Commercial Building Permit (New Construction / Addition) — La Salle, Colorado · Requirements sheet
Reviewed 2026-08-02 · Source: https://www.lasalletown.com/2169/Building-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit (New Construction / Addition) in La Salle, Colorado
Required for new commercial building construction and commercial additions in the Town of La Salle. The Town's own Building Permits page presents a single unified permit system (it does not itemize commercial as a separate track — its illustrative project list is residential-flavored), but the Town's contracted plan-review/inspection agency ProCode Inc. (SAFEbuilt) explicitly categorizes 'NEW COMMERCIAL BUILDING' and 'COMMERCIAL ADDITION' as distinct permit types requiring formal plan review in its published 'Requires a Plan Review' handout. Reviewed under the IBC as adopted (the Town's live webpage states 2018 I-Codes; the Town's current Municode codification, Sec. 18-18 as amended by Ord. No. 19-2025, adopts the 2024 IBC — see the codesAdopted notes for the documented conflict between the two Town channels), with the same Community Core application portal, valuation-based fee method, and 2% construction use tax as all other La Salle permits.
Reviewed 2026-08-02 · Source
When you need this permit
- Formal plan review is required — ProCode/SAFEbuilt's 'Requires a Plan Review' handout explicitly lists NEW COMMERCIAL BUILDING and COMMERCIAL ADDITION among plan-review-required permit types; commercial work is never processed over-the-counter
- Governed by the IBC as adopted by the Town (2018 IBC per the Town's live Building Permits page; 2024 IBC per the Town's current Municode codification, Sec. 18-18, Ord. No. 19-2025 — confirm the operative edition with ProCode before finalizing a code analysis)
- Commercial energy compliance: ProCode's La Salle resource page links a 'Commercial Energy Code Handout' pointing to the Colorado Energy Office's building energy codes program (energyoffice.colorado.gov/buildings/building-energy-codes); the Town's live page states the 2012 IECC while its current codification (Sec. 18-166, Ord. No. 19-2025) adopts the 2024 IECC
- Health Department pre-approval: per ProCode's 'Health Department Review Information' handout, plan review and approval by the county health department is required BEFORE construction starts — and building permits are held until health-department plan approval — for new construction or remodeling of restaurants, delis, coffee shops, concession stands, catering operations, bars, hotels, grocery/convenience stores, food/beverage manufacturing, food warehouses, health care facilities, daycare centers, schools, and pools. For La Salle (Weld County), the reviewing agency is the Weld County Department of Public Health & Environment, 1555 North 17th Avenue, Greeley, CO 80631, 970-304-6410, weldhealth.org
- Commercial electrical service changes require plan review (unlike residential service changes, which ProCode's Counter Permits handout lists as over-the-counter) — 'COMMERCIAL ELECTRICAL SERVICE CHANGE' is itemized on the plan-review-required list
- Electricians and plumbers must hold current Colorado DORA licenses, registered with the Town/ProCode and subject to contemporaneous verification; the Colorado Chapter ICC procedure the Town follows explicitly emphasizes field license reviews on large multifamily/commercial sites
- Application submitted through the Town's Community Core online permitting system; a hard copy of reviewed/stamped plans must be kept on the job site
- Temporary structures and oil & gas / communication tower projects are separately itemized plan-review categories on ProCode's handout (temporary structures flagged 'SEE FIRE DEPT')
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
The Town's own '2026 Fee Schedule, Effective 1/1/2026' (lasalletown.com/DocumentCenter/View/1815/2026-Uniform-Fee-Schedule) is a 12-page Document Center PDF not linked from the Building Permits page,… Show full citationHide
