Roofing Permit (Re-Roof) in Eaton, Colorado

Required for re-roofing work in Eaton, governed by Chapter 9 (Sec. R901-R908) of the 2024 IRC as adopted, plus the Town's own dedicated Roofing Regulations handout and a locally amended Class-4 impact-resistant shingle requirement.

Verified 2026-07-06 · Source

When you need this permit

  • Building Permit shall be posted on the house prior to starting work
  • Roofing Contractor must carry $100,000 combined single limit liability insurance; certificate of insurance (with limits, policy number, insurer name, effective/expiration dates) submitted at time of application, with an endorsement requiring 10-day advance written notice to the Town before cancellation
  • Re-roofing performed per Chapter 9 of the 2024 IRC: ice barrier required from the lowest roof edges to at least 24 inches inside the exterior wall line; all existing roofing materials must be torn off down to the deck (one-layer overlay rarely permitted); materials must meet 2024 IRC fire classification and wind-resistance standards; drip edge required at eaves and gables
  • Asphalt shingles must be Class 4 impact resistant, tested to UL2218, installed per manufacturer instructions — a local amendment to IRC R905.2.4
  • Replace damaged roof vents, b-vents, and roof jacks; add roof vents as needed to comply with 2024 IRC Sec. 806 (Roof Ventilation)
  • Secured ladder required on-site for all inspections (Code Reference R109.3)
  • Repair or replacement of less than 1 square (100 sq ft) of shingles does NOT require a building permit, per both the Roofing Regulations handout and Ordinance No. 664's IRC Sec. 105.2/R105.2 exemption amendment

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Re-Roof (Over-the-Counter One-Stop)Town of Eaton Fee Schedule, Over the Counter One-Stop Fees, p.2
$125.00

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit (Re-Roof) permit actually take in Eaton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Mid-Roof Inspection

    Required for tile roofs and commercial flat roofs only

  2. 2

    Final Inspection

    Verifies completed roof is up to code and all debris removed; a secured ladder must be provided for the inspector; Remote Video Inspection (RVI) option available

See the full Eaton inspection guide — scheduling & re-inspection fees →

Tips

  • Eaton's Roofing Regulations handout requires Class 4 impact-resistant asphalt shingles (UL2218-tested) as a local amendment to IRC R905.2.4 — this is a stricter-than-baseline-IRC requirement, confirm your shingle product meets this standard before purchasing materials.
  • Schedule inspections at least 24 hours in advance by calling 970-305-3161 ext. 1 (SAFEbuilt); clean up all debris and clear gutters before calling for final inspection.
  • Re-roofs replacing less than 1 square (100 sq ft) of shingles do not require a permit at all — confirm your project's exact scope before assuming a permit is needed.

Frequently asked questions

Yes, if replacing 1 square (100 sq ft) or more of roof covering. The Town's Fee Schedule sets a flat $125.00 fee, and the Town's own Roofing Regulations require Class 4 impact-resistant shingles (a local amendment to the 2024 IRC) and a full tear-off to the deck.

In Eaton, the published Re-Roof (Over-the-Counter One-Stop) is: $125.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Eaton does not publish a plan-review timeline for this permit. Contact Town of Eaton Building Department (permits issued by the Town Clerk's Office; inspections and plan review contracted to SAFEbuilt) at 970-305-3161 (SAFEbuilt, Contract Building Inspector); (970) 454-3338 (Town Clerk's Office / main line); fax (970) 454-3339 for current turnaround.

You'll need: Counter Building Permit Application (Over-the-Counter); Certificate of Insurance. See the required-documents checklist on this page for details on each.

Eaton requires 2 inspection(s) for a roofing permit (re-roof), in order: Mid-Roof Inspection, Final Inspection. Schedule each through Town of Eaton Building Department (permits issued by the Town Clerk's Office; inspections and plan review contracted to SAFEbuilt) (970-305-3161 (SAFEbuilt, Contract Building Inspector); (970) 454-3338 (Town Clerk's Office / main line); fax (970) 454-3339).

Apply through Town of Eaton Building Department (permits issued by the Town Clerk's Office; inspections and plan review contracted to SAFEbuilt) at Town of Eaton, 223 1st St, Eaton, CO 80615. Phone: 970-305-3161 (SAFEbuilt, Contract Building Inspector); (970) 454-3338 (Town Clerk's Office / main line); fax (970) 454-3339, email: coemail@safebuilt.com (SAFEbuilt inspections/permit processing). Office hours: Not separately published on the Building and Permitting page as of this review; the Town's main contact line is (970) 454-3338.. Official information: https://www.eatonco.org/building-and-permitting.

Eaton, Colorado has adopted: 2024 International Building Code (IBC), Chapters 1-33 and Appendix Chapters H and I — adopted by Ordinance No. 664, amending Eaton Municipal Code Sec. 6-1-1, passed on second/final reading November 20, 2025; 2024 International Residential Code (IRC), Chapters 1-43 and Appendix AB — Ordinance No. 664, Sec. 6-1-2; 2024 International Mechanical Code (IMC); 2024 International Fuel Gas Code (IFGC); 2024 International Plumbing Code (IPC); 2024 International Energy Conservation Code (IECC); 2024 International Property Maintenance Code (IPMC); 2024 International Existing Building Code (IEBC); 2023 National Electrical Code (NEC); 2024 International Swimming Pool and Spa Code (ISPSC); Colorado Model Electric and Solar Ready Code, 2023 Edition — Ordinance No. 664, re-numbered as Eaton Municipal Code Sec. 6-1-12; Colorado Wildfire Resiliency Code, 2025 Edition — Ordinance No. 664, re-numbered as Eaton Municipal Code Sec. 6-1-13; All codes adopted pursuant to Title 31, Article 16, Part 2, C.R.S. Ordinance No. 664 was introduced/approved on first reading October 16, 2025, and passed as amended on final reading November 20, 2025; the Town's own Building and Permitting page states these codes 'will go into effect January 1, 2026,' a later effective date than the ordinance's own standard 30-day-after-publication clause (Section 17) — both dates are disclosed since the Town does not itself reconcile them on a single page. This corpus treats January 1, 2026 (the Town's own explicit statement on its current Building and Permitting page) as the operative date for practical purposes.; NOTE (data-integrity flag): A ProCode Inc.-branded 'Solar Permit Submissions and FAQs' handout linked from the Town's own Building and Permitting page (V4.5.22, dated April 2022, still bearing a Johnstown, CO return address) cites a stale 'Adopted Codes' list (2018 IFC, 2020 NEC, 2018 IBC, 2018 IRC) that predates both the Town's 2024 I-Code adoption (Ordinance No. 664) and the ProCode-to-SAFEbuilt rebrand. This corpus does NOT treat that stale document as a governing code citation; the current codes above (per the Building and Permitting page and Ordinance No. 664 itself) govern. The same handout's technical figures for wind speed (115 mph) and ground snow load (30 psf) are corroborated independently by Ordinance No. 664's own Table R301.2(1) and are treated as current on that independent basis, not on the stale handout's authority.. Local amendments apply — see the Eaton overview page for the full list.

Per the Town's Roofing Regulations and Ordinance No. 664's design criteria table: 115 mph wind speed and 30 psf ground snow load.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eaton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.