Electric Vehicle (EV) Charger / EVSE Permit in Kayenta Township, Arizona
Kayenta Township has no dedicated standalone EV charger/EVSE permit type or fee category. Like solar/renewable-energy interconnection work, EV charger circuit installation is electrical work captured on the same Application for Trade Permit used for electrical, mechanical, and plumbing work — the Trade Permit's electrical section requires existing and new/upgraded service size (amps), which applies directly to an EV charger circuit whether or not the renewable-energy field is also used. It is billed under the Township's flat 1% Construction Permit Fee that applies to ALL construction projects Township-wide (Chapter 11, Section 11-5), the same fee explicitly confirmed to apply to solar/renewable-energy installations; no distinct EV-specific fee line exists.
Verified 2026-07-20 · Source
When you need this permit
- Complete the Application for Trade Permit, checking 'Electrical' and providing existing and new/upgraded service size (amps) for the EV charger circuit
- If the charger is served by a new or upgraded electrical service, provide details of whether the service is located on a utility easement or another's property, per the Trade Permit's electrical-work fields
- Construction Permit Fee of 1% of estimated project valuation is collected for the EV charger installation like any other Township construction project (Chapter 11, Section 11-5); legally the contractor's obligation, but the owner is responsible for collecting and remitting it if the contractor does not
- Construction must be performed by a contractor licensed and in good standing in Utah, Arizona, Colorado, or New Mexico (proof required with the application), unless the work qualifies for the owner/lessee self-use exemption under Chapter 11, Section 11-10 Contractor
- Service utilities for any commercial EV charging installation (e.g., a fleet or workplace charging depot) are approved under Navajo Tribal Utility Authority (NTUA) standards, per the Commercial Plan Review Requirements document
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Official / Permit Tech. review
The Building Official or an authorized Permit Tech. confers with the applicant on the scope of work (existing vs. new/upgraded service) to determine eligibility for expedited (over-the-counter) issuance versus requiring full plans.
- 2
Field inspection
Standard field inspection of the completed circuit and electrical interconnection (24 hours' notice required per the Building & Safety Department's general inspection procedures).
See the full Kayenta Township inspection guide — scheduling & re-inspection fees →
Tips
- There is no dedicated 'EV charger permit' form in Kayenta Township — EV charger circuit installations are captured on the same Trade Permit form used for electrical, mechanical, and plumbing work; select 'Electrical' and provide the service-size fields.
- The Township's flat 1% Construction Permit Fee (Chapter 11, Section 11-5) applies to EV charger installations the same as any other construction project — there is no reduced or waived rate.
- If the charger installation requires a new or upgraded electrical service, budget for the same documentation (easement/property-line details) required of any other new-service Trade Permit application.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kayenta Township building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Kayenta Township
Electric Vehicle (EV) Charger / EVSE Permit in other cities
Compare electric vehicle (ev) charger / evse permit fees across Arizona →
Look up this fee in a different city →