Skip to main content
PermitBase

EV Charger / Electric Vehicle Charging Station Permit in Shelby, Montana

Installing an EV charger in Shelby is electrical work, and because Shelby is DLI-certified for Building only (not Electrical), the permit for the charging circuit is issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Shelby -- the same state-issuance mechanism already documented in this file for the electrical-permit-state and solar-pv-permit entries. The state's Application for Residential Electrical Permit does not carry a dedicated 'EV charger' or 'EVSE' line item (unlike its explicit $65 Alternative Energy Source add-on for solar/wind/hydro); a new EV charger circuit at an existing single-family dwelling is billed under the form's general 'Single Family Interior/Exterior Wire or Rewire' fee categories for adding one or more circuits or pieces of equipment. A City of Shelby Building Permit is required in addition only if the installation includes new structural work (e.g., a carport built to house the charger), billed under the City's general valuation-based fee schedule at Shelby Municipal Code 1-12-13, the same mechanism documented for solar's structural/racking scope.

Verified 2026-07-20 · Source

When you need this permit

  • The EV charger circuit itself must be permitted through the Montana DLI Building Codes Bureau (Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or apply online at ebiz.mt.gov) -- not through the City of Shelby, which holds Building-only DLI certification and has no electrical permitting function
  • On the state Application for Residential Electrical Permit, a new EV charger circuit at an existing single-family dwelling is selected under 'Single Family Interior/Exterior Wire or Rewire': category H ('1 additional circuit or piece of equipment') for a single dedicated EV circuit with no panel change, or category G ('2-3 additional circuits or pieces of equipment') if multiple circuits/equipment are added at once; category E or F applies if 4+ circuits and/or a panel/service change are involved
  • Applications must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work, with payment submitted with the application
  • A City of Shelby Building Permit is required only if new structural work (e.g., a carport or accessory structure) is built to house the charger, per the same 'structural change' standard (Shelby Municipal Code 10-1-9.B) documented for solar racking work

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

State Electrical Permit — 1 additional circuit or piece of equipment (Category H)Montana Building Codes Bureau, Application for Residential Electrical Permit (Rev. 12/22) -- applies to a single new EV charger circuit added to an existing single-family dwelling with no panel/service change; this is the general-schedule line item under which EV charger circuits are billed, as the form carries no dedicated EV-charger or EVSE fee line (unlike its explicit $65 Alternative Energy Source add-on for solar/wind/hydro)
$45
State Electrical Permit — 2-3 additional circuits or pieces of equipment (Category G)Application for Residential Electrical Permit (Rev. 12/22) -- applies if the EV charger installation is bundled with other new circuits/equipment
$70
City Building Permit Fee — valuation $1.00 to $500.00 (only if new structure, e.g. carport, is built to house the charger)Shelby Municipal Code 1-12-13 -- applies only when new structural work is involved; a standalone wall/pedestal charger with no new structure does not require this
$23.50

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Shelby?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Electrical Inspection

    New circuit wiring, breaker, and disconnect verified, performed under the state-issued Electrical Permit per the 2020 NEC

See the full Shelby inspection guide — scheduling & re-inspection fees →

Tips

  • Do not contact the City of Shelby Building Official to obtain the EV charger electrical permit -- electrical work anywhere within city limits is issued directly by the Montana DLI Building Codes Bureau in Helena, since Shelby holds Building-only DLI certification.
  • A single new EV charger circuit added to an existing home with no other panel work fits the state form's cheapest 'Single Family Interior/Exterior Wire or Rewire' category (H, $45) -- confirm with the Building Codes Bureau (406-841-2056) if your installation also involves a panel upgrade or service change, which moves it into a higher-fee category.
  • Unlike solar (which gets an explicit $65 Alternative Energy Source add-on on the state form), EV chargers have no dedicated line item -- they're billed as ordinary new-circuit electrical work.

Frequently asked questions

Shelby requires an ev charger / electric vehicle charging station permit for: The EV charger circuit itself must be permitted through the Montana DLI Building Codes Bureau (Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or apply online at ebiz.mt.gov) -- not through the City of Shelby, which holds Building-only DLI certification and has no electrical permitting function; On the state Application for Residential Electrical Permit, a new EV charger circuit at an existing single-family dwelling is selected under 'Single Family Interior/Exterior Wire or Rewire': category H ('1 additional circuit or piece of equipment') for a single dedicated EV circuit with no panel change, or category G ('2-3 additional circuits or pieces of equipment') if multiple circuits/equipment are added at once; category E or F applies if 4+ circuits and/or a panel/service change are involved; Applications must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work, with payment submitted with the application; A City of Shelby Building Permit is required only if new structural work (e.g., a carport or accessory structure) is built to house the charger, per the same 'structural change' standard (Shelby Municipal Code 10-1-9.B) documented for solar racking work. If your project isn't listed, confirm with City of Shelby Building Department — Building Official Keith Thaut (per the City's live Building & Zoning page, https://www.shelbymt.com/building, fetched 2026-07-16: 'Keith Thaut Building Inspector'); city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical/HVAC permits within Shelby city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. NOTE: the Montana DLI Building Codes Bureau's own certified-jurisdictions roster PDF (updated 04/22/2026) spells the same position 'Ken Thaut' — a name-spelling discrepancy between two current primary sources (city website vs. state roster) that could not be independently resolved as of 2026-07-16; both are cited so nothing is silently reconciled. at (406) 434-5222 before starting work.

No. Unlike its explicit $65 Alternative Energy Source add-on for solar, wind, or hydro projects, the state's Application for Residential Electrical Permit has no dedicated EV-charger or EVSE line item. A new EV charger circuit is billed under the general 'Single Family Interior/Exterior Wire or Rewire' categories -- typically $45 for one additional circuit or piece of equipment.

