EV Charger / EVSE Permit — Lovington, New Mexico · Requirements sheet
Verified 2026-07-20 · Source: https://www.rld.nm.gov/construction-industries/forms-and-applications/fees/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Lovington, New Mexico
Lovington has no dedicated EV-charger permit form or fee line item. Installing a Level 1/Level 2 EV charging circuit is electrical work; as with the general electrical-permit and solar-pv-permit entries in this file, the actual electrical permit is a New Mexico Construction Industries Division (CID) permit obtained directly from the State, billed under CID's statewide amperage-based fee schedule (N.M. Admin. Code 14.5.5.10, re-confirmed live 2026-07-20): $27.00 residual 'Minimum Inspection Fee for Items Not Listed' for a standalone new circuit with no service change, or the amperage-tiered Residential Electrical Service fee ($45.00-$360.00) if a service/panel upgrade is also required. It is not clear from any published city document whether the City's own legacy electrical-permit ordinance (Lovington Municode Chapter 15.08, issued by the City's 'electrical inspector') is enforced independently alongside, or has been superseded by, the State CID-routed process. Because a stand-alone EV charger circuit is not new construction, an addition, or a structural change, it is unclear whether the City's Planning and Zoning Application / cover-sheet sign-off step (required for building permits) applies at all to a bare electrical circuit addition — no published Lovington document addresses this specific scenario.
Verified 2026-07-20 · Source
When you need this permit
- Electrical work (including an EV charger circuit) is governed by the 2020 New Mexico Electrical Code / 2020 NEC (NMAC 14.10.4), administered statewide by CID
- The actual electrical permit for the circuit/panel work is a State of New Mexico Construction Industries Division (CID) Electrical Permit Application, with fees set by CID's amperage-based fee schedule published at rld.nm.gov/construction-industries/forms-and-applications/fees/ and codified at N.M. Admin. Code 14.5.5.10 ($27.00 minimum-inspection line for a standalone circuit; $45.00-$360.00 amperage-tiered service fee if a service upgrade is also needed)
- Lovington Municode Chapter 15.08.030 separately states that 'no wiring, devices or equipment for the transmission, distribution or utilization of electrical energy...shall be installed within or on any building or structure...without first securing a permit from the electrical inspector' — a City-issued electrical permit whose current relationship to the State CID process is not clarified in any published city document
- If a service panel upgrade or new circuit is treated as part of a larger project (e.g., a garage addition), the standard Lovington Building Permit checklist steps (Planning and Zoning Application, proof of ownership, site plan, Lea County E-911 addressing, Floodplain Determination Letter, State CID cover sheet signed by the City Planner) would apply; for a stand-alone charger circuit with no structural scope, no published document confirms whether this full checklist is required
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State CID Electrical Inspection
Circuit/panel work inspected under the 2020 NM Electrical Code / NEC by a CID inspector
See the full Lovington inspection guide — scheduling & re-inspection fees →
Tips
- There is no dedicated EV-charger checkbox or form anywhere in Lovington's published permitting documents — the closest analogue is the City's general electrical-permit and solar-pv-permit entries in this file, both of which route the actual electrical permit through the State CID rather than the City.
- If your installation involves only a new circuit/breaker for an existing garage (no structural work), it may not trigger the City's Planning and Zoning Application/cover-sheet process at all — confirm directly with the City Planning & Zoning Coordinator (cball@lovington.org, (575) 396-9301) and with a CID field office before assuming which process applies.
- Budget $27.00 for the State CID Electrical Permit if the charger is a standalone new circuit with no service change, or the higher amperage-tiered service fee ($45.00-$360.00) if a service/panel upgrade is also needed; no EV-specific state fee category exists.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lovington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lovington
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across New Mexico →
Look up this fee in a different city →
Related guides
Now live
Build your Lovington project checklist
Describe your project once and get every permit, document, and fee it triggers in Lovington — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →