Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements) — Springerville, Arizona · Requirements sheet
Verified 2026-08-01 · Source: https://www.springervilleaz.gov/building-department
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements) in Springerville, Arizona
Required for new commercial construction, commercial additions, and commercial remodels/tenant improvements involving plumbing, electrical, foundation, or structural changes in the Town of Springerville. There is no separate commercial application form: commercial projects use the same Plan/Design Review Application track (Municipal Code Chapters 17.88/17.90) as residential, but at a higher $300.00 commercial Plan Design Review fee, with the building permit fee itself calculated on project valuation per the ICC/Building Valuation Data — February 2015 Charts and Formulas (Ordinance 2016-005). Commercial work is reviewed against the 2015 IBC (plus 2015 IFC/IMC/IPC/IgCC and 2014 NEC) as adopted by the Town, all commercial permits require a commercial-licensed contractor, and all commercial applications are forwarded to the Fire Department for a fire-code review.
Verified 2026-08-01 · Source
When you need this permit
- A Plan/Design Review application (Municipal Code Chapters 17.88 Plan Review and 17.90 Design Review) resulting in a building permit and inspections is the required track — the Town publishes no separate commercial building permit application form; the same Plan/Design Review Application is used, at the commercial fee tier
- All commercial permits require a commercial-licensed contractor (Arizona ROC license and class recorded on the Town's contractor/licensing supplement); rental units are classified as commercial property for this purpose Contractor
- Four (4) identical copies of the plans required; pages no larger than 24x36 inches, drawn to a scale not smaller than forty (40) feet to the inch (or as required by the Planning/Zoning Administrator), including electrical, plumbing, heating, or remodel work, drawn to the current adopted Town codes
- Plans must comply with the 2015 IBC/IFC/IMC/IPC/IgCC and 2014 NEC as adopted by the Town, plus Springerville's own Climate and Geographic Design Criteria (7,000 ft elevation; 90 mph wind with 25 mph secondary gusts, Exposure B; Seismic Design Category B; 4°F winter design temperature; 32-36 PSF roof snow loads by pitch; 18-inch frost depth)
- Plan Review Checklist items for the site plan include: lot/parcel dimensions; location/size/height/use/exterior materials of all buildings; yards and space between buildings; walls and fences; off-street parking and loading areas with number of spaces, dimensions, circulation patterns, and surface materials; driveways, access ways, and pedestrian walkways; sign location/dimensions/area/materials/lighting; location and general nature of lighting; street dedications and improvements; existing and proposed grades and drainage; all existing and proposed public and private utilities with easements shown; landscaping including all surfacing material; a vicinity sketch; and a legal description of the land with owner/developer/designer contact information
- All commercial applications will be forwarded to the Fire Department for a review of existing fire codes
- Metal buildings and some pre-assembled/prefabricated buildings require stamped engineered plans
- Work completed without first obtaining a permit may be charged double the original permitting fee, per Town Code
- Plan/Design Review approval becomes void six months after approval if a building permit has not been issued; an extension may be granted if requested prior to expiration
- Inspections must be scheduled a minimum of twenty-four (24) hours in advance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Before concrete pour; footings must reach the Town's 18-inch frost line depth below finish grade
- 2
Rough-In (Framing, Electrical, Plumbing, Mechanical)
Structural framing and rough trade work before closing walls; two mandatory inspections are included in the $100 inspection fee, with additional inspections at $50 each — a full list of required inspections for the specific project is provided by the Building Department upon request
- 3
Final / Certificate of Occupancy
All work complete per approved plans; Certificate of Occupancy ($30.00) issued — schedule all inspections a minimum of 24 hours in advance
See the full Springerville inspection guide — scheduling & re-inspection fees →
Tips
- TENANT IMPROVEMENTS ARE NOT A DISTINCT PERMIT TYPE in Springerville: the Town publishes no tenant-improvement application, fee line, or timeline anywhere (checked the Building Department page's full form list, the January 15, 2025 Fee Schedule in full, and the Plan/Design Review packet). A commercial remodel/TI is simply 'remodeling of existing structures that include plumbing, electrical, foundation, or structural changes' on the Town's own Permits Required list, processed through the same Plan/Design Review ($300 commercial fee) and valuation-based building permit track as new commercial construction.
- The $300.00 commercial Plan Design Review fee is the only commercial-specific line on the entire fee schedule — everything else (valuation-based permit fee, $100 for 2 mandatory inspections, $50 additional inspections, $85 extension, $30 Certificate of Occupancy) is shared with the residential track.
- The building permit fee itself is valuation-based per the ICC/Building Valuation Data — February 2015 Charts and Formulas (Ordinance 2016-005); the Town publishes the formula authority but no standalone dollar-tier table, so get a project-specific quote from the Building Department (928-333-2656 ext. 227) before budgeting.
- All commercial applications are forwarded to the Fire Department for a review of existing fire codes — stated on the Town's own permit application information sheets; budget schedule margin for this step even though the Town's published review clock is 10 working days.
- Springerville does not publish a standalone A.R.S. §9-835 licensing-time-frames compliance document; its 10-working-day review standard is instead codified directly in Municipal Code Chapter 17.88 and restated on every permit application checklist.
- Rental units are classified as commercial property — any permit work on a rental requires a commercial-licensed contractor, and by extension this commercial permit track. Contractor
- Springerville administers its own commercial permitting entirely in-house — it does not share building-safety services with neighboring Eagar (the twin towns' only joint operation is the Round Valley Fire & Medical Department for fire/EMS response) nor defer to Apache County.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Springerville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Springerville.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Springerville
Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements) in other cities
Look up this fee in a different city →
Now live
Build your Springerville project checklist
Describe your project once and get every permit, document, and fee it triggers in Springerville — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →