Fire Sprinkler and Fire Alarm System Permit in Commerce City, Colorado
Fire sprinkler, fire alarm, clean agent system, kitchen-hood suppression, paint/spray booth suppression, standpipe, and fire-pump plan review and permitting for Commerce City is conducted by South Adams County Fire Department (SACFD), an independent fire protection district headquartered within Commerce City itself (6050 Syracuse St.) -- NOT by the city's own Building Safety Division. SACFD's own Plan Review and Construction Permit Application includes a "Building Dept" checkbox for either "Adams County" or "City of Commerce City," confirming it serves both. A base building permit is still filed with the City of Commerce City via eTRAKiT (referencing SACFD's plan review), but fire sprinkler/alarm/suppression plans are submitted, reviewed, and inspected entirely separately by SACFD under its own Fire Prevention Bureau application, fee schedule, and (per this file's own existing localAmendments and residential-building-permit entry) portal. Per this file's already-documented local nuance, not every Commerce City parcel is served by SACFD -- some fall instead under Brighton Fire Rescue District depending on location, so applicants should confirm which district has jurisdiction before submitting.
Verified 2026-08-13 · Source
When you need this permit
- Fire sprinkler (new, modification, scope-of-work), fire alarm (new, modification, scope-of-work), fire pump, standpipe, clean agent system, commercial-kitchen hood suppression, and spray/paint booth suppression installations require a separate plan review and construction permit issued directly by South Adams County Fire Department's (SACFD) Fire Prevention Bureau (6050 Syracuse St., Commerce City, CO 80022; 303-288-0835; planreview@sacfd.org) -- not the Commerce City Building Safety Division
- Applicants submit SACFD's own Plan Review and Construction Permit Application (Revised 7/25), selecting the project type: New Building, Building Addition, Tenant Finish, Water Plan, Fire Alarm, Sprinkler, Clean Agent System, Kitchen Hood, Radio Amplification (BDA), High Pile Storage/Racking, Temporary Structure (Tent), Paint Booth, City Referral, County Referral, Operational Permit/Conditional Use, or Other; the form requires the Commerce City Building Department Permit # of the associated base building permit
- SACFD's own current Plan Review and Construction Permit Application (Revised 7/25) states: "All plan submittals will be a Minimum of a Thirty (30) business day review process." SACFD's separate live Plan Review webpage (sacfd.org/plan-review) instead states plan review "will be a minimum of sixty (60) business days after the plans meet our submittal requirements and the minimum fee is paid" -- a genuine, unreconciled discrepancy between two of the department's own current published sources as of this review
- All sprinkler submittals must include a General Information Sign to be accepted, per sacfd.org/plan-review
- The minimum plan review fee is due at time of submittal; SACFD accepts check or credit card, with a 3.5% credit card transaction fee applied to all fees (per the 2024 fee schedule, effective January 1, 2024; the July 2025-revised application form separately notes the 3.5% card fee starts February 1st)
- For permits submitted after April 16, 2026, SACFD uses its updated SizeUp FirstDue portal rather than its prior contractor Permit Portal, per sacfd.org/plan-review
- Performing sprinkler or alarm work without a permit or approval results in a fee of double the original permit fee
- SACFD's finaled fire sprinkler/alarm permit approval must be logged and closed out before Commerce City will finalize a building's Certificate of Occupancy -- consistent with this file's Commercial Building Permit and Commercial Tenant Improvement Permit entries, which already document that "South Adams County Fire Department...conduct their own inspections; all applicable agency finals must be approved before a CO"
- SACFD separately administers an annual/recurring Operational Permit program (launched January 1, 2024, confirmed to cover Commerce City) for high-pile storage/racking, spray/dipping operations, hazardous materials use/storage, hot work, mobile food preparation vehicles, fireworks, and marijuana establishments -- a distinct permit type from the one-time sprinkler/alarm construction permit documented here
- IMPORTANT: per this file's own residential-building-permit entry and localAmendments, not all Commerce City parcels are served by SACFD -- some require fire review through Brighton Fire Rescue District instead, depending on location; confirm the correct district before submitting a fire sprinkler/alarm plan review
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough and Hydrostatic Inspection (fire sprinkler)
Combined rough and hydro inspection before concealment, per SACFD's fee schedule descriptions
- 1
Rough Inspection (fire alarm)
Wiring and device placement before concealment
- 2
Final Inspection and Test
SACFD final sign-off and system test; required before Commerce City will finalize a Certificate of Occupancy for the building
See the full Commerce City inspection guide — scheduling & re-inspection fees →
Tips
- SACFD's own two current published sources disagree on the minimum plan review timeline -- 30 business days per the July 2025-revised application form versus 60 business days per the live sacfd.org/plan-review page. Call 303-288-0835 or email planreview@sacfd.org to confirm the currently operative figure before committing to a project schedule.
- The City of Commerce City building permit (via eTRAKiT) and the SACFD fire sprinkler/alarm permit are two entirely separate submittals, agencies, portals, and fee schedules -- budget time and fees for both, and reference your City Building Department Permit # on the SACFD application.
- Confirm whether your specific parcel is served by SACFD or by Brighton Fire Rescue District before submitting -- this file's own residential-building-permit entry already documents that Commerce City fire district coverage varies by location.
- SACFD doubles the permit fee for any sprinkler or alarm work performed without a permit -- budget the real cost of skipping this step, not just the risk of a stop-work order.
- A Residential Fire Sprinkler System (NFPA 13D / P2904, one- or two-family homes and manufactured homes) is a flat $350.00 regardless of square footage -- a materially simpler fee structure than the $0.05/sq ft new-installation rate used for other sprinkler systems.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Commerce City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Commerce City
Fire Sprinkler and Fire Alarm System Permit in other cities
Compare fire sprinkler and fire alarm system permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Commerce City project checklist
Describe your project once and get every permit, document, and fee it triggers in Commerce City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →