EV Charger / EVSE Permit in Unincorporated Box Elder County, Utah
Box Elder County's 2026 Fee Schedule for Buildings & Grounds does not publish a distinct EV charger / EVSE line item. Its Building and Grounds fee table lists Mobile Inspection ($500), Solar Inspection ($500), Generator/Battery ($350), Pump ($100), and Meter Upgrade (Gas & Electric) ($100) as its only itemized inspection categories, plus a general Building Permit Fee that adopts the state ICC valuation-based fee structure — an EV charger circuit does not clearly map to any single one of these named categories.
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Box Elder County
- New dedicated 240V circuit and/or panel capacity to serve the charger, inspected under the adopted National Electrical Code
- Licensed electrical contractor, or owner-performed work on the owner's own residence
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Inspection of the new circuit/panel work serving the charger, administered by the Box Elder County Building Department.
See the full Unincorporated Box Elder County inspection guide — scheduling & re-inspection fees →
Tips
- Box Elder County's itemized Building and Grounds fee table (Mobile Inspection $500, Solar Inspection $500, Generator/Battery $350, Pump $100, Meter Upgrade (Gas & Electric) $100) does not name EV chargers or EVSE — confirm with the Building Department which category (or the general ICC valuation-based Building Permit Fee) applies to a standalone charger circuit before applying.
- If the charger installation involves an electric meter or service upgrade, the $100 Meter Upgrade (Gas & Electric) fee is the most likely applicable published line item.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Box Elder County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Box Elder County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Box Elder County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Box Elder County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →