Residential Building Permit (New Construction) in Wellington, Colorado
Required for new single-family homes, duplexes, and townhomes in the Town of Wellington. Reviewed by SAFEbuilt, the Town's contracted building-department partner, under the 2024 IRC/IBC as locally amended (Ordinance No. 15-2025), effective January 1, 2026, plus the 2025 Colorado Wildfire Resiliency Code and the Colorado Model Electric and Solar Ready Code.
Verified 2026-07-23 · Source
When you need this permit
- 'New Buildings' are explicitly listed as a permit-requiring project type on the Town's 'Do I Need a Permit?' guide
- Plans reviewed under the 2024 IRC/IBC as locally amended by Ordinance No. 15-2025 (effective 1/1/2026), the 2025 Colorado Wildfire Resiliency Code, and the Colorado Model Electric and Solar Ready Code
- Foundations must be designed and construction drawings stamped by a Colorado-registered design professional, based on an engineer's soils report — CONFIRMED 2026-07-23 directly against the live codified text of IRC Section R401.2 as amended by Ordinance No. 15-2025 § 2 (adopted November 12, 2025, effective January 1, 2026), retrieved via the Browser pane against Municode Library (library.municode.com/co/wellington, version 'JUL 10, 2026 (CURRENT)'), which now renders full readable text (the prior 'un-fetchable JS SPA' limitation applied only to bare curl/automated fetch, not to a live browser session). Verbatim amendment text: 'All for new Group R, one and two family dwellings, and townhomes shall be designed and the construction drawings stamped by a Colorado registered design professional. The foundation design must be based on an engineer's soils report. The drawings must be noted with the engineering firm's name, specific location for design and soils report number. A site certification prepared by State of Colorado registered design professional is required for setback verification on all new Group R Division 3 occupancies.' (Ord. No. 15-2025, § 2, 11-12-25, eff. 1-1-26)
- All contractors and subcontractors must hold a current Town of Wellington Contractor License in addition to any required Colorado state trade license Contractor
- Application, plan submittal, and payment are all conducted through the Community Core/Connect online portal — mailed paper applications are not accepted
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation
Before concrete pour
- 2
Framing
Structural framing complete before cover
- 3
Insulation
Wall, ceiling, floor insulation and exterior windows installed, before wall coverings
- 4
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 5
Final Inspection
All work complete per approved plans and applicable codes
See the full Wellington inspection guide — scheduling & re-inspection fees →
Tips
- SAFEbuilt (not Town staff directly) performs plan review and inspections for Wellington — direct SAFEbuilt correspondence (resubmittals, inspection scheduling) to their published channels (safebuiltcoloradoplanreview@safebuilt.com for plans; 970-674-1036 or 866-671-1036 for inspections), not the Town's general line.
- The Town publishes an actual plan-review turnaround commitment (5 business days for first comments on residential, 10 for commercial) — unusual among Colorado home-rule jurisdictions in this corpus, most of which publish no SLA at all.
- Electrical fees are NOT set by the Town's own valuation table — they follow the Colorado state-mandated electrical fee schedule under CRS 12-23-117, which the Town may surcharge up to 15% above the state base rate.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wellington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Wellington
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Wellington project checklist
Describe your project once and get every permit, document, and fee it triggers in Wellington — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →