EV Charger / Electric Vehicle Charging Station Permit in Shelby, Montana
Installing an EV charger in Shelby is electrical work, and because Shelby is DLI-certified for Building only (not Electrical), the permit for the charging circuit is issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Shelby -- the same state-issuance mechanism already documented in this file for the electrical-permit-state and solar-pv-permit entries. The state's Application for Residential Electrical Permit does not carry a dedicated 'EV charger' or 'EVSE' line item (unlike its explicit $65 Alternative Energy Source add-on for solar/wind/hydro); a new EV charger circuit at an existing single-family dwelling is billed under the form's general 'Single Family Interior/Exterior Wire or Rewire' fee categories for adding one or more circuits or pieces of equipment. A City of Shelby Building Permit is required in addition only if the installation includes new structural work (e.g., a carport built to house the charger), billed under the City's general valuation-based fee schedule at Shelby Municipal Code 1-12-13, the same mechanism documented for solar's structural/racking scope.
Verified 2026-07-20 · Source
When you need this permit
- The EV charger circuit itself must be permitted through the Montana DLI Building Codes Bureau (Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or apply online at ebiz.mt.gov) -- not through the City of Shelby, which holds Building-only DLI certification and has no electrical permitting function
- On the state Application for Residential Electrical Permit, a new EV charger circuit at an existing single-family dwelling is selected under 'Single Family Interior/Exterior Wire or Rewire': category H ('1 additional circuit or piece of equipment') for a single dedicated EV circuit with no panel change, or category G ('2-3 additional circuits or pieces of equipment') if multiple circuits/equipment are added at once; category E or F applies if 4+ circuits and/or a panel/service change are involved
- Applications must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work, with payment submitted with the application
- A City of Shelby Building Permit is required only if new structural work (e.g., a carport or accessory structure) is built to house the charger, per the same 'structural change' standard (Shelby Municipal Code 10-1-9.B) documented for solar racking work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection
New circuit wiring, breaker, and disconnect verified, performed under the state-issued Electrical Permit per the 2020 NEC
See the full Shelby inspection guide — scheduling & re-inspection fees →
Tips
- Do not contact the City of Shelby Building Official to obtain the EV charger electrical permit -- electrical work anywhere within city limits is issued directly by the Montana DLI Building Codes Bureau in Helena, since Shelby holds Building-only DLI certification.
- A single new EV charger circuit added to an existing home with no other panel work fits the state form's cheapest 'Single Family Interior/Exterior Wire or Rewire' category (H, $45) -- confirm with the Building Codes Bureau (406-841-2056) if your installation also involves a panel upgrade or service change, which moves it into a higher-fee category.
- Unlike solar (which gets an explicit $65 Alternative Energy Source add-on on the state form), EV chargers have no dedicated line item -- they're billed as ordinary new-circuit electrical work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Shelby building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Shelby
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Montana →
Look up this fee in a different city →
Related guides
Now live
Build your Shelby project checklist
Describe your project once and get every permit, document, and fee it triggers in Shelby — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →