Water/Sewer Connection Permit in Lovington, New Mexico
Required for new water or sewer service connections in Lovington. Water connections are performed by the City Water Department itself; sewer connections must be performed by a licensed contractor and are inspected by the City after completion.
Verified 2026-07-19 · Source
When you need this permit
- Submit a completed Planning and Zoning Application
- Provide proof of ownership or interest in the property
- Submit a site plan showing property lines, building dimensions, lot area, lot dimensions, easements, building setbacks, road access points, and location of utilities
- For sewer connections: submit a statement of the connection size and type of materials to be discharged into the sewer
- For water connections: submit a statement of meter size and purpose for which the water is required (e.g., residential use, car wash)
- Call 811 before digging
- Pay the applicable Water/Sewer Connection Permit processing fee(s) and the fee for the required water meter
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Lovington Water/Sewer Connection Permit checklist (lovington.org/wp-content/uploads/2024/10/checklist_wtrswr.pdf), item 2, which reads 'Pay the applicable Water/Sewer Connection Permit processing fee(s). Show full citationHide
City of Lovington Water/Sewer Connection Permit checklist (lovington.org/wp-content/uploads/2024/10/checklist_wtrswr.pdf), item 2, which reads 'Pay the applicable Water/Sewer Connection Permit processing fee(s). $____________' — the amount is left blank for staff to fill in. No City fee resolution or schedule sets this administrative connection-permit processing fee: Ordinance 607 (2024, amending Municode Ch. 13.12 Rates, Billing and Collection) establishes only utility deposit amounts, water/sewer usage rates, and the new-water-meter cost schedule (see the separate 'Water meter fee' line item below), and no ordinance or appendix in the complete Ordinance List and Disposition Table (Ords. 218-612, current through Ord. 612, 6-9-25) establishes one. Expect the counter to quote the figure at application.City of Lovington Code of Ordinances Section 13.12.040(G) (Ord. Show full citationHide
City of Lovington Code of Ordinances Section 13.12.040(G) (Ord. 607, 2024; current through 2026 S-21, Ord. 612, 6-9-25, with no further amendment to this subsection) provides: 'For every new application for service, an initial inspection of the meter will be performed by the Water Department. If there is no meter on the lot, if the meter on the lot is not functioning, or if the current meter installed is no longer deemed reliable to accurately read flow data, the customer will require a new meter at the following cost' [table by pipe size, effective October 1, 2024]. This directly answers checklist item 8's 'fee for the required water meter,' which the City's own checklist (lovington.org/wp-content/uploads/2024/10/checklist_wtrswr.pdf) leaves blank for staff to fill in at the counter — the checklist simply doesn't point applicants to the codified table. The separate connection-permit processing fee above remains unpublished.Review timeline
Inspection process
- 1
Final Inspection — Sewer
Required after a wastewater connection to ensure installation meets City standards
- 2
Water Connection
Performed by the City Water Department itself and explicitly does not require a separate inspection, per the City's own checklist
See the full Lovington inspection guide — scheduling & re-inspection fees →
Tips
- Water connections are installed by the City Water Department directly and, per the checklist, 'do not require an inspection' — only sewer connections (installed by a licensed contractor) get a City final inspection. Contractor
- Sewer connection applicants must state both the connection size and the type of materials to be discharged.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Checklists & handouts
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lovington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Lovington's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Lovington yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Lovington lands. Privacy.
Other permits in Lovington
Compare water/sewer connection permit fees across New Mexico →
Look up this fee in a different city →
Now live
Build your Lovington project checklist
Describe your project once and get every permit, document, and fee it triggers in Lovington — in one checklist. Free, for any city and any number of projects.
Get started →