Commercial Building Permit in Lovington, New Mexico

The City of Lovington issues one Building Permit process for all occupancies — the same City Building Permit Application checklist and the same New Mexico Construction Industries Division (CID) State Building Permit application cover new commercial construction, additions, and structural work exactly as they do site-built or modular homes; there is no separate commercial application, checklist, or checkbox. As with residential work, the City's Planning and Zoning Department reviews zoning, setback, and floodplain compliance and signs a cover sheet before the applicant submits to CID, which administers the current statewide 2021 New Mexico Commercial Building Code (NMCBC, NMAC 14.7.2, adopting the 2021 International Building Code as amended, effective 7/14/2023, issuing agency CID under NMSA 1978 Sections 60-13-9, 60-13-10.3 and 60-13-44). What is commercial-specific: CID's own fee rule breaks the plan-review fee into four five-percent discipline reviews for commercial construction (general construction, accessibility, electrical, mechanical/plumbing) rather than the single flat 20% line used for other work, and commercial construction is also subject to the City's own Fire Code (Municipal Code Chapter 15.10, adopting the 2021 International Fire Code by Ordinance 608, 2024), enforced by the City Fire Marshal/Fire Department rather than the State Fire Marshal.

Verified 2026-08-26 · Source

When you need this permit

  • Submit a completed, legible, signed and dated Planning and Zoning Application, marking the applicable commercial construction type (the form's Type(s) checklist includes 'Building Residential/Commercial')
  • Provide proof of ownership or interest in the property — a deed with legal description or property lease; an Affidavit by Property Owner(s) if the applicant is not the owner
  • Submit site plans showing property lines, building dimensions (including height), lot area, lot dimensions, easements, building setbacks, road access points, and location of utilities
  • Submit a Property Address for the Lea County Enhanced 9-1-1 System and a Floodplain Determination Letter, in that order, before the City will sign the State CID permit cover sheet
  • Submit a complete State building permit (CID) application cover sheet for City Planner and Floodplain Manager signatures — obtained before submitting to CID; the project must pass the City's preliminary inspection first
  • Plans reviewed against the 2021 New Mexico Commercial Building Code (NMAC 14.7.2, adopting the 2021 IBC as amended) and the other CID-administered statewide codes (2020 NM Electrical/NEC, 2021 NM Plumbing and Mechanical Code)
  • CID's commercial plan-review fee is broken into four discipline-specific 5% assessments of the building permit fee — general construction, accessibility, electrical, and mechanical/plumbing — rather than a single flat plan-review line (NMAC 14.5.5.11(E))
  • Commercial construction is also subject to City of Lovington Municipal Code Chapter 15.10 (Fire Code, 2021 IFC, Ord. 608, 2024); a City Fire Department special permit and fee separately apply if the project includes an automatic fire sprinkler system, chemical fire-extinguishing system, or fire alarm system (see Lovington's Fire Sprinkler & Fire Alarm System Permit listing for that fee schedule)
  • Submit an Access permit from NM DOT if the site is on a State-owned highway or road
  • Call 811 before digging
  • Pay the City Permit Fee (amount determined by City staff at time of application; not a published fixed schedule)
  • Final inspection required after construction to confirm work meets all City requirements

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

City Permit Fee (processing)
City of Lovington Building Permit Application checklist, item 10 (lovington.org/wp-content/uploads/2024/10/checklist_building.pdf) — the same checklist and fee line used for both residential and commercial work; Show full citationCity of Lovington Building Permit Application checklist, item 10 (lovington.org/wp-content/uploads/2024/10/checklist_building.pdf) — the same checklist and fee line used for both residential and commercial work; item 10 reads 'Pay City Permit Fee in the amount of $_______________ Date paid_______________.' No City-published fee table exists for this fee in Municipal Code Title 3 (Revenue and Finance) or the complete Ordinance List and Disposition Table (Ords. 218 through 612, current through Ord. 612, 6-9-25).
Not published as a fixed schedule — the dollar amount is filled in by City Planning & Zoning staff at the time of application
State CID Building Permit Fee (valuation-based)N.M. Admin. Code 14.5.5.11(A) (srca.nm.gov/wp-content/uploads/attachments/14.005.0005.pdf), confirmed live 2026-08-26 — the same statewide valuation formula applies to residential and commercial CID permits; CID determines the ultimate valuation per NMAC 14.5.5.10(B).
$3.00 per $1,000 of valuation up to $15,000, plus $1.00 per $1,000 of valuation over $15,000
State CID Plan Review Fee — Commercial (by discipline)
N.M. Admin. Code 14.5.5.11(E), confirmed live 2026-08-26 — this is the commercial-specific breakdown; Show full citationN.M. Admin. Code 14.5.5.11(E), confirmed live 2026-08-26 — this is the commercial-specific breakdown; NMAC 14.5.5.11(B) sets a single flat 20% plan-review line for other (non-commercial) building permit fees. The total percentage is the same either way, but CID assesses it per discipline for commercial construction.
5% of the building permit fee for each of: general construction review and inspections, accessibility review and inspections, electrical review and inspections, and mechanical/plumbing review and inspections — 20% of the building permit fee in total
City Fire Code general permit fee (Chapter 15.10, if a City Fire Department permit is required for the project)
City of Lovington Code of Ordinances, Section 15.10.080, opening paragraph (Ord. Show full citationCity of Lovington Code of Ordinances, Section 15.10.080, opening paragraph (Ord. 608, 2024; current through 2026 S-21, Ord. 612, 6-9-25): 'A fee of $25.00 shall be paid to the city for any permit required by this chapter...unless a special permit fee is applicable.' Applies alongside the CID fees above when Chapter 15.10 requires a City Fire Department permit for the project; see Lovington's Fire Sprinkler & Fire Alarm System Permit listing for the special-permit fee tiers that apply to sprinkler, alarm, and chemical fire-extinguishing systems specifically.
$25.00

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in Lovington?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Preliminary Inspection (City)

    Verifies compliance with setbacks, zoning, and land development requirements before construction begins; project must pass before the City Planner will sign the State CID permit cover sheet

  2. 2

    Final Inspection (City)

    Confirms completed work meets City zoning/site requirements; separate from any State CID code-compliance inspection or City Fire Department inspection

See the full Lovington inspection guide — scheduling & re-inspection fees →

Tips

  • Lovington does not have a separate commercial building permit application, checklist, or checkbox — the same Building Permit Application checklist and State CID process used for residential work also covers commercial buildings; only the CID plan-review breakdown and the applicability of the City's Fire Code differ in substance.
  • Budget for CID's discipline-based commercial plan-review assessment (general construction, accessibility, electrical, mechanical/plumbing, each 5% of the building permit fee) rather than the single flat 20% line — the total is the same, but a CID field office bills it by discipline for commercial work.
  • If the project includes an automatic fire sprinkler system, chemical fire-extinguishing system, or fire alarm system, a separate City Fire Department special permit and fee schedule apply under Municipal Code Chapter 15.10 — see Lovington's Fire Sprinkler & Fire Alarm System Permit listing for those figures.
  • As with the general Building Permit, budget time for the Lea County Enhanced 9-1-1 addressing step and the City Floodplain Determination Letter, both required before City sign-off on the State CID permit cover sheet.

Frequently asked questions

Lovington requires a commercial building permit for: Submit a completed, legible, signed and dated Planning and Zoning Application, marking the applicable commercial construction type (the form's Type(s) checklist includes 'Building Residential/Commercial'); Provide proof of ownership or interest in the property — a deed with legal description or property lease; an Affidavit by Property Owner(s) if the applicant is not the owner; Submit site plans showing property lines, building dimensions (including height), lot area, lot dimensions, easements, building setbacks, road access points, and location of utilities; Submit a Property Address for the Lea County Enhanced 9-1-1 System and a Floodplain Determination Letter, in that order, before the City will sign the State CID permit cover sheet; Submit a complete State building permit (CID) application cover sheet for City Planner and Floodplain Manager signatures — obtained before submitting to CID; the project must pass the City's preliminary inspection first; Plans reviewed against the 2021 New Mexico Commercial Building Code (NMAC 14.7.2, adopting the 2021 IBC as amended) and the other CID-administered statewide codes (2020 NM Electrical/NEC, 2021 NM Plumbing and Mechanical Code); CID's commercial plan-review fee is broken into four discipline-specific 5% assessments of the building permit fee — general construction, accessibility, electrical, and mechanical/plumbing — rather than a single flat plan-review line (NMAC 14.5.5.11(E)); Commercial construction is also subject to City of Lovington Municipal Code Chapter 15.10 (Fire Code, 2021 IFC, Ord. 608, 2024); a City Fire Department special permit and fee separately apply if the project includes an automatic fire sprinkler system, chemical fire-extinguishing system, or fire alarm system (see Lovington's Fire Sprinkler & Fire Alarm System Permit listing for that fee schedule); Submit an Access permit from NM DOT if the site is on a State-owned highway or road; Call 811 before digging; Pay the City Permit Fee (amount determined by City staff at time of application; not a published fixed schedule); Final inspection required after construction to confirm work meets all City requirements. If your project isn't listed, confirm with City of Lovington Planning and Zoning Department at (575) 396-9301 (Planning & Zoning Coordinator Crystal R. Ball, CFM, CZO); (575) 396-2884 (City Hall main line) before starting work.

The City's own Building Permit Application checklist leaves the City Permit Fee blank for staff to fill in at application. The State CID permit fee is $3.00 per $1,000 of valuation up to $15,000, plus $1.00 per $1,000 over that, plus a commercial plan-review assessment split across four disciplines (general construction, accessibility, electrical, mechanical/plumbing) at 5% each of the building permit fee (20% total) — N.M. Admin. Code 14.5.5.11. A separate $25.00 City Fire Code permit fee, plus special-permit fees for sprinkler/alarm/chemical-extinguishing systems, applies if the project falls under Municipal Code Chapter 15.10.

Lovington does not publish a plan-review timeline for this permit. Contact City of Lovington Planning and Zoning Department at (575) 396-9301 (Planning & Zoning Coordinator Crystal R. Ball, CFM, CZO); (575) 396-2884 (City Hall main line) for current turnaround.

You'll need: Planning and Zoning Application; City Building Permit Application (checklist); State Building Permit (CID) Application. Depending on your project, Lovington may also ask for: Affidavit by Property Owner(s). See the required-documents checklist on this page for details on each.

Lovington requires 2 inspection(s) for a commercial building permit, in order: Preliminary Inspection (City), Final Inspection (City). Schedule each through City of Lovington Planning and Zoning Department ((575) 396-9301 (Planning & Zoning Coordinator Crystal R. Ball, CFM, CZO); (575) 396-2884 (City Hall main line)).

Apply through City of Lovington Planning and Zoning Department at 214 S. Love Street, Lovington, NM 88260 (address on the Planning & Zoning Coordinator's own permit-checklist forms and P&Z Application cover sheet; the City's own Departments webpage separately lists the same office at 201 S Main Street, Lovington, NM 88260 — both addresses are published on official city.lovington.org pages as of 2026-07-18, discrepancy not resolved by any further published source). Phone: (575) 396-9301 (Planning & Zoning Coordinator Crystal R. Ball, CFM, CZO); (575) 396-2884 (City Hall main line), email: cball@lovington.org. Office hours: Monday-Thursday 7:30 AM - 5:00 PM, Friday 8:00 AM - 12:00 PM (noon), walk-in basis. Official information: https://www.lovington.org/departments/planning-and-zoning/.

The 2021 New Mexico Commercial Building Code (NMAC 14.7.2), which adopts the 2021 International Building Code as amended and took effect 7/14/2023. It is administered by the New Mexico Construction Industries Division (CID), not a City building department — Lovington has not established its own certified Building Inspection Department.

No. The City uses the same Building Permit Application checklist and Planning and Zoning Application for commercial and residential construction — the Type(s) checklist on the Planning and Zoning Application includes 'Building Residential/Commercial' as a single line item. The actual construction permit is a New Mexico Construction Industries Division (CID) permit either way, issued under the 2021 New Mexico Commercial Building Code for commercial work.

This one’s complicated · Get an expediter