Roofing Permit (Re-Roof) in La Salle, Colorado

Required for roofing/re-roofing work in La Salle. Governed by the 2018 IRC/IBC as currently enforced by the Town's informational webpage (the Town's underlying Municode codification was found 2026-07-23 to have been updated to the 2024 IRC/IBC by Ordinance No. 19-2025, adopted 12/9/2025 — see this file's top-level codesAdopted note). Processed as an OVER-THE-COUNTER permit (no formal plan-review queue) per ProCode/SAFEbuilt's published Counter Permits list.

Verified 2026-07-23 · Source

When you need this permit

  • Roof plan and material specifications submitted per Town/ProCode requirements
  • Explicitly listed as a permit-required project type on the Town's Building Permits page ('roofs')
  • Re-roofing is processed as an OVER-THE-COUNTER permit type per ProCode/SAFEbuilt's live 'Counter Permits' handout — no formal plan review is queued for straightforward re-roofs
  • Per the Colorado Chapter ICC 'Single Family Residential Re-roofing' guide (hosted live on ProCode's LaSalle community resource page): the permit holder must call for required inspection(s); homeowners may self-perform re-roofing; roof sheathing must be repaired/replaced where warped, cracked, or delaminated; new underlayment (minimum 15# asphalt-saturated felt over a dry deck) is required on complete tear-offs, with one layer for slopes ≥4:12, 19-inch lapped starter courses for slopes between 2:12 and 4:12, and modified bitumen permitted below 2:12; fasteners must penetrate a minimum of 3/4 inch into the decking; a cricket or saddle is required on the ridge side of any chimney wider than 30 inches; roof jacks/vents must be raised to the new roof level and replaced if deteriorated Owner-builder

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Roofing Permit FeeValuation-based; no current published fee table — contact ProCode or Town Hall for a quote. Re-chased 2026-07-23 via Municode's current codification and ProCode's LaSalle community resource page — no numeric schedule published on either live channel, consistent with every other permit type in this file.
Not published — contact the department
Construction Use Tax
2% of total material cost

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit (Re-Roof) permit actually take in La Salle?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (roof)

    Completed roof — material and flashing compliance verified

See the full La Salle inspection guide — scheduling & re-inspection fees →

Tips

  • The Town's own 'Roofing Requirements' document (DocumentCenter/View/337) has returned a 404 since at least 2019 per Wayback CDX (every archived capture is a redirect, never a live render) and is confirmed unrecoverable. As of 2026-07-23, use ProCode/SAFEbuilt's live-hosted 'Single Family Residential Re-roofing' Building Guide instead (safebuilt.com/wp-content/uploads/2024/04/Single-Family-Residential-Re-roof.pdf) — it is the Town's designated contracted agency's own published resource and covers the same underlayment/inspection ground.
  • Re-roofing is one of only seven ProCode-published OVER-THE-COUNTER permit types in La Salle (alongside AC/furnace/water-heater replacement, residential electrical service changes, and misc. residential mechanical/electrical/plumbing work) — expect same-day issuance without a formal plan-review wait, unlike new construction, additions, remodels, or decks/patios, which ProCode's own handout confirms DO require plan review.

Frequently asked questions

Yes. Roofs are explicitly listed among the project types requiring a permit on the Town's Building Permits page, and ProCode/SAFEbuilt's published Counter Permits list confirms re-roofing is processed over-the-counter (same-day, no formal plan review queue).

La Salle does not publish a plan-review timeline for this permit. Contact Town of La Salle Building Inspections (contracted to ProCode Inc. / SAFEbuilt) at 970-305-3161 for current turnaround.

You'll need: Roofing Permit Application. Depending on your project, La Salle may also ask for: Single Family Residential Re-roofing — Building Guide (Colorado Chapter ICC, via ProCode); Residential Roofing Bill of Rights (via ProCode). See the required-documents checklist on this page for details on each.

La Salle requires 1 inspection(s) for a roofing permit (re-roof), in order: Final Inspection (roof). Schedule each through Town of La Salle Building Inspections (contracted to ProCode Inc. / SAFEbuilt) (970-305-3161).

Apply through Town of La Salle Building Inspections (contracted to ProCode Inc. / SAFEbuilt) at 128 N 2nd Street, La Salle, CO 80645. Phone: 970-305-3161. Office hours: Town of La Salle main line 970-284-6931. Building Inspections direct line 970-305-3161 (inspection requests ext. 1, general ext. 0). Building Official: Jonathan Gesick. Building permit review and inspections are contracted to ProCode Inc., a SAFEbuilt company (regional office: 39 S. Parish Avenue, Suite 220, Johnstown, CO 80534; COemail@safebuilt.com). General town office hours are not published on the Building Permits, Directory, or Municipal Code pages as of this review; not stated rather than assumed.. Official information: https://www.lasalletown.com/2169/Building-Permits.

La Salle, Colorado has adopted: 2018 International Building Code (IBC) — per the Town of La Salle Building Permits page: 'The Town of LaSalle has adopted and is currently enforcing the 2018 International Codes, 2012 Energy Conservation Code, and 2020 National Electrical Code.'; 2018 International Residential Code (IRC); 2018 International Mechanical Code (IMC); 2018 International Plumbing Code (IPC); 2018 International Fuel Gas Code (IFGC) (bundled under the page's 'International Codes' reference; not itemized by individual code title on the live page); 2012 International Energy Conservation Code (IECC) — the live page names this specifically as '2012 Energy Conservation Code,' an older cycle than the 2018 base I-Codes it is paired with; 2020 National Electrical Code (NEC); 2025 Colorado Wildfire Resiliency Code (Colorado Division of Fire Prevention and Control model code, dfpc.colorado.gov/WRCB) — listed as adopted on the Town's Building Permits page; Model Colorado Electric and Solar Ready Code (Colorado Energy Office, energyoffice.colorado.gov/building-energy-codes-toolkit) — listed as adopted on the Town's Building Permits page; Note on document currency and code-cycle discrepancy: the Town's Municode-codified Chapter 18 (Building Regulations), as of this review, still recites the 2003 IBC/IRC/IPC/IMC/IFGC, 1999 NEC, and 1997 Uniform Code for Abatement of Dangerous Buildings, with a 1977/1978-vintage Colorado energy standard — none of which match the 2018 I-Codes / 2012 IECC / 2020 NEC the Town's actively-maintained Building Permits webpage states it is 'currently enforcing.' Consistent with this corpus's established pattern (e.g. Vail), the live, actively-maintained Building Permits page is treated as the current governing statement of adopted codes, since Municode codification frequently lags the underlying adopting ordinances and La Salle's own current-enforcement statement is unambiguous and specific (exact code years named). The codified Chapter 18 text is retained here only as a source of durable local AMENDMENT language (definitions, frost depth, sleeping-room rules, refund provisions, fee-authorization mechanism) that is very likely still in force, since local amendments of this kind are typically carried forward from cycle to cycle rather than dropped, but the umbrella code EDITIONS themselves follow the live page.; Note on HB22-1362 (statewide energy floor, window July 2023-July 2026): the Town's stated 2012 IECC base energy code edition does NOT itself meet HB22-1362's requirement that jurisdictions updating their code during this window adopt at least the 2021 IECC. However, the Town's Building Permits page separately lists the 'Model Colorado Electric and Solar Ready Code' as adopted alongside the 2025 Colorado Wildfire Resiliency Code — meaning La Salle appears to have layered on the HB22-1362 electric/solar-ready provisions as a standalone addition without upgrading its underlying energy-code base edition to 2021 IECC. This is reported honestly as observed; this file does not assume full HB22-1362 compliance, only that the electric/solar-ready model code specifically has been adopted per the Town's own published list.; MAJOR RE-CHASE UPDATE, 2026-07-23 — Municode reversal: this file's prior methodology (see the two notes above) treated the Town's Municode-hosted codification as a stale 2003-era snapshot and deferred to the live Building Permits webpage for current code editions. A direct re-chase of library.municode.com/co/lasalle on 2026-07-23 found this assumption is NO LONGER CORRECT: La Salle's Municode codification is now current through Ordinance No. 5-2026 (enacted 3-24-2026), online content updated 7-1-2026, and Chapter 18 was comprehensively overhauled by Ordinance No. 19-2025 (adopted 12-9-2025) — confirmed by reading each article's adoption section directly: Sec. 18-18 now adopts the 2024 IBC (not 2018), Sec. 18-43 the 2023 NEC (not 2020), Sec. 18-68 the 2024 IPC (not 2018), Sec. 18-93 the 2024 IMC (not 2018), Sec. 18-143 the 2024 IRC (not 2018), and Sec. 18-166 the 2024 IECC (not 2012 — which would also resolve the HB22-1362 gap flagged in the note above, since 2024 IECC exceeds the 2021 IECC statewide floor). Chapter 18 was also restructured into 16 articles, adding new Article IX (2024 International Fire Code), Article XI (International Property Maintenance Code), Article XII (International Existing Building Code), Article XIII (International Swimming Pool and Spa Code), and Article XVI (Graywater Systems) — none of which are reflected in the Town's own Building Permits webpage, which as of this same re-chase (2026-07-23) still states only '2018 International Codes, 2012 Energy Conservation Code, and 2020 National Electrical Code.' The two Town-controlled channels now directly conflict, and the codified ordinance (more recently dated, and the Town's actual governing law) appears to be the accurate one, while the informational webpage appears to be the stale one — the reverse of this file's original assumption. Local-amendment LANGUAGE spot-checked against the new codification (120 sq ft accessory-structure exemption, 180-day permit expiration/half-fee renewal, 80% refund provisions, sleeping-room definition) was found carried forward unchanged into the 2024-edition articles, so those specific amendment provisions remain reliable. However, a full re-verification of every permitType's code-edition citations, and of the five newly-added articles, was OUT OF SCOPE for this partial-chase pass (which targeted only fee/timeline gaps) and should be treated as a distinct, dedicated follow-up chase rather than assumed complete. Sources: https://library.municode.com/co/lasalle (Chapter 18, Article II Sec. 18-18; Article III Sec. 18-43; Article IV Sec. 18-68; Article V Sec. 18-93; Article VII Sec. 18-143; Article VIII Sec. 18-166 — all citing Ord. No. 19-2025, 12-9-2025).. Local amendments apply — see the La Salle overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Salle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.