Plumbing Permit — Wellington, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.wellingtoncolorado.gov/555/Contractor-License
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Wellington, Colorado
Required for plumbing installation, alteration, or repair in Wellington. Governed by the 2024 IPC as locally adopted (effective January 1, 2026). Wellington does NOT run its own local plumbing contractor licensing program — it defers to Colorado State Plumbing Board (DORA) licensing, with SAFEbuilt performing contemporaneous state-license verification per HB19-1086.
Verified 2026-07-06 · Source
When you need this permit
- Governed by the 2024 IPC as adopted by the Town, effective January 1, 2026
- Contractors must hold a current Colorado State Plumbing Board (DORA) Master Plumber license — Wellington does not issue its own separate plumbing trade license; a Town of Wellington general Contractor License is still required in addition Contractor
- SAFEbuilt conducts contemporaneous state-license verification at permit issuance per HB19-1086, requiring photocopies of the Colorado driver's license, Colorado Master's license, and Colorado Contractor license Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
See the full Wellington inspection guide — scheduling & re-inspection fees →
Tips
- Wellington has no separate local plumbing trade license — your Colorado State Plumbing Board (DORA) Master license is the credential verified contemporaneously by SAFEbuilt at permit issuance, per HB19-1086.
- For new construction or additions, plumbing is reviewed as part of the combined project plan review, not a standalone plumbing-only submittal.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wellington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Wellington
Plumbing Permit in other cities
Compare plumbing permit fees across Colorado →
Look up this fee in a different city →