Electrical Permit in Eaton, Colorado

Required for new electrical service, panel work, or living-space electrical wiring in Eaton. Governed by the 2023 NEC as adopted by Ordinance No. 664. Fees are structured differently for new residential living space (area-based) versus all other electrical work (valuation-based).

Verified 2026-07-06 · Source

When you need this permit

  • Electrical Permit application (via the Residential Building Permit / Commercial Permit / Counter Building Permit forms, which each include an Electrical Contractor section) submitted through CommunityCore
  • Licensed electrical contractor information, or the Town's contractor registration for homeowner-performed work Contractor
  • Electrical plan review required for all electrical permits (residential and non-residential)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential Creating New Living Space — 0 to 1,000 SFTown of Eaton Fee Schedule, Electrical Permit Fees, p.2
$200.00
Residential Creating New Living Space — 1,001 to 1,500 SF
$250.00
Residential Creating New Living Space — 1,501 to 2,000 SF
$300.00
Residential Creating New Living Space — over 2,000 SF
$300.00 plus $15.00 for each additional 100 SF
All Other Electrical Work (by valuation) — $1.00 to $2,000.00
$100.00
All Other Electrical Work (by valuation) — over $2,000.00
$200.00 plus $10.00 for each additional $1,000.00 of value
Temporary Construction Meter
$85.00
Permanent Meter Inspection
$85.00
Electrical Plan Review (Residential and Non-Residential)
65% of Electrical Permit Fee
Electrical Re-Inspection Fee
$85.00

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Eaton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Rough

    Wiring and panel installed before concealment

  2. 2

    Electrical Final

    Devices installed, system energized

See the full Eaton inspection guide — scheduling & re-inspection fees →

Tips

  • Eaton's residential electrical fee is area-based only for permits that CREATE NEW LIVING SPACE ($200-$300+ by square-footage tier); all other electrical work (service upgrades, panel swaps, non-living spaces) is billed on the separate valuation-based table ($100 minimum, scaling by $10 per $1,000 over $2,000) — confirm which table applies to your specific scope.
  • Electrical Plan Review is a separate 65%-of-permit-fee line item added on top of the base electrical permit fee for both residential and non-residential work.

Frequently asked questions

Eaton requires an electrical permit for: Electrical Permit application (via the Residential Building Permit / Commercial Permit / Counter Building Permit forms, which each include an Electrical Contractor section) submitted through CommunityCore; Licensed electrical contractor information, or the Town's contractor registration for homeowner-performed work; Electrical plan review required for all electrical permits (residential and non-residential). If your project isn't listed, confirm with Town of Eaton Building Department (permits issued by the Town Clerk's Office; inspections and plan review contracted to SAFEbuilt) at 970-305-3161 (SAFEbuilt, Contract Building Inspector); (970) 454-3338 (Town Clerk's Office / main line); fax (970) 454-3339 before starting work.

The Town's Fee Schedule sets a $200.00 flat fee for residential electrical permits creating 0 to 1,000 square feet of new living space, plus a 65% plan review fee on top of that base amount.

Eaton does not publish a plan-review timeline for this permit. Contact Town of Eaton Building Department (permits issued by the Town Clerk's Office; inspections and plan review contracted to SAFEbuilt) at 970-305-3161 (SAFEbuilt, Contract Building Inspector); (970) 454-3338 (Town Clerk's Office / main line); fax (970) 454-3339 for current turnaround.

You'll need: Electrical Permit Application (CommunityCore). Depending on your project, Eaton may also ask for: Electrical Diagram/Panel Schedule. See the required-documents checklist on this page for details on each.

Eaton requires 2 inspection(s) for an electrical permit, in order: Electrical Rough, Electrical Final. Schedule each through Town of Eaton Building Department (permits issued by the Town Clerk's Office; inspections and plan review contracted to SAFEbuilt) (970-305-3161 (SAFEbuilt, Contract Building Inspector); (970) 454-3338 (Town Clerk's Office / main line); fax (970) 454-3339).

Apply through Town of Eaton Building Department (permits issued by the Town Clerk's Office; inspections and plan review contracted to SAFEbuilt) at Town of Eaton, 223 1st St, Eaton, CO 80615. Phone: 970-305-3161 (SAFEbuilt, Contract Building Inspector); (970) 454-3338 (Town Clerk's Office / main line); fax (970) 454-3339, email: coemail@safebuilt.com (SAFEbuilt inspections/permit processing). Office hours: Not separately published on the Building and Permitting page as of this review; the Town's main contact line is (970) 454-3338.. Official information: https://www.eatonco.org/building-and-permitting.

Eaton, Colorado has adopted: 2024 International Building Code (IBC), Chapters 1-33 and Appendix Chapters H and I — adopted by Ordinance No. 664, amending Eaton Municipal Code Sec. 6-1-1, passed on second/final reading November 20, 2025; 2024 International Residential Code (IRC), Chapters 1-43 and Appendix AB — Ordinance No. 664, Sec. 6-1-2; 2024 International Mechanical Code (IMC); 2024 International Fuel Gas Code (IFGC); 2024 International Plumbing Code (IPC); 2024 International Energy Conservation Code (IECC); 2024 International Property Maintenance Code (IPMC); 2024 International Existing Building Code (IEBC); 2023 National Electrical Code (NEC); 2024 International Swimming Pool and Spa Code (ISPSC); Colorado Model Electric and Solar Ready Code, 2023 Edition — Ordinance No. 664, re-numbered as Eaton Municipal Code Sec. 6-1-12; Colorado Wildfire Resiliency Code, 2025 Edition — Ordinance No. 664, re-numbered as Eaton Municipal Code Sec. 6-1-13; All codes adopted pursuant to Title 31, Article 16, Part 2, C.R.S. Ordinance No. 664 was introduced/approved on first reading October 16, 2025, and passed as amended on final reading November 20, 2025; the Town's own Building and Permitting page states these codes 'will go into effect January 1, 2026,' a later effective date than the ordinance's own standard 30-day-after-publication clause (Section 17) — both dates are disclosed since the Town does not itself reconcile them on a single page. This corpus treats January 1, 2026 (the Town's own explicit statement on its current Building and Permitting page) as the operative date for practical purposes.; NOTE (data-integrity flag): A ProCode Inc.-branded 'Solar Permit Submissions and FAQs' handout linked from the Town's own Building and Permitting page (V4.5.22, dated April 2022, still bearing a Johnstown, CO return address) cites a stale 'Adopted Codes' list (2018 IFC, 2020 NEC, 2018 IBC, 2018 IRC) that predates both the Town's 2024 I-Code adoption (Ordinance No. 664) and the ProCode-to-SAFEbuilt rebrand. This corpus does NOT treat that stale document as a governing code citation; the current codes above (per the Building and Permitting page and Ordinance No. 664 itself) govern. The same handout's technical figures for wind speed (115 mph) and ground snow load (30 psf) are corroborated independently by Ordinance No. 664's own Table R301.2(1) and are treated as current on that independent basis, not on the stale handout's authority.. Local amendments apply — see the Eaton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eaton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.