Solar Photovoltaic (PV) Permit in Shelby, Montana
Required for installing a rooftop or ground-mount photovoltaic system within Shelby city limits. Because Shelby is DLI-certified for Building only, TWO permits and TWO authorities apply: a City of Shelby Building Permit for the structural/roof-mount work (valuation-based, City Building Official) and a State of Montana Residential (or Commercial) Electrical Permit for the PV electrical installation, issued directly by the Montana DLI Building Codes Bureau in Helena, which adds a flat Alternative Energy Source fee on top of its standard electrical fee.
Verified 2026-07-20 · Source
When you need this permit
- City of Shelby Building Permit required if the installation constitutes a structural change (racking/roof-mount work), per Shelby Municipal Code 10-1-9.B — whether a given installation qualifies is determined by the building inspector
- State of Montana Residential (or Commercial) Electrical Permit required for the PV system's electrical installation — mailed to the Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online at ebiz.mt.gov; NOT issued by the City of Shelby
- On the state Electrical Permit application, answer 'Yes' to 'Does this project consist of, or include an Alternative Energy Source?' and select 'Solar,' then select either 'Micro Inverter/AC Module System' or 'PV String System'
- Licensed electrical contractors apply for the electrical permit and select solar on the application; non-electrician installers submit an alternate energy permit with solar specifications; homeowners may obtain a homeowner electrical permit for a single-family system
- All commercial solar work requires a licensed electrical contractor to apply for the permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
City Building Inspection
Structural/roof-mount racking and roof-penetration compliance, conducted by the City's building official
- 2
State Electrical Inspection
Rough-in and final inspection of the PV electrical work performed under the state-issued Electrical Permit
See the full Shelby inspection guide — scheduling & re-inspection fees →
Tips
- Solar in Shelby needs TWO separate permits from TWO separate authorities: a City of Shelby Building Permit for any structural/roof-mount component (valuation-based, no solar-specific fee line) and a State of Montana DLI Electrical Permit for the PV electrical work (which does have a dedicated Alternative Energy Source option, at $45).
- Alternative Energy Source is option K on the state form's Type of Work list, at $45. The form presents A through DD as application options to select from, so it sits alongside the base categories such as A (up to 200-amp single-family service, $200) rather than being added to one.
- Non-structural remodeling that doesn't affect structural integrity needs no City building permit at all under Shelby Municipal Code 10-1-9.A — but confirm with the Building Official whether a specific roof-mount solar racking installation qualifies as 'structural' before assuming no City permit is needed.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Shelby building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Shelby's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Shelby yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Shelby lands. Privacy.
Other permits in Shelby
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Montana →
Look up this fee in a different city →