Concrete and driveway permit requirements. When flatwork needs a permit, right-of-way bonds, and drainage rules.

Only if it connects to the street, modifies drainage, or is a structural element.

When You Don't Need a Permit

Simple concrete flatwork on your own property — a backyard patio, a walkway, or a small pad — typically does not require a building permit in most cities, as long as it doesn't alter drainage patterns or connect to the public right-of-way.

When You Do Need a Permit

A permit is required for: new driveways or driveway widenings (curb cut modification), sidewalk work in the public right-of-way, any concrete that changes drainage patterns, and structural concrete (retaining walls, foundations). Driveway permits may also require a refundable right-of-way bond ($500-$2,000).

Drainage Is Key

The biggest issue with concrete work isn't the concrete itself — it's drainage. Most cities prohibit directing water runoff onto neighboring properties. If your new concrete changes how water flows on your lot, you may need a drainage plan even for otherwise exempt work.

ADA at the Sidewalk

If your driveway crosses a public sidewalk, the approach must meet ADA slope requirements. This is enforced during the permit process and is a common reason driveway permits are revised.

Backyard patio? Probably no permit. Driveway or anything touching the street? Yes. Always check drainage impact.

Permit fees by city in Nevada

Verified from each city’s published fee schedule. Where a city has no separate fee listed for this project, open the city page for the current requirements and amount.

CityPermit feeSource
Boulder City$27.00Verifiedvia Residential Building Permit (New Construction — Custom)Residential Building Permit (New Construction — Custom)
CarlinSee city page for the current Residential Building Permit (New Construction / Addition / Remodel) feeResidential Building Permit (New Construction / Addition / Remodel)
Carson City1.5% of the total project value, $65.00 minimum (per CCMC 15.05.020, Section 109.2)Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Douglas County$1,000.00 depositVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Elko$87.00Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
ElySee city page for the current Residential Building Permit (New Construction) feeResidential Building Permit (New Construction)
FallonNot published — set by City Council resolution rather than fixed in the Code of Ordinances; no valuation-based fee table was found on the City of Fallon website, in the Municode-hosted Code of Ordinances, or in reviewed City Council agenda packetsVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
FernleyBased on the current ICC Building Valuation Data (BVD) tables and/or written contract value (whichever is higher), applied to the City of Fernley Building Permit Fee Schedule (BPFS)Verifiedvia Residential Building Permit (New Construction / Single- and Two-Family Dwellings)Residential Building Permit (New Construction / Single- and Two-Family Dwellings)
Henderson$2,945Verifiedvia Residential Building Permit — New Construction (Custom Single-Family)Residential Building Permit — New Construction (Custom Single-Family)
Lander County (including Battle Mountain)Based on project valuation per 1997 UBC Table 1-A; no dollar-figure fee table is published on the county websiteVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Las Vegas$1,488 total (Admin: $55 + Plans Check: $500 + Inspection: $933)Verifiedvia Residential Building Permit — New Construction (Custom Single-Family)Residential Building Permit — New Construction (Custom Single-Family)
Lyon County$42.00 building fee + $27.30 plan check = $69.30 totalVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Mesquite$36.72Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
North Las VegasVaries — valuation-based per Table 3-AVerifiedvia Residential Building Permit — New Construction (Single-Family)Residential Building Permit — New Construction (Single-Family)
Nye County (Unincorporated, incl. Pahrump)Calculated from project valuation determined via the 2018 ICC Building Valuation Data Tables (updated each July 1), per Nye County Resolution No. 2004-29Verifiedvia Residential Building Permit (New Construction, Single- and Two-Family Dwellings)Residential Building Permit (New Construction, Single- and Two-Family Dwellings)
Pershing County (includes Lovelock)$67.00 per square footVerifiedvia Building Permit (New Construction — Single/Multi-Family Dwelling)Building Permit (New Construction — Single/Multi-Family Dwelling)
Reno$45.00Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Sparks$23.50Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Storey County (includes Virginia City)$23.50Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Unincorporated Churchill CountyNot published — the cost of permits is based on the valuation of construction; no dollar-figure or valuation-based fee table was found published on the County's websiteVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Unincorporated Clark CountyVaries — valuation-based (see Table 3-A)Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Unincorporated Elko CountyValuation-based per Table 1-A: e.g., $44.00 minimum for valuation up to $1,300; scaling up to $4,955.00 for the first $1,000,000 of valuation plus $2.75 per additional $1,000Verifiedvia Residential Building Permit (1 & 2 Family Dwelling — New Construction)Residential Building Permit (1 & 2 Family Dwelling — New Construction)
Unincorporated Humboldt County$51.75Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Unincorporated Lincoln County$20.00Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Unincorporated Washoe County$45.00Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Unincorporated White Pine CountyValuation-based; no dollar-figure fee table is published on the county websiteVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
West WendoverExample for a $200,000 valuation new single-family home: Building Permit Fee $1,553.75; Plan Check Fee $1,009.94; Water Impact Fee $3,715.58; Sewer Impact Fee $2,972.46; Total $9,251.73Verifiedvia Residential Building Permit (Single-Family, Two-Family, Manufactured Home — New Construction)Residential Building Permit (Single-Family, Two-Family, Manufactured Home — New Construction)
WinnemuccaNot published as a standalone current fee schedule; fee is calculated from project valuation on the Application for Building Permit formVerifiedvia Residential Building Permit (New Construction / Single-Family Dwelling)Residential Building Permit (New Construction / Single-Family Dwelling)
YeringtonValuation-based; determined from the City of Yerington Building Valuation Data Sheets (most recent revision, maintained at the Building and Planning Department) using the 1997 Uniform Building Code Section 223 definition of 'Valuation'Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)