Residential Building Permit (New Single-Family Dwelling) — Woods Cross, Utah · Requirements sheet
Verified 2026-07-08 · Source: https://www.woodscross.gov/DocumentCenter/View/140/New-Residential-Buildings-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Single-Family Dwelling) in Woods Cross, Utah
Required for new single-family dwelling construction in Woods Cross. Applications are submitted through the City Inspect online portal; fees are valuation-based per the city's Consolidated Fee Schedule Table 3-A (1997 Uniform Administrative Code), plus a Plan Review Deposit, Construction Bond, and utility impact fees.
Verified 2026-07-08 · Source
When you need this permit
- New single-family dwelling construction regulated by the adopted 2021 IRC
- Construction plans with electronic structural engineer's stamp
- Site plan with legible setbacks drawn to scale (including easements and drainage plan)
- REScheck (2015 Utah Code version) energy analysis
- Manual J, D & S energy analysis documents
- Gas line diagram (typically drawn on the foundation plan), with an updated diagram submitted to the inspector at the rough 4-way inspection
- Owner/Builder Agreement and Certification Form required if the property owner is acting as their own general contractor and is not a licensed Utah contractor Owner-builder
- Rockeries or retaining walls holding back more than 4 feet of unbalanced fill require a separate building permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 7 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing
Per the Woods Cross New Residential Buildings permit handout inspection checklist; schedule by calling or texting Beacon Code Consultants at 801-564-0897 or 801-726-1606.
- 2
Foundation
Per the official inspection checklist.
- 3
Temporary Power
Per the official inspection checklist.
- 4
Sub Rough Plumbing
Per the official inspection checklist.
- 5
Foundation Drain
Per the official inspection checklist.
- 6
4-Way (Rough Building, Electrical, Mechanical, Plumbing)
An updated gas line diagram must be submitted to the inspector at this inspection, per the New Residential Buildings handout.
- 7
Power to Panel
Per the official inspection checklist.
- 8
Gas Line
Per the official inspection checklist.
- 9
Insulation
Per the official inspection checklist.
- 10
Drywall
Per the official inspection checklist.
- 11
Stucco
Per the official inspection checklist (if applicable).
- 12
Final
Final inspection prior to occupancy, per the official inspection checklist.
- 13
Construction Bond Release
Scheduled separately by calling 801-292-4421, per the official inspection checklist.
See the full Woods Cross inspection guide — scheduling & re-inspection fees →
Tips
- Woods Cross contracts inspection scheduling to Beacon Code Consultants (call or text 801-564-0897 or 801-726-1606) — this is separate from the general Building Division office line (801-292-4421).
- Sanitary sewer service approvals, permits, and fees are NOT covered by the city's building permit — South Davis Sewer District (801-295-3469) handles sewer separately for Woods Cross, Bountiful, Centerville, North Salt Lake, and West Bountiful.
- A Plan Review Deposit of $250 is due at application submission and is credited against the final permit bill; the remaining Building/Plan Review Fee is invoiced only after plan review is complete and is based on square footage/valuation.
- Construction activity is prohibited between 10 p.m. and 7 a.m. under the city's Noise Ordinance; violations result in a citation.
- A portable toilet and commercial trash bin are required on every construction site (exceptions may be granted in writing by the Community Development Director).
- Impact and water connection fees are added to the final bill for new construction on residential lots and may be reduced only in narrow demolish-and-rebuild circumstances.
- EV charger (EVSE) installation is treated as standard electrical work under this same Building Permit process, not a distinct permit type — the city's official Consolidated Fee Schedule (Version #75, Resolution 2026-967, adopted 2/17/26, live-fetched 2026-07-19) states that fees for 'additions or modifications to existing structures; structural, plumbing, mechanical, and/or electrical systems' are assessed per Section 304 of the 1997 Uniform Administrative Code and Table 3-A valuation table, with no separate electrical trade-permit line item and no EV-charger or electric-vehicle-charging line item anywhere in the document. Confirm project-specific requirements with the Building Division at (801) 292-4421.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Woods Cross building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Woods Cross
Residential Building Permit (New Single-Family Dwelling) in other cities
Compare residential building permit (new single-family dwelling) fees across Utah →
Look up this fee in a different city →
Now live
Build your Woods Cross project checklist
Describe your project once and get every permit, document, and fee it triggers in Woods Cross — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →