EV Charger / EVSE Permit — Unincorporated Summit County, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://www.summitcountyutah.gov/DocumentCenter/View/1732/Ordinance-834-County-Wide-Fee-Schedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Unincorporated Summit County, Utah
Summit County does not publish a distinct EV charger / EVSE permit type or fee line item. Directly read in full (2026-07-20, rendered page-by-page as images since the source PDF is scanned/non-machine-readable) the complete 'Summit County Building Department Fee Schedule' section of the County-Wide Fee Schedule (Ordinance 834-P, amended May 2026, effective 6/2026) — it lists a general Building Permit Fee (0.0075, i.e. 3/4 of 1%, of construction valuation, $100 minimum, both commercial and residential), a separate 'Alternative Energy Permits' category explicitly limited to 'solar, hot water, photovoltaic, geo-thermal, and wind generated power' ($700 photovoltaic / $500 geo-thermal / $250 solar hot water / $250 wind generator), and separate flat $100 fees for 'Electrical utility meter upgrade or replacement,' 'Mechanical utility meter upgrade or replacement,' and 'Plumbing utility meter upgrade or replacement.' No 'EV,' 'electric vehicle,' or 'charging station' line item appears anywhere in this fee schedule. Because EV/EVSE installation is not one of the enumerated Alternative Energy Permit categories and is not a utility-meter upgrade, it is billed as ordinary electrical work under the general Building Permit Fee (0.0075 x construction valuation, $100 minimum), the same mechanism used for standard building/electrical/mechanical/plumbing work in unincorporated Summit County.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Summit County — billed as ordinary electrical work under the general Building Permit, not the county's separate 'Alternative Energy Permit' category (which is limited to solar, hot water, photovoltaic, geo-thermal, and wind generated power)
- All submissions, reviews, and permit issuance processed exclusively through the EPROCESS360 online portal (summit.co.ut.eprocess360.com) — the County does not accept paper plans or perform over-the-counter reviews
- Compliance with the 2023 NEC, adopted statewide per Utah Code § 15A-2-103(1)(g)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical / Power-to-Panel
Not separately published for EV chargers by the county; follows the standard electrical inspection sequence documented for this jurisdiction's residential-building-permit entry (minimum two 20-amp GFCI-protected circuits required for power-to-panel inspection, per the County's 4-Way Inspection description).
See the full Unincorporated Summit County inspection guide — scheduling & re-inspection fees →
Tips
- Summit County's 'Alternative Energy Permits' fee category is explicitly limited to solar, hot water/photovoltaic, geo-thermal, and wind generated power — EV chargers are NOT included in that list, so do not expect the $700/$500/$250 alternative-energy rates to apply to an EV charger installation.
- EV charger / EVSE installation is billed as ordinary electrical work under the general Building Permit Fee: 0.0075 (3/4 of 1%) of construction valuation with a $100 minimum, plus a 65% plan review fee (may be waived) and a 1% state surcharge.
- All submissions go through the EPROCESS360 online portal (summit.co.ut.eprocess360.com) — the County does not accept paper plans or perform over-the-counter reviews.
- Confirm project-specific scope and any additional requirements with the Building Department at (435) 336-3124 or buildingquestions@summitcountyutah.gov before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Summit County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Summit County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Summit County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Summit County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →