EV Charger / EVSE Permit (Billed as General Electrical Work) — Eaton, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://www.eatonco.org/media/7796
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit (Billed as General Electrical Work) in Eaton, Colorado
Required for installation of a Level 2 (or higher) electric vehicle charger/EVSE in Eaton. The Town has no dedicated EV-charger fee line item, application form, or ordinance distinct from the Colorado HB24-1173 EV-charger-permitting statute's requirements — Eaton's own population (approx. 6,000 per Census QuickFacts) is below the 10,000-population threshold that makes a municipality a 'covered municipality' under HB24-1173 (Electric Vehicle Charging System Permits Act, effective Aug. 7, 2024), so the Town is not required to adopt the Colorado Energy Office's model EV-charger permitting code or a dedicated objective-standards ordinance. An EV charger circuit is billed under the Town's general 'All Other Electrical Work (by valuation)' fee tier on the same Fee Schedule used for other electrical work not tied to new living space, and reviewed under the 2023 NEC Article 625 (Electric Vehicle Power Transfer System) as adopted by Ordinance No. 664.
Verified 2026-07-20 · Source
When you need this permit
- Electrical Permit application (via the Residential Building Permit / Commercial Permit / Counter Building Permit forms, which each include an Electrical Contractor section) submitted through CommunityCore
- Licensed electrical contractor information, or the Town's contractor registration for homeowner-performed work Contractor
- Electrical plan review required for all electrical permits (residential and non-residential)
- No dedicated EV-charger checklist, model-code adoption, or 3-business-day HB24-1173 notification commitment was found published by the Town — Eaton is below the 10,000-population 'covered municipality' threshold that triggers HB24-1173's requirements
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Rough
Charger circuit wiring and breaker sizing before concealment
- 2
Electrical Final
EVSE installed, GFCI/disconnect verified, system energized
See the full Eaton inspection guide — scheduling & re-inspection fees →
Tips
- Eaton has no EV-charger-specific permit, form, or fee line — a home EV charger/EVSE is billed under the general valuation-based 'All Other Electrical Work' tier ($100 minimum for work valued $1-$2,000; $200 plus $10 per additional $1,000 above that), the same table used for panel upgrades and other non-living-space electrical work.
- Colorado's HB24-1173 (EV Charging System Permits Act) requires 'covered municipalities' (population 10,000+) to adopt streamlined EV-charger permitting standards by Dec. 31, 2025 — Eaton, at roughly 6,000 residents, falls below that threshold and is not bound by the Act's model-code-or-ordinance mandate or its 3-business-day decision-notification clock.
- Electrical Plan Review is a separate 65%-of-permit-fee line item added on top of the base electrical permit fee, applicable to EV charger circuits as to any other electrical work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eaton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Eaton
EV Charger / EVSE Permit (Billed as General Electrical Work) in other cities
Compare ev charger / evse permit (billed as general electrical work) fees across Colorado →
Look up this fee in a different city →