Mechanical / HVAC Permit (Furnace, Air Conditioning, Gas Line, Gas Fireplace) — Eaton, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.eatonco.org/media/7796
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Mechanical / HVAC Permit (Furnace, Air Conditioning, Gas Line, Gas Fireplace) in Eaton, Colorado
Required for furnace replacement, air conditioning installation, gas line, and gas fireplace work in Eaton. Governed by the 2024 IMC/IFGC as adopted by Ordinance No. 664. Billed via the Town's flat 'Over the Counter One-Stop' fee schedule.
Verified 2026-07-06 · Source
When you need this permit
- Counter Building Permit (Over-the-Counter application) covers Furnace/AC, Gas Fireplace, and Gas Line work, with fields for BTU rating and AC tonnage
- Licensed mechanical contractor information, or Town contractor registration for homeowner-performed work Contractor
- Gas Meter/Gas Test permit required for new gas line work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Mechanical Rough (incl. Gas Test where applicable)
Equipment/ductwork before concealment
- 2
Mechanical Final
Equipment operational, combustion air and venting verified
See the full Eaton inspection guide — scheduling & re-inspection fees →
Tips
- Furnace, AC, and gas-line/gas-meter permits are each flat $125.00 fees under the Over-the-Counter One-Stop schedule — use the Counter Building Permit form rather than the full Residential Building Permit application for straightforward equipment swaps.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eaton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Eaton
Mechanical / HVAC Permit (Furnace, Air Conditioning, Gas Line, Gas Fireplace) in other cities
Look up this fee in a different city →