EV Charger / EVSE Permit — Cave Creek, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://www.cavecreekaz.gov/DocumentCenter/View/7107/Comprehensive-Fee-Schedule---as-of-2-5-2026-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Cave Creek, Arizona
Cave Creek has no standalone EV-charger/EVSE permit type or fee line item. Installing electric vehicle charging equipment (e.g., a dedicated 240V Level 2 circuit, panel/service upgrade, or one-line diagram/load-calculation update to support a charger) is electrical work, governed by the 2023 National Electrical Code (NEC/NFPA 70) as adopted by the Town (Town Code Section 151.05), and per this file's own electrical-permit entry, is priced through the same general valuation-based Building Permit Fee table applied to any electrical work -- the Town's Comprehensive Fee Schedule does not list a separate flat 'electrical permit' line item, and no EV-charger, EVSE, or electric-vehicle-specific fee or process was found on the Town's Building Fire Code Compliance page or Comprehensive Fee Schedule as of this review. Re-chased on 2026-07-20: fetched the Town's CURRENT Comprehensive Fee Schedule (as of February 5, 2026, adopted December 2, 2024) directly and confirmed the exact governing valuation-based Building Permit Fee table that applies -- $47.74 for a $1-$500 valuation, scaling upward per the published formula. This IS a real, exact, currently-in-force governing fee mechanism (the Town simply does not itemize a distinct EV-charger line the way it does for Photovoltaic (PV) Solar, which has its own $307.00 flat fee).
Verified 2026-07-20 · Source
When you need this permit
- EV charger circuit installation is electrical work; apply via the Town's SmartGov Community Platform online portal using the standard Building/Electrical Permit Application
- Governed by the 2023 NEC as adopted by the Town of Cave Creek
- One-line diagram, panel schedule, and electric load calculations required if the installation involves a new or upgraded electrical service
- Billed under the general valuation-based Building Permit Fee table applied to electrical work; no distinct EV-charger fee line item exists
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
New circuit wiring, box placement, and panel connections before walls are closed, if applicable
- 2
Final
Charger unit installed, panel labeled, protections (AFCI/GFCI) verified per 2023 NEC
See the full Cave Creek inspection guide — scheduling & re-inspection fees →
Tips
- There is no separate EV-charger fee category in Cave Creek -- an EV charger circuit is billed under the same general valuation-based Building Permit Fee table applied to any electrical work, starting at $47.74 for a $1-$500 valuation and scaling upward per the Town's published formula.
- If your installation requires a panel/service upgrade to support the charger, budget for the one-line diagram and load-calculation submittal requirements that apply to any new/upgraded electrical service in Cave Creek.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cave Creek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cave Creek
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →