Solar Installation (PV) Permit — Woods Cross, Utah · Requirements sheet
Verified 2026-07-08 · Source: https://www.woodscross.gov/DocumentCenter/View/146/Solar-Installation-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar Installation (PV) Permit in Woods Cross, Utah
Required for residential and commercial solar photovoltaic installations. Requires a South Davis Metro Fire approval letter as a hard prerequisite to application acceptance, plus a job-specific line diagram, calculations, and equipment spec sheets. No jurisdiction-published review-timeline figure was located for this permit type after exhausting the city's own handout and its Consolidated Fee Schedule.
Verified 2026-07-08 · Source
When you need this permit
- South Davis Metro Fire approval letter — 'The permit will not be accepted and reviewed without it' per the official handout
- Job-specific site plan showing PV component locations, roof diagram with panel layout and walkway dimensions (3 ft minimum)
- Job-specific line diagram (not a generic one-line diagram) covering existing/new equipment, subpanels, conductor/disconnect sizing, grounding, inverters, and load-side/line-side configuration
- Calculations page: total watts, amps, volts, Voc at coldest expected temperature (NEC 690.7), short-circuit current
- Manufacturer specification sheets for racking, modules, and inverters (UL 1741 listing for inverters)
- Letter from a structural engineer confirming the roof will support the solar panel loading equally across trusses/framing
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection
Scheduled through Beacon Code Consultants (801-564-0897 or 801-726-1606) once installation is complete.
See the full Woods Cross inspection guide — scheduling & re-inspection fees →
Tips
- The South Davis Metro Fire approval letter is a hard gate — the city will not accept a solar permit application without it.
- The line diagram, calculations, and equipment spec sheets must all be job-specific to the exact system being installed, not generic manufacturer catalogs or template diagrams — the handout explicitly warns against submitting a generic one-line diagram.
- A letter from a structural engineer confirming the roof can support the added solar load (evenly across trusses/framing) is required for every installation.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Woods Cross building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Woods Cross
Solar Installation (PV) Permit in other cities
Compare solar installation (pv) permit fees across Utah →
Look up this fee in a different city →