directly from the Town's own (non-Municode) 'Building Health and Safety' reference PDF, a primary town-published, non-mirror source, cross-confirmed as identical text appearing on at least three separate Town permit-application PDFs (Manufactured Home, Shed/Storage, and the standalone Building Health and Safety document).. Local amendments apply — see the Springerville overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Springerville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.