Solar Photovoltaic (PV) Permit in Miles City, Montana
Residential solar PV installations in Miles City are permitted through the City of Miles City Building Department: a Building Permit for the structural roof- or ground-mount work, plus a Residential Electrical Permit for the interconnection/panel work, since Miles City is DLI-certified for residential Electrical. No solar-specific ordinance, application, or fee schedule is separately codified.
Verified 2026-07-03 · Source
When you need this permit
- Structural mounting (roof-mount or ground-mount) work is permitted as a Building Permit (Class of Work 'Addition' or 'Other'), submitted via Cloud Permit or the paper Building Permit Application
- Electrical interconnection work (new circuits, inverter, panel/service changes) is permitted as Residential Electrical work under the same Building Department application, since Miles City holds residential (not commercial) DLI Electrical certification
- No local zoning provision specific to solar PV setbacks or height was found in Miles City Code Chapter 24 (Zoning) as of this review — general accessory-structure/height and setback standards of the applicable zoning district would apply to ground-mount installations
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
Tips
- Review timeline governed by statute: the structural roof-/ground-mount work on a single-family dwelling is a Building Permit filed on the single-family-dwelling Building Permit Application, so MCA 50-60-106(2)(c) applies — Miles City (certified under 50-60-302 for Building) must issue 'the relevant building permit or notice of plan disapproval within 10 working days of the contractor's submission' when the department's single-family-dwelling checklist is attached. Simple residential solar submittals often issue well inside that window (range floor 1 working day; the 2013 DEQ survey below recorded a same-day process under a prior inspector). The city publishes no separate SLA (independently reconfirmed 2026-07-03).
- Solar PV installations that only add roof/ground-mount hardware plus residential wiring can be handled entirely by the City of Miles City Building Department (Building + Residential Electrical) — no state permit is needed unless the installation is on a commercial building, since Miles City's Electrical certification is residential-only.
- A 2013 Montana DEQ statewide solar-permitting survey recorded Miles City (under a prior Building Inspector, Dennis Hirsch) using a Building-permit-only, same-day process; that record predates the city's current residential Electrical certification (adopted via Ord. No. 1392, 3-11-25) and is noted here only as historical background, not as a currently verified process.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Miles City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Miles City
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Montana →
Look up this fee in a different city →
Now live
Build your Miles City project checklist
Describe your project once and get every permit, document, and fee it triggers in Miles City — in one checklist. Free, for any city and any number of projects.
Get started →