Electric Vehicle (EV) Charger / EVSE Permit — Colorado Springs, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://www.pprbd.org/Information/FeeSchedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charger / EVSE Permit in Colorado Springs, Colorado
Colorado Springs has no dedicated EV charger/EVSE permit type published by the Pikes Peak Regional Building Department (PPRBD) -- confirmed against PPRBD's Fee Schedule, Download/Forms, and Code pages, none of which contain an EV/EVSE-specific application, checklist, or fee line distinct from the standard valuation-based Electrical Permit (Table B/B.1/C). A residential Level 2 EVSE circuit is billed as ordinary electrical work under the 2023 National Electrical Code (adopted via the 2023 PPRBC). Separately, Colorado's HB24-1173 (Electric Vehicle Charging System Permits, effective 2024) requires 'covered' municipalities (10,000+ population) and counties (20,000+ population) -- a threshold Colorado Springs and El Paso County both clearly exceed -- to have adopted, by December 31, 2025, either the Colorado Energy Office's EV Charging Model Land Use Code, their own objective standards/administrative review ordinance, or an opt-out resolution retaining their existing process for EV CHARGING SYSTEM (i.e., public/commercial charging infrastructure) land-use permitting specifically. Which of these three paths Colorado Springs or El Paso County actually took was NOT confirmed in this research pass -- flagged as a genuine gap rather than assumed, and in any case HB24-1173 targets land-use/siting review for charging systems, not the routine electrical permit fee mechanism that governs a standard home EVSE circuit install (which continues to run through PPRBD's ordinary process below).
Verified 2026-07-20 · Source
When you need this permit
- Electrical contractors must hold a current State of Colorado electrical license AND be registered with PPRBD to pull permits and perform work in the region
- Homeowners may pull their own electrical permit only for work on their primary owner-occupied residence Owner-builder
- EVSE circuit installation, alteration, or panel/service upgrade requires a standard PPRBD Electrical Permit
- No EV-charger-specific application, checklist, or fee line item was located in PPRBD's published materials
- Separately, public/commercial EV charging system installations may be subject to Colorado Springs' or El Paso County's land-use review process under HB24-1173 (Electric Vehicle Charging System Permits) -- confirm current compliance-path status (model code adoption, own ordinance, or opt-out) directly with City Planning before pursuing a commercial charging site
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover
- 2
Final
EVSE circuit and connection verified, panel labeled, system energized
See the full Colorado Springs inspection guide — scheduling & re-inspection fees →
Tips
- PPRBD does not publish a distinct EV/EVSE fee -- a standard home EVSE circuit is billed as ordinary electrical work under Table C ($50 minimum tier) or Table B.1 ($50/trade) if attached to a building permit.
- Colorado's HB24-1173 imposes a separate, distinct land-use permitting streamlining requirement on Colorado Springs and El Paso County (as covered jurisdictions above the 10,000/20,000 population thresholds) for EV CHARGING SYSTEM siting -- this is most relevant for public/commercial charging stations, not a routine residential Level 2 charger circuit, and this file could not confirm which of the three HB24-1173 compliance paths (model code, own ordinance, or opt-out) the City/County ultimately adopted by the December 31, 2025 deadline.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Colorado Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Colorado Springs
Electric Vehicle (EV) Charger / EVSE Permit in other cities
Compare electric vehicle (ev) charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Colorado Springs project checklist
Describe your project once and get every permit, document, and fee it triggers in Colorado Springs — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →