Residential Building Permit (New Construction) in Cave Creek, Arizona

Required for new single-family and two-family dwelling construction in the Town of Cave Creek. Reviewed against the 2024 IRC (with 2018 IRC Chapter 11 energy provisions) and Town of Cave Creek amendments, effective January 1, 2026. All applications are submitted through the Town's SmartGov Community Platform online portal.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for new single-family and two-family dwelling construction within Cave Creek town limits
  • Plans must comply with the 2024 IRC and Town of Cave Creek amendments, including Climatic and Geographic Design Criteria (105 mph wind; Seismic Design Category B; negligible weathering; 0 frost line depth; moderate-to-heavy termite potential)
  • Mandatory residential cooling capable of maintaining 85°F or below in habitable rooms, bathrooms, and toilet rooms (IRC R325.8.2, as amended)
  • Site/construction plans (PDF, max. 24" x 36") with structural calcs (if required), truss calcs, and manufacturer's cut sheets must accompany the submittal; drawn to 1/4" = 1' scale (3/16" = 1' may be accepted)
  • Plans must indicate yard lines including electric run, water meter/well location and size, sewer/septic location and line size, and gas line/meter location
  • Swimming pools and spas are permitted separately and must be notated on the plan if shown
  • For properties on Town water supply, plans must show whether a fire hydrant is located within 600 feet of the property with a lineal-foot measurement
  • Driveway must meet Town of Cave Creek driveway standards
  • Submittal via the Town's SmartGov Community Platform online portal (twn-cavecreek-az.smartgovcommunity.com)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Based on ValuationTown of Cave Creek Comprehensive Fee Schedule, effective February 1, 2025 (Development Services, Building Permit Fees); new construction valuation is based on the most recently adopted ICC Building Valuation Data (BVD) table
$47.74 (valuation $1-$500); $47.74 + $7.23 per additional $100 to $2,000; $140.33 + $20.25 per additional $1,000 to $25,000; $788.44 + $20.25 per additional $1,000 to $50,000; $1,297.67 + $13.02 per additional $1,000 to $100,000; $2,002.20 + $11.57 per additional $1,000 to $500,000; $6,514.38 + $10.13 per additional $1,000 to $1,000,000; $11,297.09 + $7.23 per additional $1,000 above $1,000,000
Plan Review Fee, StandardTown of Cave Creek Comprehensive Fee Schedule, Plan Review Fees
65% of the permit fee (minimum $50); if the permit is a flat fee, the plan review fee is $0
Additional Valuations (Garages/Patios/Decks/Barns/Sun Rooms)Town of Cave Creek Comprehensive Fee Schedule, Additional Valuations
Residential garages $55.50/sq ft; covered decks/patios/carports $21.60/sq ft; uncovered decks $16.60/sq ft; wood barns $23.00/sq ft; metal barns $9.00/sq ft; sun room/Arizona room $100.00/sq ft; mare motel $5.00/sq ft
Additional Plan Reviews (changes, lost plans, or comment sheets)Town of Cave Creek Comprehensive Fee Schedule
$123.00 per hour
Inspections or services with no specifically indicated feeTown of Cave Creek Comprehensive Fee Schedule, Inspection Fees
$150.00 per hour ($150.00 per hour, minimum 2 hours, for inspections outside normal building hours)
Reinspection (after first and one subsequent failed inspection)Town of Cave Creek Comprehensive Fee Schedule; requires a 24-hour waiting period after each failed subsequent inspection
$100.00 per reinspection

Review timeline

Plan review
Not published — contact the department

How long did your Residential Building Permit (New Construction) permit actually take in Cave Creek?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing/Foundation

    Before concrete pour; verifies footing depth/size, reinforcing steel, foundation plate bolting

  2. 2

    Underslab Plumbing / Underfloor

    Underground plumbing and underfloor space ventilation before slab or floor closure

  3. 3

    Framing

    Structural framing, shear/roof sheathing, connections per 2024 IRC and Town Design Criteria

  4. 4

    Insulation

    Verifies insulation R-values and Building Thermal Envelope per 2018 IECC (Chapters R1-R5, as adopted by the Town in place of the 2024 IECC residential chapters)

  5. 5

    Drywall

    Lath/gypsum board inspection before taping/finishing

  6. 6

    Plumbing Rough / Mechanical / Fuel Gas Piping

    Rough-in plumbing, mechanical, and gas piping trades

  7. 7

    Final

    All trades and final building inspection complete per approved plans

See the full Cave Creek inspection guide — scheduling & re-inspection fees →

Tips

  • As of July 2026, the Town of Cave Creek does not appear to publish permit-specific plan review turnaround times for new residential construction on its public website. The Town publishes detailed permit requirements, a Residential Plan Review Check List, and process information, but not category-specific review timelines (unlike some neighboring Arizona cities that publish a dedicated Plan Review Timeframes Guideline). There is no verifiable online source for this — call the Town of Cave Creek Building and Fire Safety Department directly at 480-488-6622 or 480-488-1400.
  • The Town's own Residential Plan Review Check List (rev. 6/15/2026) is unusually detailed and section-by-section, citing exact IRC sections for foundation, floor plan, elevations, structural, plumbing, mechanical, electrical, and 2018 IECC energy compliance — reviewing this document before submittal materially reduces the risk of comment-sheet rejections (each round after the first two is billed at $123/hour).
  • Cave Creek's residential energy code is NOT the 2024 IECC used for the rest of the code suite — Chapter 11 of the IRC (energy) is deleted and replaced with the 2018 IRC's Chapter 11, and the IECC's residential Chapters R1-R5 are separately deleted and replaced with the 2018 IECC equivalents. A full RESCheck Report per 2018 IECC is required if construction methods are not code-prescriptive.
  • Truss calculations and layout are required as a matter of Town of Cave Creek administrative policy, not merely when triggered by span/loading — budget for this in every new residential submittal.
  • Swimming pools and spas are NOT covered by the Residential Building Permit — they require a separate permit under the 2024 International Pool and Spa Code.

Frequently asked questions

Cave Creek requires a residential building permit (new construction) for: Building permit required for new single-family and two-family dwelling construction within Cave Creek town limits; Plans must comply with the 2024 IRC and Town of Cave Creek amendments, including Climatic and Geographic Design Criteria (105 mph wind; Seismic Design Category B; negligible weathering; 0 frost line depth; moderate-to-heavy termite potential); Mandatory residential cooling capable of maintaining 85°F or below in habitable rooms, bathrooms, and toilet rooms (IRC R325.8.2, as amended); Site/construction plans (PDF, max. 24" x 36") with structural calcs (if required), truss calcs, and manufacturer's cut sheets must accompany the submittal; drawn to 1/4" = 1' scale (3/16" = 1' may be accepted); Plans must indicate yard lines including electric run, water meter/well location and size, sewer/septic location and line size, and gas line/meter location; Swimming pools and spas are permitted separately and must be notated on the plan if shown; For properties on Town water supply, plans must show whether a fire hydrant is located within 600 feet of the property with a lineal-foot measurement; Driveway must meet Town of Cave Creek driveway standards; Submittal via the Town's SmartGov Community Platform online portal (twn-cavecreek-az.smartgovcommunity.com). If your project isn't listed, confirm with Town of Cave Creek Building and Fire Safety Department at 480-488-1400 (Main); 480-488-6637 / 480-488-6622 (Building Official / Building Department); 480-488-6631 (Plans Examiner) before starting work.

In Cave Creek, the published Building Permit Fee — Based on Valuation is: $47.74 (valuation $1-$500); $47.74 + $7.23 per additional $100 to $2,000; $140.33 + $20.25 per additional $1,000 to $25,000; $788.44 + $20.25 per additional $1,000 to $50,000; $1,297.67 + $13.02 per additional $1,000 to $100,000; $2,002.20 + $11.57 per additional $1,000 to $500,000; $6,514.38 + $10.13 per additional $1,000 to $1,000,000; $11,297.09 + $7.23 per additional $1,000 above $1,000,000. Additional published fees: Plan Review Fee, Standard — 65% of the permit fee (minimum $50); if the permit is a flat fee, the plan review fee is $0; Additional Valuations (Garages/Patios/Decks/Barns/Sun Rooms) — Residential garages $55.50/sq ft; covered decks/patios/carports $21.60/sq ft; uncovered decks $16.60/sq ft; wood barns $23.00/sq ft; metal barns $9.00/sq ft; sun room/Arizona room $100.00/sq ft; mare motel $5.00/sq ft; Additional Plan Reviews (changes, lost plans, or comment sheets) — $123.00 per hour; Inspections or services with no specifically indicated fee — $150.00 per hour ($150.00 per hour, minimum 2 hours, for inspections outside normal building hours); Reinspection (after first and one subsequent failed inspection) — $100.00 per reinspection. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

As of July 2026, the Town of Cave Creek does not publish a permit-specific plan review turnaround guideline for new residential construction, unlike some neighboring Arizona municipalities. Call the Building and Fire Safety Department directly at 480-488-6622 for a current estimate before planning around a specific timeline.

You'll need: Single Family Dwelling Checklist (2024); Residential Plan Review Check List (2021 Residential Code, rev. 6/15/2026); Site/Plot Plan; Construction Drawings and Structural Calculations. See the required-documents checklist on this page for details on each.

Cave Creek requires 7 inspection(s) for a residential building permit (new construction), in order: Footing/Foundation, Underslab Plumbing / Underfloor, Framing, Insulation, Drywall, Plumbing Rough / Mechanical / Fuel Gas Piping, Final. Schedule each through Town of Cave Creek Building and Fire Safety Department (480-488-1400 (Main); 480-488-6637 / 480-488-6622 (Building Official / Building Department); 480-488-6631 (Plans Examiner)).

Apply through Town of Cave Creek Building and Fire Safety Department at 37622 N. Cave Creek Road, Cave Creek, AZ 85331. Phone: 480-488-1400 (Main); 480-488-6637 / 480-488-6622 (Building Official / Building Department); 480-488-6631 (Plans Examiner), email: ahicks@cavecreekaz.gov (Adam Hicks, Building Official/Fire Marshal); jlombardo@cavecreekaz.gov (Jenifer Lombardo, Plans Examiner/Building Inspector); twilgus@cavecreekaz.gov (Tracie Wilgus, Sr. Permit Tech). Office hours: Monday - Thursday, 7 a.m. to 5 p.m. All permit applications, plan reviews, inspection requests, and payments must be submitted through the Town's online portal, the SmartGov Community Platform (twn-cavecreek-az.smartgovcommunity.com/Public/Home) — effective as the Town's exclusive permitting channel per the Town's Online Permitting and Inspection Service notice.. Official information: https://www.cavecreekaz.gov/577/Building-Fire-Code-Compliance.

