Water/Sewer Connection Permit — Lovington, New Mexico · Requirements sheet
Verified 2026-07-19 · Source: https://www.lovington.org/wp-content/uploads/2024/10/checklist_wtrswr.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Water/Sewer Connection Permit in Lovington, New Mexico
Required for new water or sewer service connections in Lovington. Water connections are performed by the City Water Department itself; sewer connections must be performed by a licensed contractor and are inspected by the City after completion.
Verified 2026-07-19 · Source
When you need this permit
- Submit a completed Planning and Zoning Application
- Provide proof of ownership or interest in the property
- Submit a site plan showing property lines, building dimensions, lot area, lot dimensions, easements, building setbacks, road access points, and location of utilities
- For sewer connections: submit a statement of the connection size and type of materials to be discharged into the sewer
- For water connections: submit a statement of meter size and purpose for which the water is required (e.g., residential use, car wash)
- Call 811 before digging
- Pay the applicable Water/Sewer Connection Permit processing fee(s) and the fee for the required water meter
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection — Sewer
Required after a wastewater connection to ensure installation meets City standards
- 2
Water Connection
Performed by the City Water Department itself and explicitly does not require a separate inspection, per the City's own checklist
See the full Lovington inspection guide — scheduling & re-inspection fees →
Tips
- Water connections are installed by the City Water Department directly and, per the checklist, 'do not require an inspection' — only sewer connections (installed by a licensed contractor) get a City final inspection. Contractor
- Sewer connection applicants must state both the connection size and the type of materials to be discharged.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lovington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lovington
Compare water/sewer connection permit fees across New Mexico →
Look up this fee in a different city →