EV Charger / Electric Vehicle Charging Station Permit in Village of Los Ranchos de Albuquerque, New Mexico
The Village of Los Ranchos de Albuquerque does not run its own electrical permitting program -- as with Building Permits on MRGCD Tracts (per Village ordinance Sec. 9.4.2(L)), electrical work is permitted and inspected by Bernalillo County Planning & Development Services, Building Services Division, under the 2020 National Electrical Code and 2020 NM State Electrical Code. Bernalillo County's Electrical page lists dedicated required-inspection types for Solar System and Generator/Alternative Back-up System installations, but has no equivalent dedicated 'EV Charger' or 'EVSE' inspection type or fee line -- a Level 2 home EV charger circuit is inspected under the County's general Rough In and Final electrical inspection categories, with the permit fee charged per Bernalillo County's own Administrative Resolution 25-2009 itemized electrical fee schedule (Table 3-B) -- a per-component charge, not a valuation-based one, and not a single flat dollar figure for 'EV charger' specifically.
Verified 2026-07-23 · Source
When you need this permit
- Electrical work must be performed by a New Mexico-licensed electrical contractor (or a homeowner who has passed the Bernalillo County Homeowners Electrical Exam, $25.00 exam fee) and permitted through Bernalillo County Planning & Development Services
- Reviewed against the 2020 National Electrical Code and 2020 NM State Electrical Code, plus Bernalillo County's enforcement of PNM's serving-utility guidelines
- No dedicated 'EV Charger' or 'EVSE' required-inspection type exists on the County's published Electrical inspections list (unlike 'Solar System' and 'Generator', which do have their own dedicated inspection types) -- an EV charger circuit is inspected under the general 'Rough In' and 'Final' categories
- Permit fee is charged per Bernalillo County Administrative Resolution 25-2009, Table 3-B (Electrical Permit Fees) -- a $23.50 administrative charge applicable to all electrical permit applications, plus itemized per-component charges; no line item is specifically labeled 'EV Charger' or 'EVSE'
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough In
Interior and exterior wiring in walls inspected before cover by finished walls, per Bernalillo County's required electrical inspections list
- 2
Final
Installation of all devices and fixtures complete, verified by a Bernalillo County ICC-certified electrical inspector before energizing
Tips
- Electrical permits for Los Ranchos properties go to Bernalillo County Planning & Development Services, not the Village -- the Village does not run its own electrical permitting or inspection program.
- Unlike Solar System and Generator installations, which have their own dedicated required-inspection categories on Bernalillo County's Electrical page, an EV charger circuit has no dedicated inspection type -- expect it to be inspected under the general Rough In and Final categories.
- The County's electrical fee is itemized per component under Administrative Resolution 25-2009 (Table 3-B) -- a $23.50 administrative charge plus $4.00 per applicable outlet/appliance line item -- rather than a single flat 'EV charger' rate, so contact Bernalillo County Planning & Development Services, (505) 314-0350, to confirm which line item(s) apply to your specific installation before applying.
- If your EV charger project also requires a Village-level review (e.g., if paired with a new structure), check with Village Hall (505-344-6582) about whether an additional Village permit (fence, pool, etc.) or Zone Review is triggered separately from the County electrical permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Village of Los Ranchos de Albuquerque building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Village of Los Ranchos de Albuquerque
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across New Mexico →
Look up this fee in a different city →