The Town's own '2026 Fee Schedule, Effective 1/1/2026' (lasalletown.com/DocumentCenter/View/1815/2026-Uniform-Fee-Schedule) is a 12-page Document Center PDF not linked from the Building Permits page, the Development Fees page, or ProCode's La Salle resource page. Its 'BUILDING PERMIT FEES' section states it is 'APPENDIX L 2018 IRC' and gives the complete valuation-tier base-fee table (e.g. $1-$5,900 = $24; $2,001-$40,000 = $69 for the first $2,000 plus $11 per additional $1,000 or fraction thereof; up to $5,000,001+ = $18,327 for the first $5,000,000 plus $1 per additional $1,000). Two category multipliers are then applied to that base fee: 'Residential Construction — 65% of Permit fee' and 'Non-Residential Construction — 65% of Permit fee.' Commercial new construction and additions fall under 'Non-Residential Construction' — the schedule does not further subdivide commercial by new-construction vs. addition, consistent with La Salle running one unified fee method across project types. A separate 'Administration Fee' line applies on top of the 65%-of-base figure: '$25.00' for 'Residential and Counter Permits' vs '$50.00' for 'Commercial.' No plan-review turnaround/day-count figures appear anywhere in this 12-page document — it resolves the fee question only, not the timeline (see reviewTimelineNote). Contact ProCode (970-305-3161) or Town Hall (970-284-6931) to confirm project-specific valuation classification.Per the Town's Building Permits page; applies to commercial projects the same as residential — the page states one unified system. Show full citationHide
Per the Town's Building Permits page; applies to commercial projects the same as residential — the page states one unified system. The Town's 2026 Uniform Fee Schedule (Document Center View/1815, effective 1/1/2026, found 2026-08-02) additionally specifies the VALUATION BASIS used to compute this 2% tax, distinct from the rate itself: 'Valuations will be based on provided labor and material cost or the most current ICC BVD Data table to get an accurate value. Use Tax will be calculated based on 50% of the calculated cost or the provided material cost whichever is greater.'Review timeline
Inspection process
- 1
Foundation
Before concrete pour, per approved engineered design
- 2
Framing / Structural
Structural systems complete, before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment; contemporaneous DORA license field reviews are emphasized on large multifamily/commercial sites per the Town's adopted Colorado Chapter ICC procedure
- 4
Final Inspection / Certificate of Occupancy
All work complete per approved plans and applicable codes prior to occupancy
See the full La Salle inspection guide — scheduling & re-inspection fees →
Tips
- The Town's own Building Permits webpage never mentions 'commercial' — the commercial permit categories are documented only in ProCode/SAFEbuilt's published handouts on its La Salle community resource page (safebuilt.com/about/our-companies/procode/la-salle). Route commercial pre-application questions to ProCode (970-305-3161), the Town's contracted plan-review agency, not just Town Hall.
- If your project involves food service, lodging, groceries, health care, daycare, a school, or a pool, start Weld County Department of Public Health & Environment plan review (970-304-6410) early — ProCode's own handout instructs that building permits be HELD until health-department plan approval, making this a hard critical-path dependency, not a parallel formality.
- Verify the operative code edition with ProCode before design: the Town's live webpage says 2018 IBC / 2012 IECC / 2020 NEC, but the Town's current Municode codification (Ord. No. 19-2025, adopted 12-9-2025) adopts the 2024 IBC / 2024 IECC / 2023 NEC. Designing a commercial shell to the wrong energy-code cycle is an expensive miss.
- A commercial electrical service change requires formal plan review in La Salle even though the equivalent residential service change is an over-the-counter permit — do not assume same-day issuance for any commercial-scope trade permit.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-02.
Fee schedules
Checklists & handouts
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Salle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in La Salle.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
La Salle's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for La Salle yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when La Salle lands. Privacy.
Other permits in La Salle
Commercial Building Permit (New Construction / Addition) in other cities
Compare commercial building permit (new construction / addition) fees across Colorado →
Look up this fee in a different city →
Now live
Build your La Salle project checklist
Describe your project once and get every permit, document, and fee it triggers in La Salle — in one checklist. Free, for any city and any number of projects.
Get started →