EV Charger / EVSE Permit in Woods Cross, Utah
Woods Cross City has not published a distinct EV-charger fee category. The Consolidated Fee Schedule's BUILDING section explicitly covers electrical work under 'Other Building Permit Fees': 'Additions or modifications to existing structures; structural, plumbing, mechanical, and/or electrical systems. Fees shall be assessed in accordance with the provisions of Section 304 of the 1997 Uniform Administrative Code.' EV charger/EVSE installation is electrical work billed under this same general Building Permit fee mechanism — the same valuation-based Table 3-A schedule used for other permit types — with no distinct EV-specific line item.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property, filed as a modification to existing structure (electrical systems)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Woods Cross City Consolidated Fee Schedule, Resolution 2026-967, Version #75 (adopted 2/17/26), BUILDING section: 'Other Building Permit Fees - Additions or modifications to existing structures; Show full citationHide
Woods Cross City Consolidated Fee Schedule, Resolution 2026-967, Version #75 (adopted 2/17/26), BUILDING section: 'Other Building Permit Fees - Additions or modifications to existing structures; structural, plumbing, mechanical, and/or electrical systems. Fees shall be assessed in accordance with the provisions of Section 304 of the 1997 Uniform Administrative Code.' No distinct EV-charger or general electrical-permit dollar figure is separately published; this and the valuation-based Table 3-A schedule (see Residential Building Permit entry) are the only fee mechanisms.Review timeline
Inspection process
- 1
Electrical Inspection
Scheduled through Woods Cross City Building Services.
See the full Woods Cross inspection guide — scheduling & re-inspection fees →
Tips
- Woods Cross has no dedicated EV-charger permit or fee category — file the install as an 'Other Building Permit' addition/modification covering electrical systems, assessed per Section 304 of the 1997 Uniform Administrative Code.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Woods Cross building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Woods Cross's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Woods Cross yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Woods Cross lands. Privacy.
Other permits in Woods Cross
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Woods Cross project checklist
Describe your project once and get every permit, document, and fee it triggers in Woods Cross — in one checklist. Free, for any city and any number of projects.
Get started →