Cave Creek, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. § 9-802 authorizes municipalities to adopt codes or public records by reference without setting forth their provisions in full, provided the adopting ordinance is published in full). The Town of Cave Creek independently adopts and administers its own construction codes through its Building and Fire Safety Department; it does not defer permitting to Maricopa County. Source: Town of Cave Creek Ordinance No. 2025-08 (adopted November 18, 2025, effective January 1, 2026).; 2024 International Building Code (IBC), as published by the International Code Council, adopted by reference (Town Code Title XV, Chapter 151, § 151.01), with Town of Cave Creek amendments, effective January 1, 2026. Source: Town of Cave Creek Ordinance No. 2025-08, Exhibit A.1 and A.2, Section 1.; 2024 International Residential Code (IRC), as published by the International Code Council, adopted by reference (§ 151.02), with Town of Cave Creek amendments, effective January 1, 2026. Chapter 11 (Energy Efficiency) of the 2024 IRC is deleted in its entirety and replaced with Chapter 11 of the 2018 IRC. Source: Town of Cave Creek Ordinance No. 2025-08, Section 2.; 2024 International Mechanical Code (IMC), adopted by reference (§ 151.03), with Town of Cave Creek amendments, effective January 1, 2026. Source: Town of Cave Creek Ordinance No. 2025-08, Section 3.; 2025 International Plumbing Code (IPC), adopted by reference (§ 151.04), with Town of Cave Creek amendments, effective January 1, 2026 (the Town's Building & Fire Code Compliance summary page separately lists this as the '2024 International Plumbing Code' — the governing Ordinance No. 2025-08 text itself specifies the 2025 edition; treat the Ordinance as authoritative). Source: Town of Cave Creek Ordinance No. 2025-08, Section 4.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference (§ 151.05), with Town of Cave Creek amendments, effective January 1, 2026. Source: Town of Cave Creek Ordinance No. 2025-08, Section 5.; 2025 International Fire Code (IFC), adopted by reference (§ 151.06) as the Town's uniform fire code, with Town of Cave Creek amendments; administered by the Building and Fire Safety Department under the Chief Building and Fire Code Official. Appendix B (Fire Flow Requirements for Buildings) and Appendix D (Fire Apparatus Access Roads) are adopted, with Appendix D.102.1 amended to require an approved fire apparatus access road capable of supporting an imposed load of fire apparatus weighing up to 50,000 pounds. Annual fire and life safety inspections are required for all occupancies and buildings except one- and two-family dwellings. Source: Town of Cave Creek Ordinance No. 2025-08, Section 6.; Town of Cave Creek Sprinkler Code (§ 151.07), originally adopted from Chapter 9 of the 2003 International Fire Code in July 2004 and unchanged since; automatic fire sprinkler systems in new and existing buildings are governed by this Town-specific sprinkler code rather than the IFC's own Section 903 (which is deleted and replaced by reference to § 151.07). Source: Town of Cave Creek Ordinance No. 2025-08, Section 6(2)-(3) and Section 7.; 2024 International Fuel Gas Code (IFGC), adopted by reference (§ 151.08), with Town of Cave Creek amendments, effective January 1, 2026. Source: Town of Cave Creek Ordinance No. 2025-08, Section 8.; 2025 International Existing Building Code (IEBC), adopted by reference (§ 151.09), with Town of Cave Creek amendments, effective January 1, 2026. Source: Town of Cave Creek Ordinance No. 2025-08, Section 9.; 2024 International Energy Conservation Code (IECC), adopted by reference (§ 151.10), effective January 1, 2026, EXCEPT that Chapters R1 through R5 of the IECC's residential section are deleted in their entirety and replaced with Chapters R1 through R5 of the 2018 IECC — so residential energy compliance in Cave Creek runs on the 2018 IECC residential provisions even though the commercial IECC baseline is 2024. Source: Town of Cave Creek Ordinance No. 2025-08, Section 10.; 2024 International Pool and Spa Code (ISPSC), adopted by reference (§ 151.11 International Swimming Pool and Spa Code), effective January 1, 2026; all swimming pools, spas, and hot tubs must comply with this code, and pool/spa/hot-tub enclosures must comply with A.R.S. § 36-1681 (Arizona's pool barrier statute). Swimming pools and spas are issued under a separate permit from the building permit. Source: Town of Cave Creek Ordinance No. 2025-08, Section 11; Town of Cave Creek Residential Plan Review Check List (rev. 6/15/2026).; ICC A117.1-2017 (Standard for Accessible and Usable Buildings and Facilities), adopted as part of the Town's code suite alongside the 2024 IBC. Source: Town of Cave Creek Ordinance No. 2025-08 (preamble); Town of Cave Creek Commercial Plan Submittal Guidelines.; All prior versions of Chapter 151 (Building Code § 151.01, Residential Code § 151.02, Mechanical Code § 151.03, Plumbing Code § 151.04, Electrical Code § 151.05, Fire Code § 151.06, Fuel Gas Code § 151.08, Existing Building Code § 151.09, and Energy Conservation Code § 151.10) were repealed in their entirety and replaced by Ordinance No. 2025-08, effective January 1, 2026; all former conflicting ordinances were repealed as of that date. Source: Town of Cave Creek Ordinance No. 2025-08, Sections 1-2 (Repeal, Effective Date).. Local amendments apply — see the Cave Creek overview page for the full list.

The 2024 IRC and 2024 IBC (for non-residential portions), as adopted and amended by the Town of Cave Creek via Ordinance No. 2025-08, apply effective January 1, 2026 — except that residential energy compliance runs on the 2018 IRC Chapter 11 / 2018 IECC Chapters R1-R5, not the 2024 IECC used elsewhere in the code suite.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cave Creek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.