Change of Use / Change of Occupancy Permit in Wellington, Colorado
Wellington requires a building permit for any change in the occupancy of a building or structure, per the Town's own quoted IBC/IRC Section R105.1 language on its 'Do I Need a Permit?' guide, and the Town's Land Use Code separately confirms that 'change in occupancy of any building' and 'change of use' are both triggering events for Land Use Code applicability (LUC Sec. 15-1-40(a)(4)-(5)). Independently, and in addition to the Town's own process, the Wellington Fire Protection District (WFPD) requires its own separate Occupancy/Business Change Permit any time a business or occupancy changes, to allow WFPD to re-inspect the space for fire-code compliance. Unlike Site Plan Review, Conditional Use, or Variance, 'change of use' is not listed as its own distinct procedure in the Land Use Code's Article 2 procedures table (LUC Sec. 15-2-30) -- a change of use is instead processed through whichever specific Building Department or Land Use Code procedure the new use itself triggers (e.g., the general Building Permit for the occupancy-classification change itself, plus Site Plan Review, Conditional Use, or a rezone if the new use requires one under Article 4 Use Regulations).
Verified 2026-08-14 · Source
When you need this permit
- The Town's own 'Do I Need a Permit?' guide quotes IBC/IRC Section R105.1 verbatim: 'Any owner or owner's authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure... shall first make application to the Building Official and obtain the required permit' -- confirming a change of occupancy alone (with no physical construction) triggers the Town's general Building Permit requirement
- Land Use Code Sec. 15-1-40(a) states the Land Use Code applies to, among other things, '(4) Change in occupancy of any building; or (5) Change of use' -- meaning a change of use can also trigger Land Use Code development-application requirements (Site Plan Review, Conditional Use, etc.) depending on what the new use is and what zoning district it falls in, per Article 4 Use Regulations
- Separately and in addition to the Town's process, the Wellington Fire Protection District (WFPD) requires its own Occupancy/Business Change Permit application whenever a business's occupancy changes -- WFPD's own form states: 'This form is an application for an Occupancy Permit for the Wellington Fire Protection District (WFPD). Occupancy Permits enable WFPD to perform inspections that ensure the building and property complies with the adopted Fire Code'
- Neither a WFPD Occupancy Permit nor its associated address is transferrable -- if the permitted business relocates or adds another unit, a new WFPD Occupancy Permit application is required
- In some cases a Knox Box (rapid-entry key box) may be required as a condition of the WFPD Occupancy Permit, ordered directly through knoxbox.com under 'Wellington FPD'
- No standalone 'Change of Use Permit' application or fee line exists separately in either the Town's Community Core/Connect permit-naming categories or the Fee Schedule effective 2026-04-01 -- a change of use is processed through the applicable existing mechanism (general Building Permit for the occupancy-classification change itself, at minimum, plus WFPD's Occupancy/Business Change Permit, plus any triggered Land Use Code review)
- All contractors must hold a current Town of Wellington Contractor License if physical construction/alteration accompanies the change of use Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
WFPD Fire-Code Compliance Inspection
Performed by the Wellington Fire Protection District as part of Occupancy/Business Change Permit issuance, to confirm the building and property comply with the adopted Fire Code
- 2
Building Final Inspection (if construction accompanies the change of use)
Required only if physical construction or alteration is part of the project scope
See the full Wellington inspection guide — scheduling & re-inspection fees →
Tips
- A change of use in Wellington is NOT a single standalone permit -- expect to touch at least two distinct processes: the Town's general Building Permit (per the Town's own quoted IBC/IRC R105.1 language requiring a permit to 'change the occupancy of a building or structure') and WFPD's separate Occupancy/Business Change Permit for fire-code compliance.
- WFPD's Occupancy Permit and its associated address are not transferrable -- moving locations or adding a unit requires a brand-new WFPD Occupancy Permit application, not an amendment to the existing one.
- Depending on what the new use actually is, a change of use may also trigger a full Land Use Code development application (Site Plan Review, Conditional Use, or even a rezone) if the new use isn't permitted outright in the zoning district under Article 4 Use Regulations -- check the new use against the zoning district's permitted-use table before assuming only the Building Permit and WFPD Occupancy Permit apply.
- A Knox Box (rapid-entry key box) may be required as a condition of the WFPD Occupancy Permit for certain occupancies -- ordered directly through knoxbox.com.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-14.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wellington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Wellington
Change of Use / Change of Occupancy Permit in other cities
Compare change of use / change of occupancy permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Wellington project checklist
Describe your project once and get every permit, document, and fee it triggers in Wellington — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →