Curb Cut Permit in Lovington, New Mexico
Required for construction of a new driveway curb cut in Lovington, per Municode Chapter 12.04.
Verified 2026-07-19 · Source
When you need this permit
- Submit a completed Planning and Zoning Application
- Pay the Curb Cut Permit processing fee
- Provide proof of ownership or interest in the property
- Submit a site plan showing property lines, easements, road access points, and locations of utility lines
- After preliminary approval, construct the curb cut to City standards, including at least a 3-foot concrete apron into the driveway
- After the curb is cut and forms are set (before concrete is poured), call or email Planning and Zoning to request a preliminary inspection — allow 3 business days for the inspection to be scheduled
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Preliminary Inspection (City)
After the curb is cut and forms are set, before concrete is poured; allow 3 business days to schedule. If completed with no required adjustment, the permit is finalized at this inspection.
See the full Lovington inspection guide — scheduling & re-inspection fees →
Tips
- Schedule the pre-pour inspection request as soon as forms are set — the checklist specifies a 3-business-day scheduling lead time.
- The apron requirement (at least 3 feet of concrete into the driveway) is a specific, checklist-mandated minimum.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lovington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lovington
Compare curb cut permit fees across New Mexico →
Look up this fee in a different city →
Now live
Build your Lovington project checklist
Describe your project once and get every permit, document, and fee it triggers in Lovington — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →