Sign Permit — Commerce City, Colorado · Requirements sheet
Verified 2026-08-13 · Source: https://library.municode.com/co/commerce_city/codes/land_development_code?nodeId=ARTVIIISIRE
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Commerce City, Colorado
Required before any sign is erected, moved, re-erected, constructed, altered, or enlarged in Commerce City, except signs specifically exempted under Land Development Code (LDC) Article VIII, Section 21-8210. Governed by LDC Article VIII (Sign Regulations, Municipal Code Chapter 21), fully re-enacted by Ord. No. 2432 on December 19, 2022. Only freestanding MONUMENT signs are permitted citywide — freestanding pole signs are prohibited outright. Shopping centers and multi-tenant/multi-building commercial, industrial, or office developments must file a single Comprehensive Sign Program covering all signs on site rather than individual permits per sign. Commerce City's fee schedule does not itemize a dollar figure specifically labeled "sign permit" for a standalone permanent sign; the Directory of City Fees lists a $25.00 Zoning Construction Permit and a separate $25.00 Temporary Sign Permit line under Community Development General Service Fees.
Verified 2026-08-13 · Source
When you need this permit
- A sign permit is required to erect, move, re-erect, construct, alter, or enlarge any sign, except as exempted under Sec. 21-8210; a separate sign permit is required for each sign (Sec. 21-8200(1))
- "Alter" means changing a sign's size, shape, height, construction material, or adding lighting; copy changes alone do not require a new permit, and a sign removed for maintenance may be replaced on the same support without a new permit (Sec. 21-8200(1))
- No sign permit shall be issued for a permanent sign on private property without written consent of the property owner or the owner's authorized agent (Sec. 21-8400(3))
- Only freestanding MONUMENT signs are permitted; freestanding POLE signs are prohibited citywide (Sec. 21-8425(1)(a))
- Shopping centers and multi-use/multi-building commercial, industrial, or office developments (or redevelopments) must employ a single Comprehensive Sign Program covering all signs on site, addressing architectural/visual compatibility, unified informational/way-finding signage, illumination, materials, and placement (Sec. 21-8220)
- Other than signs on single-family residential property, only a contractor licensed with the City of Commerce City may obtain a sign permit or install a sign requiring one (Sec. 21-8200(9)) Contractor
- A building permit may additionally be required for signs incorporating structural elements or attached to a building; an electrical permit is required for illuminated signs or signs with electrical components (Sec. 21-8200(10))
- A sign permit expires, and a new permit is required, if construction is not completed within six months of issuance (Sec. 21-8200(5))
- Signs may only be placed in or over a public right-of-way with prior approval of the City Engineer via a separate revocable permit, in addition to the sign permit (Sec. 21-8200(8))
- Numerous sign types are exempt from a permit if they meet general and type-specific standards: yard signs, temporary window signs, fabric/banner signs, historical commemorative plaques, address/building-identification signs (max 2 per building), handheld signs up to 20 sq ft, incidental signs up to 3 sq ft, interior signs not visible from adjacent property, holiday displays, utility-location signs, vehicle signs meeting use limits, and nameplates up to 2 sq ft (Sec. 21-8210)
- Flags and flagpoles are largely exempt, but installing a flagpole itself requires a building permit; flagpole height/flag size are capped by building height (e.g., 20 ft pole / 3x5 ft flag for a 1-story building, up to 35 ft pole / 6x10 ft flag for 5+ stories); non-residential lots may have up to 3 flagpoles, residential lots up to 1 (Sec. 21-8210(2)(p))
- Temporary fabric/banner signs are limited to any number of consecutive days up to 30, not to exceed 60 total days per calendar year (90 days/year/tenant for commercial multi-tenant); inflatable signs are limited to 7 consecutive days, not to exceed 14 total days per calendar month (Secs. 21-8500, 21-8510, 21-8520)
- The City's eTRAKiT portal has been the mandatory application channel for permits and licenses citywide since May 8, 2023; sign permit applications are otherwise made in writing on forms furnished by the Director per Sec. 21-8200(2)
- All permitted commercial/industrial signs are subject to number, area, and height limits by property size (e.g., freestanding commercial/industrial signs on sites under 2 acres are capped more tightly than sites over 10 acres); properties of 10+ acres with monument signs over 8 ft must set back 175+ ft from residential district boundaries; solar-powered monument signs get a 20% sign-area bonus; properties fronting I-76 or I-270 get a 25% area/height bonus (Sec. 21-8425)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
City-Initiated Compliance Inspection
In addition to any required building permit inspection, the city may inspect sign construction and installation at any time, at its option, to confirm compliance with the LDC (Sec. 21-8200(11))
See the full Commerce City inspection guide — scheduling & re-inspection fees →
Tips
- Only freestanding MONUMENT signs are allowed in Commerce City -- freestanding POLE signs are prohibited outright, unlike some peer jurisdictions that permit both subject to height caps.
- If your project is a shopping center, multi-tenant building, or multi-building commercial/industrial/office development, don't apply for individual sign permits -- file a single Comprehensive Sign Program (LDC Sec. 21-8220) covering the whole site instead.
- Temporary fabric/banner signs cap out at 30 consecutive days and 60 total days per calendar year (90 for commercial multi-tenant); inflatable signs cap out at 7 consecutive days and 14 days per month -- plan seasonal/promotional signage around these limits.
- A sign permit voids itself if construction isn't finished within 6 months of issuance -- don't let a permitted sign project stall past that window.
- Installing a flagpole requires a building permit even though the flag itself is largely permit-exempt -- and residential lots are capped at 1 flagpole versus up to 3 for non-residential lots.
- The Directory of City Fees has no line item explicitly labeled "sign permit" for a standalone permanent sign -- the closest identified fee is the general $25.00 Zoning Construction Permit; confirm the exact fee with Community Development (303-227-8777) before assuming this applies to your specific sign.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Commerce City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Commerce City
Sign Permit in other cities
Compare sign permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Commerce City project checklist
Describe your project once and get every permit, document, and fee it triggers in Commerce City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →