Commerce City building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Commerce City, Colorado.
Last verified 2026-07-13 · Source · Embed this page’s badge · Version history
Building department
- Address
- South Platte Crossing Building, 7190 Colorado Blvd. Ste 600 (6th Floor), Commerce City, CO 80022
- Phone
- 303-289-3790
- cdpermits@c3gov.com
- Office hours
- Monday - Friday, 8:00 a.m. - 5:00 p.m.
- Website
- Official site
- Permit portal
- Apply online at Commerce City's portal
Inspection guide
See how inspections work in Commerce City — sequence, scheduling & re-inspection fees.
Codes adopted
Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.
- City of Commerce City Building Code (C3BC), also known as the 2021 edition of the C3BC — incorporates by reference: 2021 International Building Code (IBC), 2021 International Existing Building Code (IEBC), 2021 International Residential Code (IRC), 2021 International Energy Conservation Code (IECC), 2021 International Fuel Gas Code (IFGC), 2021 International Mechanical Code (IMC), 2021 International Plumbing Code (IPC), 2021 International Swimming Pool and Spa Code (ISPSC), 2021 International Private Sewage Disposal Code (IPSDC), 2021 International Green Construction Code (IgCC), 2023 NFPA 70 National Electrical Code (NEC), 2021 International Fire Code, and 2021 International Property Maintenance Code. Source: Commerce City Municipal Code Chapter 5, Sec. 5-1 and 5-2, https://www.c3gov.com/Business-Development/Building-Permits-Inspections/Step-1-Project-Design/Building-Code-Provisions-in-the-Municipal-Code
- City of Commerce City Construction Code — the 2021 IBC as adopted, including Appendix Chapters C, E, F, G, H, I, J, K and N. Source: c3gov.com 2021 International Building Code page, https://www.c3gov.com/Business-Development/Building-Permits-Inspections/Step-1-Project-Design/2021-International-Building-Code
- City of Commerce City Residential Code — the 2021 IRC as adopted, including Appendix Chapters AH, AI, AJ, AK, AM, AQ, AR, AS, AT, AU and AW. Source: c3gov.com 2021 International Residential Code page, https://www.c3gov.com/Business-Development/Building-Permits-Inspections/Step-1-Project-Design/2021-International-Residential-Code
- City of Commerce City Commercial Energy Conservation Code and City of Commerce City Residential Energy Conservation Code — the 2021 IECC as locally amended (Sections C101.1/R101.1 renamed; C103/R103 construction-document amendments; C104/R104 fees deleted and replaced to reference Article VI, Chapter 5 fee schedule; C109/R109 stop-work order and C110/R110 board-of-appeals sections replaced to reference Commerce City Municipal Code Sec. 5-5007 and Sec. 5-21). For permit applications submitted prior to July 1, 2026, applicants may choose to comply with the 2018 IECC as amended by the city instead. Source: c3gov.com 2021 IECC page, https://www.c3gov.com/Business-Development/Building-Permits-Inspections/Step-1-Project-Design/2021-International-Energy-Conservation-Code
- 2023 NFPA 70 National Electrical Code (NEC), adopted by reference per Municipal Code Sec. 5-2. Source: Commerce City Municipal Code Chapter 5, Sec. 5-2
- Construction for which a permit application is submitted six months after the effective date of the 2021 C3BC must comply with the 2021 C3BC; applicants during that six-month transition window could choose either the 2021 C3BC or the prior edition; IBC-designed permit applicants were permitted one year after the effective date to comply. Source: Commerce City Municipal Code Chapter 5, Sec. 5-4
Permit types & fees
Residential Building Permit (New Construction / RNEW)
Required for new custom detached homes, duplexes, mobile homes, and detached houses/townhouses/duplexes built off a previously-approved master model within Commerce City. Reviewed against the 2021 IRC as adopted by the City of Commerce City Building Code (C3BC), plus Local Design Criteria. Issued by the Commerce City Building Safety Division.
Residential Addition / Alteration Permit (RADD / RALT)
Required for additions, garages, decks, patio covers, sunrooms, second-story additions (pop-tops), basement finishes, interior remodels, and similar work on existing houses in Commerce City. Reviewed against the 2021 IRC as adopted by the C3BC. Billed on the same valuation-based Table 1-A fee schedule as new construction.
Electrical Permit (RELEC / CELEC)
Required for new/replacement electrical service, wiring, solar electrical installations, EV charging circuits, and other electric-only work in Commerce City. Governed by the 2023 NEC as adopted by the C3BC. Residential Electrical (RELEC) and Commercial Electrical (CELEC) are the eTRAKiT permit types.
Plumbing/Gas Permit (RPLMB / CPLMB)
Required for new plumbing fixtures, water heaters, boilers, backflow preventers, sewer repairs over 10 feet, and other plumbing/gas-only work in Commerce City. Governed by the 2021 IPC as adopted by the C3BC.
Mechanical/Gas (HVAC) Permit (RMECH / CMECH)
Required for new/replacement HVAC equipment, gas appliances, furnaces, air conditioners, and ductwork in Commerce City. Governed by the 2021 IMC and 2021 IFGC as adopted by the C3BC.
Roofing Permit (Commercial / Multi-Family Reroofs Only)
IMPORTANT: Commerce City does NOT require a building permit for a residential reroof. A permit is required only for reroofs and roof-sheathing replacement in commercial and multi-family buildings, and for residential roof-sheathing replacement exceeding 256 sq ft. This is a notable local variance from most jurisdictions in this corpus.
Accessory Dwelling Unit (ADU) Permit
Required for construction of an Attached, Contained, or Detached ADU on a single-family dwelling lot in Commerce City. Zoning/Land Development Code requirements and building code requirements (based on the IRC) are both published directly by the city's Building Safety Division.
Demolition Permit (RDEMO / CDEMO)
Required for demolition of buildings/structures and building interiors in Commerce City. Residential Demolition (RDEMO) covers partial building demolitions, whole house demolitions, and interior element demolitions; Commercial Demolition (CDEMO) covers interior-only, whole-building, partial-building, or other commercial-related demolitions. Billed at a flat $75.00 fee rather than the general valuation-based schedule.
Fence and Retaining Wall Permit
Fencing standards are set by Article VII of the Land Development Code (adopted 2009). Fences under specific height thresholds are exempt from a building permit; taller fences and retaining walls over 4 feet require a permit. Commerce City publishes a detailed 'Fences Facts to Know' handout with a full height/setback/style table by land use.
Solar PV Permit
Required for installation of rooftop solar photovoltaic systems in Commerce City. A Building Permit and an Electrical Permit are required, billed on the City's standard valuation-based Building Permit Fee Schedule (Table 1-A) — but capped by Colorado's statutory Fair Permit Act limit on solar fees. Commerce City's Building Safety Division also requires a Solar Installation Certificate (a self-certification form, Version 2021.0) to be completed by a state-licensed journeyman or master electrician employed by a Commerce City-licensed electrical contractor and uploaded to the City's eTRAKiT portal after installation.
Electric Vehicle Charging Station Permit
Required for installation of Level 1, Level 2, or Level 3 (DC fast) electric vehicle charging stations in Commerce City. The City publishes a dedicated Electric Vehicle Charging Station Design Guide (Step 1: Project Design) distinguishing requirements by charger level. Permitted as a Residential Electrical (RELEC) or Commercial Electrical (CELEC) permit in eTRAKiT — Level 3 installations may also require a building permit depending on complexity (foundation/canopy work) — billed on the City's standard valuation-based Building Permit Fee Schedule (Table 1-A); no distinct flat EV-charger fee line is published separately from the general electrical permit fee.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- 64units
64 buildings · $22.1M valuation
- Trailing 12 months
- 982units
12 of 12 months reported · #6 in Colorado coverage by units
- Year to date (2026 YTD through 2026-05)
- 281units
279 buildings · $97.7M valuation
5 month(s) reported to Census
- Full year 2025
- 931units
509 buildings · $244.4M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity
Tips & gotchas
- AUTHORITY MODEL: Commerce City runs its own CITY building department -- the Building Safety Division within the Community Development Department -- confirmed via c3gov.com and the Colorado Division of Fire Prevention and Control's (DFPC) prequalified building department list (contact: Russell Wonders). It is NOT a county, regional, or shared authority. This differs from Colorado Springs (regional PPRBD) elsewhere in this corpus but matches the simpler single-city-department pattern seen in Pueblo/SoCoBD (which is itself a joint city/town authority, still distinct from Commerce City's pure single-city model).
- Adams County itself does not directly issue building permits within Commerce City -- Adams County's role is limited to being the county Commerce City sits within; other Adams County cities in this corpus (Thornton, Westminster) similarly run their own departments rather than routing through the county.
- CORRECTED 2026-07-13: Commerce City DOES publish a numeric building-permit plan-review SLA, in a 'Review Time Frames' PDF (120KB) linked from the Step 2 (Permit Application) page -- this was originally missed because the link sits below the fold on that page and wasn't checked. Per that PDF: Residential Reviews get a 14-day initial review and a 7-day follow-up review; Commercial Reviews get a 21-day initial review, a 14-day 1st follow-up review, and a 7-day return time for any 2nd+ follow-up review; Temporary Event and Use Permits (TEU's) follow the Residential 14/7 pattern; Resubmittals/revisions follow the same residential-or-commercial pattern as the original submission. These figures are Building Safety Division-wide (by residential vs. commercial category), not broken out per individual permit type/trade -- each permitTypes entry in this file now applies the relevant figure with that caveat noted. The land-use/zoning timeframes (Subdivision Plats 4-6/8-12 months; Development Plans/PUDs 4-6/6-12 months) remain a separate, upstream process from this building-permit plan-review SLA. Source: https://www.c3gov.com/files/assets/city/v/1/cd-community-development/documents/developing-in-commerce-city/time-frames.pdf
- NOTABLE LOCAL QUIRK: Commerce City does NOT require a building permit for a RESIDENTIAL reroof (only commercial/multi-family reroofs and residential roof-sheathing replacement over 256 sq ft trigger a permit) -- this is a genuine outlier compared to most Colorado jurisdictions in this corpus, which typically DO require residential reroof permits (flat-fee or valuation-based).
- Building Permit Fee Schedule (Table 1-A, Directory of City Fees Section 2, effective as of December 16, 2024) is valuation-based and appears to be used as the general mechanism across nearly all permit types -- new construction, additions/alterations, and most standalone trade permits (electrical, plumbing, mechanical) -- since no separate flat-fee trade schedules were found published, unlike some other jurisdictions in this corpus (e.g., Colorado Springs' Individual Residential Mechanical & Plumbing Permit Fees table). Demolition is the one confirmed flat-fee exception at $75.00.
- Plan Review Fee is a flat 65% of the Building Permit Fee (or $150 if identical plans are resubmitted) -- simpler than many jurisdictions' tiered plan-review percentages.
- Local Design Criteria (c3gov.com): 35 psf ground snow load; 115 mph Vult wind speed (Exposure not separately stated as a distinct field on the published page); Seismic Design Category B; 36-inch frost line depth; ice barrier underlayment required; severe weathering; slight-to-moderate termite risk; elevation 5,160 ft.
- Adams County FIPS code is 001 (matches Thornton and Westminster's existing jurisdiction files in this corpus). Commerce City's own place FIPS code is 16495 (state 08 + place 16495) -- a standard ANSI/Census geographic identifier, not a city-specific fact requiring department citation, but the census.note field flags that principal review should confirm whether Commerce City has its own separately-reporting BPS place row (we2605c.txt) given it runs its own building department.
- Contractor licensing: Commerce City issues its own contractor licenses (Class A Unlimited General $120, Class B Limited General $81, Class C Residential General $60, Class D Residential Remodeling $60, Sub-Contractor $57) via the Directory of City Fees Section 5. Contractors must apply for permits using the eTRAKiT account tied to their license number; a lapsed license delays permit issuance at the Pre-Issuance Review step.
- Multiple outside agencies review plans separately from the city itself, depending on project location and type: Adams County Health, South Adams County Fire Department, Brighton Fire Rescue District, and South Adams County Water and Sanitation District. These are NOT part of Commerce City government and require separate submittals -- budget extra time and fees for these.
- No dedicated Solar PV design guide/checklist page was found published on c3gov.com beyond the general Residential Electrical (RELEC) / Commercial Electrical (CELEC) permit-type descriptions and the POST-installation Residential Solar Installation Certification form -- the certification form is not itself a pre-application design guide, so this file's solar coverage is folded into the Electrical Permit entry rather than broken out as a separate unverified solar-pv-permit entry.
- No dedicated demolition-specific Facts to Know document or design guide was found published on c3gov.com (checked the Facts to Know Library page in full and the Design Guides & Submission Requirements index) -- the demolition-permit entry in this file is built entirely from the general 'When a Permit Is Required' page, C3BC Sec. 5-7, the RDEMO/CDEMO permit-type descriptions, and the Section 2 fee schedule's explicit $75.00 flat Demolition Fee line, all genuinely sourced from the city's own site.