Skip to main content
PermitBase

Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements) in Springerville, Arizona

Required for new commercial construction, commercial additions, and commercial remodels/tenant improvements involving plumbing, electrical, foundation, or structural changes in the Town of Springerville. There is no separate commercial application form: commercial projects use the same Plan/Design Review Application track (Municipal Code Chapters 17.88/17.90) as residential, but at a higher $300.00 commercial Plan Design Review fee, with the building permit fee itself calculated on project valuation per the ICC/Building Valuation Data — February 2015 Charts and Formulas (Ordinance 2016-005). Commercial work is reviewed against the 2015 IBC (plus 2015 IFC/IMC/IPC/IgCC and 2014 NEC) as adopted by the Town, all commercial permits require a commercial-licensed contractor, and all commercial applications are forwarded to the Fire Department for a fire-code review.

Verified 2026-08-01 · Source

When you need this permit

  • A Plan/Design Review application (Municipal Code Chapters 17.88 Plan Review and 17.90 Design Review) resulting in a building permit and inspections is the required track — the Town publishes no separate commercial building permit application form; the same Plan/Design Review Application is used, at the commercial fee tier
  • All commercial permits require a commercial-licensed contractor (Arizona ROC license and class recorded on the Town's contractor/licensing supplement); rental units are classified as commercial property for this purpose Contractor
  • Four (4) identical copies of the plans required; pages no larger than 24x36 inches, drawn to a scale not smaller than forty (40) feet to the inch (or as required by the Planning/Zoning Administrator), including electrical, plumbing, heating, or remodel work, drawn to the current adopted Town codes
  • Plans must comply with the 2015 IBC/IFC/IMC/IPC/IgCC and 2014 NEC as adopted by the Town, plus Springerville's own Climate and Geographic Design Criteria (7,000 ft elevation; 90 mph wind with 25 mph secondary gusts, Exposure B; Seismic Design Category B; 4°F winter design temperature; 32-36 PSF roof snow loads by pitch; 18-inch frost depth)
  • Plan Review Checklist items for the site plan include: lot/parcel dimensions; location/size/height/use/exterior materials of all buildings; yards and space between buildings; walls and fences; off-street parking and loading areas with number of spaces, dimensions, circulation patterns, and surface materials; driveways, access ways, and pedestrian walkways; sign location/dimensions/area/materials/lighting; location and general nature of lighting; street dedications and improvements; existing and proposed grades and drainage; all existing and proposed public and private utilities with easements shown; landscaping including all surfacing material; a vicinity sketch; and a legal description of the land with owner/developer/designer contact information
  • All commercial applications will be forwarded to the Fire Department for a review of existing fire codes
  • Metal buildings and some pre-assembled/prefabricated buildings require stamped engineered plans
  • Work completed without first obtaining a permit may be charged double the original permitting fee, per Town Code
  • Plan/Design Review approval becomes void six months after approval if a building permit has not been issued; an extension may be granted if requested prior to expiration
  • Inspections must be scheduled a minimum of twenty-four (24) hours in advance

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plan Design Review Fee — CommercialTown of Springerville Fee Schedule, effective January 15, 2025 — three times the $100.00 residential review fee; this is the only commercial-specific fee line on the schedule
$300.00
Building Permit FeeTown of Springerville Fee Schedule, effective January 15, 2025 — valuation-based, not a flat fee; the Town publishes the formula source but no standalone dollar-tier table, so contact the Building Department (928-333-2656 ext. 227) for a project-specific quote
Varies in accordance with IBC/UBC Building Valuation Data — February 2015 Charts and Formulas, adopted in Ordinance 2016-005
3rd Party Review of any plan or designTown of Springerville Fee Schedule, effective January 15, 2025 — relevant to commercial projects where the Town outsources structural or specialty plan review
Applicant pays the difference in review costs
Mandatory Inspections (2)Town of Springerville Fee Schedule, effective January 15, 2025
$100.00
Additional InspectionsTown of Springerville Fee Schedule, effective January 15, 2025
$50.00
Extension Fee (6 months)Town of Springerville Fee Schedule, effective January 15, 2025
$85.00
Certificate of OccupancyTown of Springerville Fee Schedule, effective January 15, 2025
$30.00

Review timeline

Plan reviewSpringerville’s published plan-review target
10–10 business days

How long did your Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements) permit actually take in Springerville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Before concrete pour; footings must reach the Town's 18-inch frost line depth below finish grade

  2. 2

    Rough-In (Framing, Electrical, Plumbing, Mechanical)

    Structural framing and rough trade work before closing walls; two mandatory inspections are included in the $100 inspection fee, with additional inspections at $50 each — a full list of required inspections for the specific project is provided by the Building Department upon request

  3. 3

    Final / Certificate of Occupancy

    All work complete per approved plans; Certificate of Occupancy ($30.00) issued — schedule all inspections a minimum of 24 hours in advance

See the full Springerville inspection guide — scheduling & re-inspection fees →

Tips

  • TENANT IMPROVEMENTS ARE NOT A DISTINCT PERMIT TYPE in Springerville: the Town publishes no tenant-improvement application, fee line, or timeline anywhere (checked the Building Department page's full form list, the January 15, 2025 Fee Schedule in full, and the Plan/Design Review packet). A commercial remodel/TI is simply 'remodeling of existing structures that include plumbing, electrical, foundation, or structural changes' on the Town's own Permits Required list, processed through the same Plan/Design Review ($300 commercial fee) and valuation-based building permit track as new commercial construction.
  • The $300.00 commercial Plan Design Review fee is the only commercial-specific line on the entire fee schedule — everything else (valuation-based permit fee, $100 for 2 mandatory inspections, $50 additional inspections, $85 extension, $30 Certificate of Occupancy) is shared with the residential track.
  • The building permit fee itself is valuation-based per the ICC/Building Valuation Data — February 2015 Charts and Formulas (Ordinance 2016-005); the Town publishes the formula authority but no standalone dollar-tier table, so get a project-specific quote from the Building Department (928-333-2656 ext. 227) before budgeting.
  • All commercial applications are forwarded to the Fire Department for a review of existing fire codes — stated on the Town's own permit application information sheets; budget schedule margin for this step even though the Town's published review clock is 10 working days.
  • Springerville does not publish a standalone A.R.S. §9-835 licensing-time-frames compliance document; its 10-working-day review standard is instead codified directly in Municipal Code Chapter 17.88 and restated on every permit application checklist.
  • Rental units are classified as commercial property — any permit work on a rental requires a commercial-licensed contractor, and by extension this commercial permit track. Contractor
  • Springerville administers its own commercial permitting entirely in-house — it does not share building-safety services with neighboring Eagar (the twin towns' only joint operation is the Round Valley Fire & Medical Department for fire/EMS response) nor defer to Apache County.

Frequently asked questions

Springerville requires a commercial building permit (new construction, additions, remodels, tenant improvements) for: A Plan/Design Review application (Municipal Code Chapters 17.88 Plan Review and 17.90 Design Review) resulting in a building permit and inspections is the required track — the Town publishes no separate commercial building permit application form; the same Plan/Design Review Application is used, at the commercial fee tier; All commercial permits require a commercial-licensed contractor (Arizona ROC license and class recorded on the Town's contractor/licensing supplement); rental units are classified as commercial property for this purpose; Four (4) identical copies of the plans required; pages no larger than 24x36 inches, drawn to a scale not smaller than forty (40) feet to the inch (or as required by the Planning/Zoning Administrator), including electrical, plumbing, heating, or remodel work, drawn to the current adopted Town codes; Plans must comply with the 2015 IBC/IFC/IMC/IPC/IgCC and 2014 NEC as adopted by the Town, plus Springerville's own Climate and Geographic Design Criteria (7,000 ft elevation; 90 mph wind with 25 mph secondary gusts, Exposure B; Seismic Design Category B; 4°F winter design temperature; 32-36 PSF roof snow loads by pitch; 18-inch frost depth); Plan Review Checklist items for the site plan include: lot/parcel dimensions; location/size/height/use/exterior materials of all buildings; yards and space between buildings; walls and fences; off-street parking and loading areas with number of spaces, dimensions, circulation patterns, and surface materials; driveways, access ways, and pedestrian walkways; sign location/dimensions/area/materials/lighting; location and general nature of lighting; street dedications and improvements; existing and proposed grades and drainage; all existing and proposed public and private utilities with easements shown; landscaping including all surfacing material; a vicinity sketch; and a legal description of the land with owner/developer/designer contact information; All commercial applications will be forwarded to the Fire Department for a review of existing fire codes; Metal buildings and some pre-assembled/prefabricated buildings require stamped engineered plans; Work completed without first obtaining a permit may be charged double the original permitting fee, per Town Code; Plan/Design Review approval becomes void six months after approval if a building permit has not been issued; an extension may be granted if requested prior to expiration; Inspections must be scheduled a minimum of twenty-four (24) hours in advance. If your project isn't listed, confirm with Town of Springerville Planning & Zoning Department — Building Department at 928-333-2656 ext. 227 (Building Department); 928-333-2656 (Planning & Zoning main line); fax 928-333-5598 before starting work.

The commercial Plan Design Review fee is a flat $300.00 (Fee Schedule effective January 15, 2025). The building permit fee itself is valuation-based per the ICC/Building Valuation Data — February 2015 Charts and Formulas (Ordinance 2016-005) — no standalone dollar-tier table is published, so contact the Building Department at 928-333-2656 ext. 227 for a project-specific quote. Add $100.00 for the two mandatory inspections and $30.00 for the Certificate of Occupancy.

The Plan/Design Review step has a published ten (10) working-day review timeline per Municipal Code Chapter 17.88, the same Town-wide standard applied to residential permits; an additional 5 days applies if the zoning administrator routes the application through the Planning & Zoning Commission. All commercial applications are also forwarded to the Fire Department for a fire-code review.

You'll need: Plan/Design Review Application; Construction Plans (4 identical copies); Contractor Licensing Supplement. See the required-documents checklist on this page for details on each.

Springerville requires 3 inspection(s) for a commercial building permit (new construction, additions, remodels, tenant improvements), in order: Foundation/Footing, Rough-In (Framing, Electrical, Plumbing, Mechanical), Final / Certificate of Occupancy. Schedule each through Town of Springerville Planning & Zoning Department — Building Department (928-333-2656 ext. 227 (Building Department); 928-333-2656 (Planning & Zoning main line); fax 928-333-5598).

Apply through Town of Springerville Planning & Zoning Department — Building Department at 418 E. Main St., Springerville, AZ 85938. Phone: 928-333-2656 ext. 227 (Building Department); 928-333-2656 (Planning & Zoning main line); fax 928-333-5598, email: Publicly listed on the Town's Building Department page as an obfuscated/masked address; no plain-text department email address was recoverable from the live site. Contact by phone at 928-333-2656 ext. 227, or via the Town's online contact form at springervilleaz.gov/contact-us.. Office hours: Not published on the Town's Building Department page as of this review (no explicit hours-of-operation statement was found on the Building Department, Community Development, or Contact Us pages). Applicants must contact the Building Department a minimum of twenty-four (24) hours in advance to schedule an inspection, per the Town's own permit application forms.. Official information: https://www.springervilleaz.gov/building-department.

No. The Town of Springerville publishes no distinct tenant-improvement permit, fee, or timeline. A commercial remodel or TI involving plumbing, electrical, foundation, or structural changes is permitted through the Town's standard Plan/Design Review track — at the $300.00 commercial review fee — followed by a valuation-based building permit, exactly like other commercial work.

The Town's published rule is that all commercial permits require a commercial-licensed contractor (and rental units count as commercial property). The Town's licensing supplement does list the A.R.S. §32-1121A.5/.6 owner-builder/owner-developer exemptions, but §32-1121A.5 by its own terms is limited to property not sold or rented for at least one year after completion — confirm applicability with the Building Department before relying on an exemption for commercial work.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Springerville.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.