Solar PV (Photovoltaic) Permit in Unincorporated San Juan County, Utah

San Juan County does not publish a distinct solar, solar PV, or photovoltaic installation permit or fee. The county's official Building Department webpage (sanjuancountyut.gov/building, live-checked 2026-07-21) and its Building Permit Checklist / Plan Requirements PDF do not mention solar, PV, or photovoltaic anywhere; the county's separate Planning & Zoning Fee Schedule (sjcpcfeesched16.pdf, which covers only planning/zoning services, not building-trade permits) likewise contains no solar line item. A rooftop or ground-mounted solar PV installation is therefore processed under the same general Residential or Commercial Building Permit administered by the San Juan County Planning & Building Department, with its Rough Electrical inspection (part of the required 4-Way Inspection) covering the PV system's electrical work under the 2023 National Electrical Code (NEC Article 690, Solar Photovoltaic Systems, adopted statewide by Utah Code § 15A-2-103(1)(g)).

Verified 2026-07-21 · Source

When you need this permit

  • Installation of a rooftop-mounted or ground-mounted solar photovoltaic (PV) system at a residential or commercial property
  • Electrical Layout plan showing the new PV circuit, inverter/disconnect location, service size, and panel size/location — part of the standard Plan Requirements for a San Juan County Building Permit
  • Structural sign-off for roof-mounted arrays where the Building Official determines added roof loading warrants review (per the general plan-review authority described in the county's Building Permit Checklist; no PV-specific structural threshold is published)
  • Rough Electrical inspection as part of the county's required 4-Way Inspection (Framing, Rough Electrical, Rough Plumbing, Rough Mechanical)
  • Compliance with the 2023 National Electrical Code (NEC), including Article 690 (Solar Photovoltaic Systems), as adopted statewide by Utah Code § 15A-2-103(1)(g)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plan Review & Building Permit (combined)San Juan County Planning & Building Department official webpage (sanjuancountyut.gov/building), 'Fee Structure' section, live-checked 2026-07-21. This square-footage-based formula applies to new construction; the county does not publish a separate flat or valuation-based fee specifically for a standalone rooftop or ground-mounted solar PV retrofit with no associated new square footage — confirm the applicable fee for a standalone PV installation with the Building Department directly.
1.75 x square footage of the structure (example given by the county: 2,000 sq ft = $3,500)
Inspection FeeSan Juan County Planning & Building Department official webpage (sanjuancountyut.gov/building), live-checked 2026-07-21. Likely the applicable line item for a standalone solar PV electrical inspection, though not explicitly itemized as solar-specific.
$65.00 per inspection + State mileage rate

Review timeline

Plan review
Not published — contact the department

How long did your Solar PV (Photovoltaic) Permit permit actually take in Unincorporated San Juan County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Part of the county's required 4-Way Inspection (Framing, Rough Electrical, Rough Plumbing, Rough Mechanical), performed after PV wiring/conduit is in place but before it is concealed.

See the full Unincorporated San Juan County inspection guide — scheduling & re-inspection fees →

Tips

  • San Juan County has no separate solar, solar PV, or photovoltaic permit type — a solar installation is covered under the general Residential or Commercial Building Permit and its Rough Electrical inspection, the same treatment the county gives EV charger installations.
  • The county's published 1.75-per-square-foot fee formula is designed for new construction; for a standalone rooftop or ground-mounted PV retrofit with no added square footage, confirm the applicable fee directly with the Building Department at (435) 587-3829 or permits@sanjuancountyut.gov.
  • PV system electrical work must comply with NEC Article 690 (Solar Photovoltaic Systems) under the 2023 National Electrical Code, adopted statewide effective 07/01/2026 per Utah Code § 15A-2-103(1)(g).

Frequently asked questions

Unincorporated San Juan County requires a solar pv (photovoltaic) permit for: Installation of a rooftop-mounted or ground-mounted solar photovoltaic (PV) system at a residential or commercial property; Electrical Layout plan showing the new PV circuit, inverter/disconnect location, service size, and panel size/location — part of the standard Plan Requirements for a San Juan County Building Permit; Structural sign-off for roof-mounted arrays where the Building Official determines added roof loading warrants review (per the general plan-review authority described in the county's Building Permit Checklist; no PV-specific structural threshold is published); Rough Electrical inspection as part of the county's required 4-Way Inspection (Framing, Rough Electrical, Rough Plumbing, Rough Mechanical); Compliance with the 2023 National Electrical Code (NEC), including Article 690 (Solar Photovoltaic Systems), as adopted statewide by Utah Code § 15A-2-103(1)(g). If your project isn't listed, confirm with San Juan County Planning & Building Department at (435) 587-3829 before starting work.

The county has no solar-specific fee. Its published combined Plan Review & Building Permit formula is 1.75 times the structure's square footage, but the county does not clarify how that formula applies to a standalone PV retrofit with no new square footage — contact the Building Department directly at (435) 587-3829 to confirm the fee that will actually be charged, or whether it will instead be billed at the $65.00-per-inspection Inspection Fee rate.

Unincorporated San Juan County does not publish a plan-review timeline for this permit. Contact San Juan County Planning & Building Department at (435) 587-3829 for current turnaround.

You'll need: San Juan County Building Permit Application; Electrical Layout / PV System Plan. See the required-documents checklist on this page for details on each.

Unincorporated San Juan County requires 1 inspection(s) for a solar pv (photovoltaic) permit, in order: Rough Electrical. Schedule each through San Juan County Planning & Building Department ((435) 587-3829).

Apply through San Juan County Planning & Building Department at 117 South Main Street, P.O. Box 9, Monticello, UT 84535. Phone: (435) 587-3829, email: permits@sanjuancountyut.gov. Office hours: Monday–Friday 8:00 AM – 5:00 PM (San Juan County Administration Building, 117 South Main Street, Monticello — per San Juan County's official Contact Us / Administrative Office pages; the Building Department's own page does not separately publish office hours). Official information: https://sanjuancountyut.gov/building.

Unincorporated San Juan County, Utah has adopted: State of Utah construction codes adopted by reference — San Juan County's official Building Code Information page states verbatim: 'San Juan County has adopted the State of Utah codes as established in Title 15A, Chapters 1-5 of the Utah Code Annotated, as amended.' The county page does not enumerate individual code editions (IBC/IRC/IPC/IMC/IFGC/NEC/IECC) by year, so the current statutory statewide editions are cited directly below.; 2024 International Building Code (IBC) — statewide per Utah Code § 15A-2-103, effective 07/01/2026; 2021 International Residential Code (IRC) — statewide per Utah Code § 15A-2-103, effective 07/01/2026 (edition unchanged from prior cycle); 2024 International Plumbing Code (IPC) — statewide per Utah Code § 15A-2-103, effective 07/01/2026; 2024 International Mechanical Code (IMC) — statewide per Utah Code § 15A-2-103, effective 07/01/2026; 2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103, effective 07/01/2026; 2024 International Energy Conservation Code (IECC) — statewide per Utah Code § 15A-2-103, effective 07/01/2026; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103, effective 07/01/2026; 2023 National Electrical Code (NEC) — statewide per Utah Code § 15A-2-103, effective 07/01/2026; Residential provisions of the 2024 International Swimming Pool and Spa Code — statewide per Utah Code § 15A-2-103(1)(n), effective 07/01/2026. Local amendments apply — see the Unincorporated San Juan County overview page for the full list.

No. San Juan County does not publish a distinct solar, solar PV, or photovoltaic permit or fee. A solar installation is processed under the same general Building Permit administered by the county's Planning & Building Department, with the PV electrical work covered by the required Rough Electrical inspection under the 2023 NEC (Article 690).

Compare solar pv (photovoltaic) permit fees across Utah

Look up this fee in a different city →

Embed this data card →