Commercial Building Permit (State-Administered) in Miles City, Montana
Covers new commercial construction, additions, alterations, repairs and changes of occupancy in Miles City. Who issues the permit is genuinely unsettled on the published record, and an applicant should confirm before filing. Montana DLI's Certified City, County and Town Programs roster lists Miles City's certification as "B, M, SP, E (residential only)". If that qualifier covers the whole list, the city's program is residential-only and the Montana DLI Building Codes Bureau in Helena issues, plan-reviews and inspects commercial building permits here. If it attaches only to Electrical — the placement used for every other qualified jurisdiction on the same roster, such as Libby and Troy, is immediately after the code it modifies — then Miles City's own Building (B) certification is full scope and the City issues the commercial building permit itself, with only commercial electrical going to the state. Call the city's certified program contact, Gabe Martinsen at (406) 874-8611, and the DLI Building Codes Bureau, before submitting; filing with the wrong agency is the expensive outcome. The code in force either way is the 2021 International Building Code as adopted statewide under Administrative Rules of Montana Title 24, Chapter 301, and the fee lines below are the state schedule that applies if DLI has jurisdiction.
Reviewed 2026-08-26 · Source
When you need this permit
- A state building permit is required before start of construction, alteration, addition, repair, or change of occupancy for a commercial or other non-exempt building in Miles City, since the city's certified Building program is residential only (Montana DLI Certified City, County and Town Programs list, Miles City row: 'B, M, SP, E (residential only)')
- Apply online at ebiz.mt.gov (the Bureau's Accela permitting portal) or submit the paper Application for Building Permit (BCP-1, Rev. 11/25) by mail or email to the Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, per Title 50, Chapter 60, Section 104, MCA and ARM 24.301-131
- Submittal must follow the Bureau's Commercial Building Plan Review Submittal Requirements checklist: project description and IBC construction type, site plan (property lines, adjacent buildings/uses within 30 feet, vehicular/pedestrian access, parking), floor plans (room use, window/door schedule, egress, mechanical/electrical/foundation/framing plans), elevation drawings, and ResCheck/ComCheck energy-code compliance documentation
- Reviewed under the 2021 International Building Code, effective statewide June 11, 2022 and adopted/amended by ARM Title 24, Chapter 301, Subchapter 1 — not City of Miles City Code § 5-2/§ 5-4, which governs only the city's own certified (residential) Building program
- Both the building permit fee and the plan review fee must be paid in full before the Bureau issues the permit; do not send fees with the initial submittal unless assigned a project number
- Separate state permits are required for electrical, plumbing, and mechanical work on the same commercial project — Miles City holds no DLI certification for Plumbing or Mechanical work of any kind, and its Electrical certification is residential only, so commercial electrical, plumbing, and mechanical permits are all issued by the Bureau, not the city (see the Electrical, Plumbing, and Mechanical/HVAC permit entries above)
- A City of Miles City Business License is still required to operate a business at the location — a separate city requirement from the state building permit — applied for via the city's Cloud Permit system; general business license fees are currently under a City Council administrative hold (since October 24, 2023), so applicants should not send payment with the license application
- Zoning compliance remains a city matter: the project must conform to Miles City Code Chapter 24 (Zoning), and certain commercial zoning districts require a Site Plan Permit reviewed by the Miles City Planning Board before construction — contact the Planning Office, 2nd Floor City Hall, (406) 234-6339, to confirm district and site-plan requirements for a specific property
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
Tips
- Miles City's own building pages were unreachable when this was checked, so the certification scope could not be settled against the city's own materials. The record elsewhere in this jurisdiction reads the DLI roster the other way — as Building being full scope with only Electrical residential-limited — and that reading and the one above cannot both be right. Confirm with the city and with the Montana DLI Building Codes Bureau before filing.
- Confirm directly with the Building Inspector, Gabe Martinsen, (406) 874-8611, or the DLI Building Codes Bureau, (406) 841-2056, which agency has jurisdiction before applying — the City of Miles City's own building-permit application and Cloud Permit system are for its certified (residential) program only and do not cover commercial work.
- A commercial project's electrical, plumbing, and mechanical permits are also state-administered in Miles City, unlike a residential project where electrical is issued by the city — see the Electrical, Plumbing, and Mechanical/HVAC permit entries above.
- Fire sprinkler and fire alarm plan review for a commercial project is handled separately by Miles City Fire & Rescue, and larger public-building projects may also need a submission to the Montana State Fire Marshal's Office — see the Fire Sprinkler & Fire Alarm Permit entry above.
- Do not send fees with the initial state submittal unless the Bureau has assigned a project number; both the building permit fee and the 35% plan review fee must be paid before the state issues the permit.
- A City of Miles City Business License is still required to operate the business once built, separately from the state building permit — general business license fees have been under a City Council administrative hold since October 24, 2023, so do not send payment with that application without confirming current status.
- Zoning and site-plan compliance stay with the city: confirm the property's zoning district and whether a Site Plan Permit (reviewed by the Miles City Planning Board) applies before designing a commercial project, through the Planning Office, 2nd Floor City Hall, (406) 234-6339.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-26.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Miles City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Miles City.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Miles City
Commercial Building Permit (State-Administered) in other cities
Compare commercial building permit (state-administered) fees across Montana →
Look up this fee in a different city →
Now live
Build your Miles City project checklist
Describe your project once and get every permit, document, and fee it triggers in Miles City — in one checklist. Free, for any city and any number of projects.
Get started →