Residential Building Permit (New Construction / Addition / Remodel / Repair / Basement Finish) — Eaton, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.eatonco.org/building-and-permitting
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction / Addition / Remodel / Repair / Basement Finish) in Eaton, Colorado
Required for new single-family/duplex/multi-family dwellings, garages, additions, remodels, repairs, and basement finishes in Eaton, using the Town's own 'Residential Building Permit' application form. Reviewed under the 2024 IBC/IRC as locally amended by Ordinance No. 664; inspections and plan review performed under contract by SAFEbuilt, with permits issued by the Town Clerk's Office.
Verified 2026-07-06 · Source
When you need this permit
- Completed and signed Residential Building Permit application (PURPOSE OF PERMIT covers New Building, Addition, Remodel, Repair, and Basement Finish on a single form)
- Digital submittal (flash drive, emailed, or uploaded via CommunityCore)
- Building plans: wall sections, floor plan, framing plan, elevations, door and window schedule, cabinet layout
- Engineered foundation drawings
- Plot plan showing all distances to lot lines and structures
- Site grading plan stamped by a civil engineer
- Mechanical, plumbing, and electrical drawings
- Energy code compliance documents, including Manual J, S, D and supporting documents
- Contractors must register/be verified in CommunityCore and pay the Town's $50/year Contractor Fee before applying online
- An 'Energy Compliance Certificate' (per the 2024 IECC) is required, along with leak-test reports for ductwork and building envelope, available to the inspector at final inspection and required before Certificate of Occupancy
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Prior to concrete placement
- 2
Structural Rough / Framing
Framing complete before cover
- 3
Insulation Inspection
Required following installation of wall, ceiling, and floor insulation and exterior windows, and before wall coverings are installed, per Ordinance No. 664's IRC Sec. R109.1.5.2 amendment
- 4
Electrical Rough / Mechanical Rough / Plumbing Rough
Trade rough-ins before concealment
- 5
Final Building
All work complete per approved plans; Energy Compliance Certificate and leak-test reports required before Certificate of Occupancy
See the full Eaton inspection guide — scheduling & re-inspection fees →
Tips
- Eaton's Building Department services are contracted to SAFEbuilt (970-305-3161, coemail@safebuilt.com) per the Town's own current Staff Directory and Building and Permitting page — this supersedes the Colorado DFPC prequalified-building-department list's 'ProCode Inc.' listing, which appears to reflect an earlier naming convention; ProCode is a SAFEbuilt company, and Eaton's own live pages consistently use the SAFEbuilt name.
- A stale, 2022-dated 'ProCode Inc.' Solar Permit FAQ handout still linked from the Town's Building and Permitting page cites outdated 2018 I-Codes and a Johnstown return address — do not rely on that document for current code editions; confirm current requirements directly with SAFEbuilt (970-305-3161) or against Ordinance No. 664.
- The Town's own Building and Permitting page states the newly adopted 2024 I-Codes 'go into effect January 1, 2026,' while Ordinance No. 664 itself (Section 17) states a standard 30-days-after-publication effective date following its November 20, 2025 final passage — both dates are published by the Town without being reconciled on a single page; confirm which edition governs a specific submittal date directly with SAFEbuilt.
- No review-timeline SLA is published anywhere by the Town — budget review time by contacting SAFEbuilt directly, since Colorado's home-rule structure places no statutory floor under Eaton the way it does in Arizona.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eaton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Eaton
Residential Building Permit (New Construction / Addition / Remodel / Repair / Basement Finish) in other cities