Residential Building Permit (New Construction) — Wellington, Colorado · Requirements sheet
Verified 2026-07-23 · Source: https://wellingtoncolorado.gov/554/Building
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction) in Wellington, Colorado
Required for new single-family homes, duplexes, and townhomes in the Town of Wellington. Reviewed by SAFEbuilt, the Town's contracted building-department partner, under the 2024 IRC/IBC as locally amended (Ordinance No. 15-2025), effective January 1, 2026, plus the 2025 Colorado Wildfire Resiliency Code and the Colorado Model Electric and Solar Ready Code.
Verified 2026-07-23 · Source
When you need this permit
- 'New Buildings' are explicitly listed as a permit-requiring project type on the Town's 'Do I Need a Permit?' guide
- Plans reviewed under the 2024 IRC/IBC as locally amended by Ordinance No. 15-2025 (effective 1/1/2026), the 2025 Colorado Wildfire Resiliency Code, and the Colorado Model Electric and Solar Ready Code
- Foundations must be designed and construction drawings stamped by a Colorado-registered design professional, based on an engineer's soils report — per the codified text of IRC Section R401.2 as amended by Ordinance No. 15-2025 § 2 (adopted November 12, 2025, effective January 1, 2026), published on Municode Library (library.municode.com/co/wellington, version 'JUL 10, 2026 (CURRENT)'). Verbatim amendment text: 'All for new Group R, one and two family dwellings, and townhomes shall be designed and the construction drawings stamped by a Colorado registered design professional. The foundation design must be based on an engineer's soils report. The drawings must be noted with the engineering firm's name, specific location for design and soils report number. A site certification prepared by State of Colorado registered design professional is required for setback verification on all new Group R Division 3 occupancies.' (Ord. No. 15-2025, § 2, 11-12-25, eff. 1-1-26)
- All contractors and subcontractors must hold a current Town of Wellington Contractor License in addition to any required Colorado state trade license Contractor
- Application, plan submittal, and payment are all conducted through the Community Core/Connect online portal — mailed paper applications are not accepted
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Town of Wellington Fee Schedule (current edition effective 2026-08-14), Building Permit Fees table — Electrical Fee row, which reads 'From State Electrical Fee Schedule' and sets no Town valuation… Show full citationHide
Town of Wellington Fee Schedule (current edition effective 2026-08-14), Building Permit Fees table — Electrical Fee row, which reads 'From State Electrical Fee Schedule' and sets no Town valuation tiers for electrical work. C.R.S. § 12-115-121(2)(a) limits what a town may charge for electrical inspections — a maximum of $120, adjusted annually for Denver-Aurora-Lakewood CPI since January 1, 2021, plus an optional tiered charge by size or valuation and a multiplier of eight percent — and forbids any other fee or charge related to electrical inspections or permits. Those are limits on a town's own charge, not the amount billed here.Review timeline
Inspection process
- 1
Foundation
Before concrete pour
- 2
Framing
Structural framing complete before cover
- 3
Insulation
Wall, ceiling, floor insulation and exterior windows installed, before wall coverings
- 4
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 5
Final Inspection
All work complete per approved plans and applicable codes
See the full Wellington inspection guide — scheduling & re-inspection fees →
Tips
- SAFEbuilt (not Town staff directly) performs plan review and inspections for Wellington — direct SAFEbuilt correspondence (resubmittals, inspection scheduling) to their published channels (safebuiltcoloradoplanreview@safebuilt.com for plans; 970-674-1036 or 866-671-1036 for inspections), not the Town's general line.
- The Town publishes an actual plan-review turnaround commitment — 5 business days for first comments on residential and 10 for commercial — which is unusual for a Colorado home-rule jurisdiction, most of which publish no figure at all. You can plan against it, but confirm it still stands when you apply.
- Electrical fees are NOT set by the Town's own valuation table — they follow the Colorado state-mandated electrical fee schedule under CRS 12-115-121. The Town publishes no surcharge on that schedule.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wellington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Wellington's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Wellington yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Wellington lands. Privacy.
Other permits in Wellington
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Wellington project checklist
Describe your project once and get every permit, document, and fee it triggers in Wellington — in one checklist. Free, for any city and any number of projects.