Skip to main content
PermitBase

Roofing Permit (Re-Roof) in Wellington, Colorado

Required for residential re-roofing in Wellington. Processed under the Town's 'One Stop Permits — No Plan Review' track at a flat $75 fee. Commercial re-roofing (painting a metal roof excepted) also requires a permit.

Verified 2026-07-06 · Source

When you need this permit

  • Residential Re-roof is a 'One Stop Permit' (no plan review) at a flat $75 fee
  • Commercial re-roofing requires a permit; painting a metal roof specifically does NOT require a permit, per the Town's 'Do I Need a Permit?' guide
  • SAFEbuilt Building Guide Re-Roof packet and the Wellington Project Checklist Roof Replacement document define minimum submittal/material requirements
  • All contractors must hold a current Town of Wellington Contractor License Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Roof/Re-roofFee Schedule effective 2026-04-01
$75 flat
Permit Issuance
$25 flat

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit (Re-Roof) permit actually take in Wellington?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (roof)

    Completed roof — material and flashing/valley compliance verified; ladders must be supplied by the homeowner/contractor for the inspection

See the full Wellington inspection guide — scheduling & re-inspection fees →

Tips

  • A residential re-roof in Wellington is a flat $75 One Stop Permit — no plan review required, but you must still supply and set a ladder for the SAFEbuilt inspector's final roof inspection.
  • Painting a metal roof specifically does not require a permit in Wellington, per the Town's own 'Do I Need a Permit?' guide — but replacement/installation of roofing material does.

Frequently asked questions

No. The Town's 'Do I Need a Permit?' guide explicitly excepts painting a metal roof from permit requirements, while still requiring a permit for roof installation/replacement.

In Wellington, the published Roof/Re-roof is: $75 flat. Additional published fees: Permit Issuance — $25 flat. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Wellington does not publish a plan-review timeline for this permit. Contact Town of Wellington Planning and Building Department at 970-821-5078 (Building Department direct); 970-568-3381 (Town main line, ext. 115 for building permit verification) for current turnaround.

You'll need: Permit Application — Residential Roof (Asphalt or Other); Wellington Project Checklist — Roof Replacement. See the required-documents checklist on this page for details on each.

Wellington requires 1 inspection(s) for a roofing permit (re-roof), in order: Final Inspection (roof). Schedule each through Town of Wellington Planning and Building Department (970-821-5078 (Building Department direct); 970-568-3381 (Town main line, ext. 115 for building permit verification)).

Apply through Town of Wellington Planning and Building Department at 8225 Third Street, P.O. Box 127, Wellington, CO 80549. Phone: 970-821-5078 (Building Department direct); 970-568-3381 (Town main line, ext. 115 for building permit verification), email: Building@wellingtoncolorado.gov. Office hours: Monday-Friday, 8:00 a.m. to 5:00 p.m., Municipal Services Building, 8225 Third Street (across from Centennial Park). Plan review and inspections are conducted by SAFEbuilt, the Town's contracted building-department partner, not Town staff directly; inspection scheduling calls to SAFEbuilt (970-674-1036 or 866-671-1036) must be placed before 4 p.m. for next-business-day scheduling.. Official information: https://wellingtoncolorado.gov/554/Building.

Wellington, Colorado has adopted: 2024 International Building Code (IBC) — effective January 1, 2026; 2024 International Residential Code (IRC) — effective January 1, 2026; 2024 International Energy Conservation Code (IECC) — effective January 1, 2026; 2024 International Mechanical Code (IMC) — effective January 1, 2026; 2024 International Plumbing Code (IPC) — effective January 1, 2026; 2024 International Fire Code (IFC) — effective January 1, 2026; 2024 International Property Maintenance Code (IPMC) — effective January 1, 2026; 2024 International Existing Building Code (IEBC) — effective January 1, 2026; 2024 International Swimming Pool and Spa Code (ISPSC) — effective January 1, 2026; 2026 National Electrical Code (NFPA 70-NEC) — effective January 1, 2026 (per the Town's Building Department page; note this is one code cycle ahead of the 2023 NEC used by most other 2026-era Colorado jurisdictions in this corpus — verified directly against the Town's own 'Building Code Update' announcement, not assumed); 2025 Colorado Wildfire Resiliency Code, Version 1.0 — adopted alongside the 2024 I-Codes; Colorado Model Electric and Solar Ready Code — adopted alongside the 2024 I-Codes, addressing HB22-1362's statewide energy/electric-readiness floor; Local Amendments — Ordinance No. 15-2025 (adopted on first reading October 14, 2025 and second reading/adoption November 12, 2025; effective January 1, 2026) replace the Town's prior 2018 I-Code local amendments (originally under Ordinance No. 5-2019) and Ordinance No. 8-2019 (2019 building fee schedule) as the current governing local amendment package. Ordinance No. 15-2025 is codified on Municode (a JavaScript single-page application at library.municode.com/co/wellington); bare curl/automated fetch still returns HTTP 200 with no static text, but CORRECTED 2026-07-23: the full codified text IS retrievable via a live browser session (Municode renders client-side JS content that a headless curl fetch cannot execute) — confirmed directly against Chapter 18, Articles 1-4 (IBC/IRC/IPC/IMC amendments), version 'JUL 10, 2026 (CURRENT)', which quotes Ordinance No. 15-2025's full section-by-section amendment text verbatim, including the IRC R401.2 foundation/soils-report amendment. The Town's own Building Department webpage 'Building Departments News & Update' section (dated 11.25.2025) remains a valid corroborating first-party source for the adoption dates.; Previous code cycle (through December 31, 2025, now superseded): 2018 International Code editions (IBC, IRC, IECC, IMC, IPC, IFGC, IPMC, IEBC, IFC) under Ordinance No. 5-2019, and 2023 NEC. The Town's own Contractors/Homeowners webpages still host several 2018-cycle 'SAFEbuilt Building Guide' packets (Re-Roof 2018, Accessory Structure 2018, Deck/Porches 2018, Patio Covers 2018, Pole Barn 2018, Swimming Pools 2018, PV System 2019) that have not yet been refreshed to reference the 2024 I-Codes as of this review — treated as legacy/stale content rather than the governing code list, consistent with the Town's own live 'Current (Effective January 1, 2026)' code list.. Local amendments apply — see the Wellington overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wellington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.