EV Charger / EVSE Permit in La Salle, Colorado
Electric vehicle charging equipment (EVSE) installation in La Salle is processed as ordinary electrical work, issued locally by the Town (via its contracted plan-review/inspection agency, ProCode Inc., a SAFEbuilt company) under the 2020 NEC as adopted — the same mechanism documented on the general Electrical Permit entry. The Town's Building Permits page does not itemize EV chargers, EVSE, or charging stations as their own named project type, and no current numeric building-permit fee schedule (valuation-tier table) of any kind is published anywhere on the Town's website; the page states only the calculation method (valuation-based, including labor/materials/profit) plus a flat 2% construction use tax on material cost.
Reviewed 2026-07-20 · Source
When you need this permit
- Electrical permit required for EVSE/EV charger circuit installation, alteration, or repair, governed by the 2020 NEC as currently enforced by the Town
- Electricians must register with the Town/ProCode before applying for a permit and must provide current Colorado DORA State Electrical Board license credentials at registration
- Town/ProCode staff verify DORA license status contemporaneously using DORA's licensing service
- As a town of roughly 3,500 residents, La Salle falls below the population threshold (10,000) that makes a Colorado municipality a 'covered municipality' under HB24-1173 (Electric Vehicle Charging System Permits Act), so it was not required to take a Dec. 31, 2025 compliance action under that law
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Town of La Salle 2026 Fee Schedule (effective 1 January 2026), Electrical fees, page 9 — electrical work by valuation at $200.00 for $1–$2,000 and $300.00 plus $15.00 per $1,000 above. Show full citationHide
Town of La Salle 2026 Fee Schedule (effective 1 January 2026), Electrical fees, page 9 — electrical work by valuation at $200.00 for $1–$2,000 and $300.00 plus $15.00 per $1,000 above. The previous entry recorded that electrical fees are set by resolution and “set forth in the town fee schedule” without a published figure; that fee schedule is the document publishing them.Review timeline
Inspection process
- 1
Rough Electrical
Wiring and panel installed before concealment; contemporaneous DORA license review may occur
- 2
Final Inspection
EVSE circuit, breaker/disconnect, and NEC Article 625 compliance verified; system energized
See the full La Salle inspection guide — scheduling & re-inspection fees →
Tips
- La Salle's Building Permits page does not name 'EV charger' or 'EVSE' as its own itemized project type — like solar, EVSE installation is inferred to fall under the Town's general Electrical Permit process. Confirm directly with ProCode whether a distinct workflow or fee category applies.
- La Salle is below the 10,000-population threshold that triggers HB24-1173's Dec. 31, 2025 EV-charger-permitting compliance requirement for Colorado municipalities, so no state-mandated expedited review process applies here the way it might in a larger covered municipality.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Online permit portal
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Salle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
La Salle's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for La Salle yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when La Salle lands. Privacy.
Other permits in La Salle
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your La Salle project checklist
Describe your project once and get every permit, document, and fee it triggers in La Salle — in one checklist. Free, for any city and any number of projects.
Get started →