Lovington building inspections
Inspection sequence, scheduling, and re-inspection fees for building permits in Lovington, New Mexico.
Reviewed 2026-07-19 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 214 S. Love Street, Lovington, NM 88260 (address on the Planning & Zoning Coordinator's own permit-checklist forms and P&Z Application cover sheet; the City's own Departments webpage separately lists the same office at 201 S Main Street, Lovington, NM 88260 — both addresses are published on official city.lovington.org pages as of 2026-07-18, discrepancy not resolved by any further published source)
- Phone
- (575) 396-9301 (Planning & Zoning Coordinator Crystal R. Ball, CFM, CZO); (575) 396-2884 (City Hall main line)
- cball@lovington.org
- Office hours
- Monday-Thursday 7:30 AM - 5:00 PM, Friday 8:00 AM - 12:00 PM (noon), walk-in basis
- Website
- Official site
Published scheduling rules
- Schedule the pre-pour inspection request as soon as forms are set — the checklist specifies a 3-business-day scheduling lead time. (Curb Cut Permit)
- The actual electrical permit for the circuit/panel work is a State of New Mexico Construction Industries Division (CID) Electrical Permit Application, with fees set by CID's amperage-based fee schedule published at rld.nm.gov/construction-industries/forms-and-applications/fees/ and codified at N.M. Admin. Code 14.5.5.10 ($27.00 minimum-inspection line for a standalone circuit; $45.00-$360.00 amperage-tiered service fee if a service upgrade is also needed) (EV Charger / EVSE Permit)
Inspection sequence
Applies to: Building Permit (Residential & Commercial Construction)
- 1
Preliminary Inspection (City)
Verifies compliance with setbacks, zoning, and land development requirements before construction begins; project must pass before the City Planner will sign the State CID permit cover sheet
- 2
Final Inspection (City)
Confirms completed work meets City zoning/site requirements; separate from any State CID code-compliance inspection
Applies to: Carport Permit
- 1
Preliminary Inspection (City)
Before construction, to verify setback/zoning compliance and enable City Planner sign-off on the State CID permit cover sheet
- 2
Final Inspection (City)
After construction, to confirm the carport meets all regulations
Applies to: Electrical Permit (City Electrical Inspector)
- 1
Concealed Installation Inspection
Required before concealed electrical work is covered (Municode 15.08.180)
- 2
Final / Certificate of Approval
White-tag certificate of approval required before connection to electrical service (Municode 15.08.140)
Applies to: Fire Sprinkler & Fire Alarm System Permit
- 1
Fire Department Special-Permit Inspection (City of Lovington)
Installed/modified sprinkler, chemical-extinguishing, or alarm systems are subject to City Fire Department inspection under the special-permit process (Municipal Code 15.10.080); an annual re-inspection follows the initial annual inspection, and a separate re-inspection fee applies to re-inspection of permitted work
- 2
CID Building/Mechanical/Electrical Inspection (if a separate CID permit applies to the same project)
Separate from the City Fire Department's fire-protection-system-specific inspection; covers the underlying general construction scope
Applies to: Sign Permit
- 1
Preliminary Inspection (City)
After the sign placement is marked on location, before construction/erection
- 2
Final Inspection (City)
After completion of the sign erection
Applies to: Solar PV Permit
- 1
Preliminary Inspection (City)
Verifies compliance with setbacks, zoning, and land development requirements before the City Planner will sign the State CID permit cover sheet
- 2
Final Inspection (City)
Confirms completed work meets City zoning/site requirements, separate from any State CID electrical code-compliance inspection
Applies to: Water/Sewer Connection Permit
- 1
Final Inspection — Sewer
Required after a wastewater connection to ensure installation meets City standards
- 2
Water Connection
Performed by the City Water Department itself and explicitly does not require a separate inspection, per the City's own checklist
Final inspection only: Change of Use / Certificate of Occupancy, Curb Cut Permit, EV Charger / EVSE Permit, Mobile/Manufactured Home Permit
Re-inspection fees
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lovington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Lovington building permits
Get alerts for Lovington
We'll email you when Lovington's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.