Commercial Tenant Improvement / Tenant Finish Permit — Unincorporated Summit County, Utah · Requirements sheet
Verified 2026-07-23 · Source: https://www.summitcountyutah.gov/262/Building
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement / Tenant Finish Permit in Unincorporated Summit County, Utah
Required for tenant improvement (tenant finish) work in existing commercial buildings in unincorporated Summit County — interior build-outs, remodels, and finish work for a new or changing tenant space. Plans for tenant improvements of a finished shell and change-of-use remodels must be designed by an architect licensed in the state of Utah. All applications are submitted and reviewed through the EPROCESS360 online portal, per the County's 'Commercial Remodel/Tenant Improvement Checklist' (current as of 6/2026).
Verified 2026-07-23 · Source
When you need this permit
- Interior build-out, remodel, or finish work in an existing commercial tenant space in unincorporated Summit County
- Tenant improvements of a finished shell and change-of-use remodels require plans to be designed by an architect licensed in the state of Utah — per the County's Commercial Remodel/Tenant Improvement Checklist (6/2026)
- Property owner approval letter for the proposed project
- COMcheck (lighting and mechanical) energy code compliance documentation
- Construction Mitigation Plan required per Summit County Code § 7-7-11 if exterior work is proposed
- Site Plan required only if the exterior is being redone or there is a change of use — must show existing buildings, name/location of street(s), parking (including accessible parking), and (if exterior/change of use) scale, north arrow, property lines, topography, and building setbacks
- Additional information may be requested depending on the scope of the project
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 6 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Framing / Rough-In (MEP)
After framing and rough-in mechanical, electrical, and plumbing work — before insulation or wall cover; only applies to the extent the scope of work includes these items
- 2
Weather Barrier
Only applicable if the scope of work includes redoing the exterior; windows must be installed and all exterior wall penetrations completed prior to this inspection
- 3
Fire District Inspection
If applicable to the scope of work, the local fire district should complete its inspection prior to the building department's final. Scheduled directly with the applicable fire district, not through EPROCESS360.
- 4
Final
All work complete; space approved for occupancy under the tenant's use classification. An approved final inspection does not by itself constitute a Certificate of Occupancy.
See the full Unincorporated Summit County inspection guide — scheduling & re-inspection fees →
Tips
- A Utah-licensed architect is only required for tenant improvements of a finished shell and change-of-use remodels — the County's checklist does not require an architect for every tenant improvement, unlike its blanket architect requirement for new commercial construction.
- A Site Plan is only required if the exterior is being redone or there is a change of use — many pure interior tenant finish projects can skip this document, per the County's Commercial Remodel/Tenant Improvement Checklist.
- A Construction Mitigation Plan (per Summit County Code § 7-7-11) is only required if exterior work is proposed as part of the tenant improvement scope.
- Re-chased 2026-07-23: the Building Permit Fee rate applying to tenant improvements IS published — Ordinance 834-P item 2's flat 0.0075-of-valuation, $100-minimum rate is not limited to new construction, and a $65 Plan Review Deposit (item 12.b, vs. $200 for new structures) applies. The construction valuation itself is based on the submitted Bid Contract cost rather than the ICC BVD square-footage table, since the BVD methodology explicitly excludes alterations. Contact the Building Department at (435) 336-3124 for a project-specific estimate.
- All submissions, reviews, and issuance are processed exclusively through the EPROCESS360 online portal (summit.co.ut.eprocess360.com) — the County does not accept paper plans or perform over-the-counter reviews.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Summit County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Summit County.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Unincorporated Summit County
Commercial Tenant Improvement / Tenant Finish Permit in other cities
Compare commercial tenant improvement / tenant finish permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Summit County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Summit County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →