EV Charger / EVSE Permit — Unincorporated San Juan County, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://sanjuancountyut.gov/building
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Unincorporated San Juan County, Utah
San Juan County does not publish a distinct EV charger, EVSE, or electric vehicle charging station permit or fee. The county's official Building Permits process document confirms electrical work is inspected as part of the general Building Permit process — its required "4-Way Inspection" explicitly includes "Rough Electrical" alongside framing, rough plumbing, and rough mechanical — and the Plan Requirements checklist requires an "Electrical Layout" (switches, lights, outlets, service size & location, panel size & location) as part of the same building permit plan submittal. A new dedicated EV charger circuit is therefore processed under this same general Building Permit administered by the San Juan County Planning & Building Department, with no separate EV-specific fee line item.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- Electrical Layout plan showing service size, panel size and location, and the new circuit — part of the standard Plan Requirements for a San Juan County Building Permit
- Rough Electrical inspection as part of the county's required 4-Way Inspection (Framing, Rough Electrical, Rough Plumbing, Rough Mechanical)
- Compliance with the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Part of the county's required 4-Way Inspection (Framing, Rough Electrical, Rough Plumbing, Rough Mechanical), performed after wiring is in place but before it is concealed.
See the full Unincorporated San Juan County inspection guide — scheduling & re-inspection fees →
Tips
- San Juan County has no separate EV-charger or standalone Electrical permit type — electrical work, including a new EV charger circuit, is covered under the general Building Permit and its Rough Electrical inspection.
- The county's published 1.75-per-square-foot fee formula is designed for new construction; for a standalone EV-charger retrofit with no added square footage, confirm the applicable fee directly with the Building Department at (435) 587-3829 or permits@sanjuancountyut.gov.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated San Juan County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated San Juan County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated San Juan County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated San Juan County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.