Demolition Permit in Cave Creek, Arizona

Required for demolition of any residential or commercial structure in Cave Creek, distinctly fee-classified by structure type on the Town's Comprehensive Fee Schedule.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required before demolishing a residential, accessory, or commercial structure within Cave Creek town limits
  • All permits are subject to the Town's uniform work-commencing-before-permit-issuance penalty (an additional fee equal to the permit and plan review fee) if demolition begins before the permit is issued
  • Applicants should independently confirm any Maricopa County Air Quality Department (asbestos/NESHAP) clearance requirements, as Cave Creek's own published materials do not detail a county coordination step (see tips)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition — Accessory StructureTown of Cave Creek Comprehensive Fee Schedule, Demolitions
$184.00
Demolition — Single Family DwellingTown of Cave Creek Comprehensive Fee Schedule, Demolitions
$184.00
Demolition — CommercialTown of Cave Creek Comprehensive Fee Schedule, Demolitions
$307.00
Temporary Trailers (sales/construction)Town of Cave Creek Comprehensive Fee Schedule, Other Permit Fees (related temporary-structure category)
$554.00
Plan Review Fee, StandardTown of Cave Creek Comprehensive Fee Schedule, Plan Review Fees
65% of the permit fee (minimum $50); flat-fee demolition permits have $0 plan review fee

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Cave Creek?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verifies site condition after demolition is complete

See the full Cave Creek inspection guide — scheduling & re-inspection fees →

Tips

  • As of July 2026, the Town of Cave Creek does not appear to publish permit-specific plan review turnaround times for demolition permits on its public website. There is no verifiable online source for this — call the Town of Cave Creek Building and Fire Safety Department directly at 480-488-6622.
  • Cave Creek's demolition fees are flat, not valuation-based: $184 for a single-family dwelling or accessory structure, $307 for a commercial structure, per the Comprehensive Fee Schedule.
  • The Town's published Building & Fire Code Compliance and Comprehensive Fee Schedule materials do not detail a Maricopa County Air Quality (asbestos/NESHAP) or Dust Control coordination requirement the way some neighboring cities do — applicants should independently confirm any county-level clearance obligations before demolition, since Cave Creek falls within Maricopa County's regional air-quality jurisdiction.

Frequently asked questions

Cave Creek requires a demolition permit for: Building permit required before demolishing a residential, accessory, or commercial structure within Cave Creek town limits; All permits are subject to the Town's uniform work-commencing-before-permit-issuance penalty (an additional fee equal to the permit and plan review fee) if demolition begins before the permit is issued; Applicants should independently confirm any Maricopa County Air Quality Department (asbestos/NESHAP) clearance requirements, as Cave Creek's own published materials do not detail a county coordination step (see tips). If your project isn't listed, confirm with Town of Cave Creek Building and Fire Safety Department at 480-488-1400 (Main); 480-488-6637 / 480-488-6622 (Building Official / Building Department); 480-488-6631 (Plans Examiner) before starting work.

$184.00 for a single-family dwelling or accessory structure, or $307.00 for a commercial structure, per the Town of Cave Creek Comprehensive Fee Schedule (effective February 1, 2025).

Cave Creek does not publish a plan-review timeline for this permit. Contact Town of Cave Creek Building and Fire Safety Department at 480-488-1400 (Main); 480-488-6637 / 480-488-6622 (Building Official / Building Department); 480-488-6631 (Plans Examiner) for current turnaround.

You'll need: Building Permit Application (Demolition); Site Plan. See the required-documents checklist on this page for details on each.

Cave Creek requires 1 inspection(s) for a demolition permit, in order: Final. Schedule each through Town of Cave Creek Building and Fire Safety Department (480-488-1400 (Main); 480-488-6637 / 480-488-6622 (Building Official / Building Department); 480-488-6631 (Plans Examiner)).

Apply through Town of Cave Creek Building and Fire Safety Department at 37622 N. Cave Creek Road, Cave Creek, AZ 85331. Phone: 480-488-1400 (Main); 480-488-6637 / 480-488-6622 (Building Official / Building Department); 480-488-6631 (Plans Examiner), email: ahicks@cavecreekaz.gov (Adam Hicks, Building Official/Fire Marshal); jlombardo@cavecreekaz.gov (Jenifer Lombardo, Plans Examiner/Building Inspector); twilgus@cavecreekaz.gov (Tracie Wilgus, Sr. Permit Tech). Office hours: Monday - Thursday, 7 a.m. to 5 p.m. All permit applications, plan reviews, inspection requests, and payments must be submitted through the Town's online portal, the SmartGov Community Platform (twn-cavecreek-az.smartgovcommunity.com/Public/Home) — effective as the Town's exclusive permitting channel per the Town's Online Permitting and Inspection Service notice.. Official information: https://www.cavecreekaz.gov/577/Building-Fire-Code-Compliance.

Cave Creek, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. § 9-802 authorizes municipalities to adopt codes or public records by reference without setting forth their provisions in full, provided the adopting ordinance is published in full). The Town of Cave Creek independently adopts and administers its own construction codes through its Building and Fire Safety Department; it does not defer permitting to Maricopa County. Source: Town of Cave Creek Ordinance No. 2025-08 (adopted November 18, 2025, effective January 1, 2026).; 2024 International Building Code (IBC), as published by the International Code Council, adopted by reference (Town Code Title XV, Chapter 151, § 151.01), with Town of Cave Creek amendments, effective January 1, 2026. Source: Town of Cave Creek Ordinance No. 2025-08, Exhibit A.1 and A.2, Section 1.; 2024 International Residential Code (IRC), as published by the International Code Council, adopted by reference (§ 151.02), with Town of Cave Creek amendments, effective January 1, 2026. Chapter 11 (Energy Efficiency) of the 2024 IRC is deleted in its entirety and replaced with Chapter 11 of the 2018 IRC. Source: Town of Cave Creek Ordinance No. 2025-08, Section 2.; 2024 International Mechanical Code (IMC), adopted by reference (§ 151.03), with Town of Cave Creek amendments, effective January 1, 2026. Source: Town of Cave Creek Ordinance No. 2025-08, Section 3.; 2025 International Plumbing Code (IPC), adopted by reference (§ 151.04), with Town of Cave Creek amendments, effective January 1, 2026 (the Town's Building & Fire Code Compliance summary page separately lists this as the '2024 International Plumbing Code' — the governing Ordinance No. 2025-08 text itself specifies the 2025 edition; treat the Ordinance as authoritative). Source: Town of Cave Creek Ordinance No. 2025-08, Section 4.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference (§ 151.05), with Town of Cave Creek amendments, effective January 1, 2026. Source: Town of Cave Creek Ordinance No. 2025-08, Section 5.; 2025 International Fire Code (IFC), adopted by reference (§ 151.06) as the Town's uniform fire code, with Town of Cave Creek amendments; administered by the Building and Fire Safety Department under the Chief Building and Fire Code Official. Appendix B (Fire Flow Requirements for Buildings) and Appendix D (Fire Apparatus Access Roads) are adopted, with Appendix D.102.1 amended to require an approved fire apparatus access road capable of supporting an imposed load of fire apparatus weighing up to 50,000 pounds. Annual fire and life safety inspections are required for all occupancies and buildings except one- and two-family dwellings. Source: Town of Cave Creek Ordinance No. 2025-08, Section 6.; Town of Cave Creek Sprinkler Code (§ 151.07), originally adopted from Chapter 9 of the 2003 International Fire Code in July 2004 and unchanged since; automatic fire sprinkler systems in new and existing buildings are governed by this Town-specific sprinkler code rather than the IFC's own Section 903 (which is deleted and replaced by reference to § 151.07). Source: Town of Cave Creek Ordinance No. 2025-08, Section 6(2)-(3) and Section 7.; 2024 International Fuel Gas Code (IFGC), adopted by reference (§ 151.08), with Town of Cave Creek amendments, effective January 1, 2026. Source: Town of Cave Creek Ordinance No. 2025-08, Section 8.; 2025 International Existing Building Code (IEBC), adopted by reference (§ 151.09), with Town of Cave Creek amendments, effective January 1, 2026. Source: Town of Cave Creek Ordinance No. 2025-08, Section 9.; 2024 International Energy Conservation Code (IECC), adopted by reference (§ 151.10), effective January 1, 2026, EXCEPT that Chapters R1 through R5 of the IECC's residential section are deleted in their entirety and replaced with Chapters R1 through R5 of the 2018 IECC — so residential energy compliance in Cave Creek runs on the 2018 IECC residential provisions even though the commercial IECC baseline is 2024. Source: Town of Cave Creek Ordinance No. 2025-08, Section 10.; 2024 International Pool and Spa Code (ISPSC), adopted by reference (§ 151.11 International Swimming Pool and Spa Code), effective January 1, 2026; all swimming pools, spas, and hot tubs must comply with this code, and pool/spa/hot-tub enclosures must comply with A.R.S. § 36-1681 (Arizona's pool barrier statute). Swimming pools and spas are issued under a separate permit from the building permit. Source: Town of Cave Creek Ordinance No. 2025-08, Section 11; Town of Cave Creek Residential Plan Review Check List (rev. 6/15/2026).; ICC A117.1-2017 (Standard for Accessible and Usable Buildings and Facilities), adopted as part of the Town's code suite alongside the 2024 IBC. Source: Town of Cave Creek Ordinance No. 2025-08 (preamble); Town of Cave Creek Commercial Plan Submittal Guidelines.; All prior versions of Chapter 151 (Building Code § 151.01, Residential Code § 151.02, Mechanical Code § 151.03, Plumbing Code § 151.04, Electrical Code § 151.05, Fire Code § 151.06, Fuel Gas Code § 151.08, Existing Building Code § 151.09, and Energy Conservation Code § 151.10) were repealed in their entirety and replaced by Ordinance No. 2025-08, effective January 1, 2026; all former conflicting ordinances were repealed as of that date. Source: Town of Cave Creek Ordinance No. 2025-08, Sections 1-2 (Repeal, Effective Date).. Local amendments apply — see the Cave Creek overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cave Creek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.