Residential Building Permit (New Construction) in Eagle, Idaho

Required for new single-family dwellings, accessory dwelling units, detached garages and shops, sheds, and additions in Eagle. All residential and commercial structures — and appurtenances connected or attached — require a permit for new construction, additions, alterations, relocation, enlargement, replacement, repair, or demolition. Plan review turnaround for single-family homes, ADUs, detached garages/shops, and sheds is currently 6 weeks (high-volume notice published by the Building Division). Applications submitted via the Contractor Portal or in person at 660 E Civic Lane.

Verified 2026-06-29 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building Permit — new construction (valuation-based per ICC Building Valuation Data Aug 2022)Cost up to $20,000: multiply by 3% plus $60; cost $20,001–$100,000: subtract $20,000, multiply by 2%, plus $660; cost over $100,001: subtract $100,000, multiply by 1%, plus $2,260Eagle Building Department Fee Schedule (Resolution 23-34, effective Jan 2023). Square-foot construction costs are adopted from ICC Building Valuation Data dated August 2022 (cityofeagle.org/DocumentCenter/View/7455). Use Residential Permit Fee Estimator (XLS) at cityofeagle.org/DocumentCenter/View/563.
Re-inspection Fee$65.00 minimum per occurrenceEagle Building Department Fee Schedule (Resolution 23-34)
Plan Checking$65.00 minimum plus $65.00 per hour or portion thereofEagle Building Department Fee Schedule (Resolution 23-34)
Demolition Permit$65.00Eagle Building Department Fee Schedule (Resolution 23-34)

Review timeline

3042 business days

Eagle’s published plan-review target

Inspection process

  1. 1

    Footing / Foundation

    Submit online via Contractor Portal before 4:00 PM for next-business-day inspection; footing inspections shall be approximately one hour prior to pouring concrete. Pouring times must be scheduled between 9 AM and 4 PM.

  2. 2

    Framing

    After framing, sheathing, and rough-in trades complete — before insulation or wall cover

  3. 3

    Final

    All work complete per approved plans; Certificate of Occupancy issued after passing final inspection

Tips

Frequently asked questions

How long does plan review take for a new home in Eagle?
Eagle's published plan review turnaround time for single-family homes, ADUs, detached garages/shops, sheds, and additions is currently 6 weeks (high-volume notice on cityofeagle.org/153/Building). Revisions reset the clock. Townhomes take 6–8 weeks and require Planning & Zoning Design Review approval first.
How do I schedule an inspection in Eagle?
Submit all inspection requests online through the Eagle Contractor Portal (eagle_permit.portal.iworq.net) before 4:00 PM to receive an inspection the next business day. You will need your permit number and access code. Footing inspections must be scheduled approximately one hour before the pour.

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Eagle

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.