Shelby does not publish a plan-review timeline for this permit. Contact City of Shelby Building Department — Building Official Keith Thaut (per the City's live Building & Zoning page, https://www.shelbymt.com/building, fetched 2026-07-16: 'Keith Thaut Building Inspector'); city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical/HVAC permits within Shelby city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. NOTE: the Montana DLI Building Codes Bureau's own certified-jurisdictions roster PDF (updated 04/22/2026) spells the same position 'Ken Thaut' — a name-spelling discrepancy between two current primary sources (city website vs. state roster) that could not be independently resolved as of 2026-07-16; both are cited so nothing is silently reconciled. at (406) 434-5222 for current turnaround.

You'll need: Application for Residential Electrical Permit (Montana DLI Building Codes Bureau). Depending on your project, Shelby may also ask for: City of Shelby Building Permit Application (only if new structure is built). See the required-documents checklist on this page for details on each.

Shelby requires 1 inspection(s) for an ev charger / electric vehicle charging station permit, in order: State Electrical Inspection. Schedule each through City of Shelby Building Department — Building Official Keith Thaut (per the City's live Building & Zoning page, https://www.shelbymt.com/building, fetched 2026-07-16: 'Keith Thaut Building Inspector'); city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical/HVAC permits within Shelby city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. NOTE: the Montana DLI Building Codes Bureau's own certified-jurisdictions roster PDF (updated 04/22/2026) spells the same position 'Ken Thaut' — a name-spelling discrepancy between two current primary sources (city website vs. state roster) that could not be independently resolved as of 2026-07-16; both are cited so nothing is silently reconciled. ((406) 434-5222).

Apply through City of Shelby Building Department — Building Official Keith Thaut (per the City's live Building & Zoning page, https://www.shelbymt.com/building, fetched 2026-07-16: 'Keith Thaut Building Inspector'); city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical/HVAC permits within Shelby city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. NOTE: the Montana DLI Building Codes Bureau's own certified-jurisdictions roster PDF (updated 04/22/2026) spells the same position 'Ken Thaut' — a name-spelling discrepancy between two current primary sources (city website vs. state roster) that could not be independently resolved as of 2026-07-16; both are cited so nothing is silently reconciled. at 112 1st Street South, Shelby, MT 59474. Phone: (406) 434-5222. Office hours: Shelby City Hall: contact (406) 434-5222 for all building inspection and ordinance enforcement matters, per the City's current Building & Zoning page (the former 'City Building Inspector' page at /city-building-inspector/ is a 404 as of 2026-07-16 — the City's site re-platformed from a custom/WordPress-style CMS to Wix, and this content now lives at /building). Building Official Keith Thaut is named on that live page; the Montana DLI Building Codes Bureau's certified-jurisdictions roster lists the same position as 'Ken Thaut' (see department name note).. Official information: https://www.shelbymt.com/building.

Shelby, Montana has adopted: Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; non-certified trades in a partially-certified jurisdiction fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs (bsd.dli.mt.gov/building-codes-permits).; Shelby is a Montana DLI-certified jurisdiction for Building (B) ONLY within city limits; certified building official on file with DLI: Ken Thaut, (406) 434-5222. Verified directly against the DLI Building Codes Bureau's 'Montana Certified Local Government Program' roster PDF (fetched and text-extracted directly from the primary-source PDF, updated 04/22/2026): 'Shelby | B | Ken Thaut | 434-5222 | City Limits'. Source: https://bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf. NOTE (2026-07-16 re-check): this DLI roster quote is preserved verbatim and re-confirmed current (re-fetched and re-extracted from the same PDF this session, still reading 'Ken Thaut'), but the City of Shelby's own live website (shelbymt.com/building, fetched the same day) spells the position 'Keith Thaut.' This is a genuine discrepancy between two current primary sources that could not be independently resolved — both spellings are recorded rather than one being silently chosen as correct.; Shelby Municipal Code Title 10 (Building Regulations), Chapter 1 (Building Codes), Section 10-1-1 (Adoption Of Model Building And Technical Codes By Administrative Action), last amended by Ordinance 803 (9-20-2010): adopts by reference, through administrative action of the building inspector as authorized by Mont. Code Ann. Section 50-60-301(1)(b), 'the current editions of the building, mechanical and related codes and all accompanying appendices, amendments and modifications adopted by the bureau of building and measurement standards, Montana department of labor and industry (or its successor), as set out in the administrative rules of Montana.' Source: City of Shelby Code of Ordinances, https://codelibrary.amlegal.com/codes/shelbymt/latest/shelby_mt/0-0-0-2417 (section 10-1-1); Per the Montana DLI Building Codes Bureau's Current Codes page (statewide effective date June 11, 2022, applicable to all certified and state-enforced jurisdictions alike): 2021 IBC, 2021 IRC, 2021 IEBC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 ISPSC, 2021 UPC, 2020 NEC, 2017 ICC A117.1 Accessibility. Shelby's own municipal code (Title 10, Chapter 1) adopts the state-published editions by administrative reference rather than authoring independently amended code text, consistent with a small B-only-certified jurisdiction enforcing the state-adopted editions. Source: bsd.dli.mt.gov/building-codes-permits/current-codes. Local amendments apply — see the Shelby overview page for the full list.

The electrical work itself is permitted directly through the Montana DLI Building Codes Bureau in Helena (PO Box 200517, Helena, MT 59620-0517, or ebiz.mt.gov), not the City of Shelby, because Shelby is DLI-certified for Building only. A City building permit is only needed in addition if new structural work (like a carport) is built to house the charger.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Shelby building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.