Residential Building Permit — Unincorporated Summit County, Utah · Requirements sheet
Verified 2026-07-23 · Source: https://www.summitcountyutah.gov/262/Building
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit in Unincorporated Summit County, Utah
Required for new single-family dwellings, duplexes, townhouses, manufactured homes, additions with living space, and other IRC-governed residential construction in unincorporated Summit County, including the Snyderville Basin (Silver Creek, Pinebrook, Jeremy Ranch, Summit Park) and the East Side/3-Mile/Henefer-area unincorporated communities. All applications are submitted and reviewed through the EPROCESS360 online portal — no paper or over-the-counter submissions are accepted.
Verified 2026-07-23 · Source
When you need this permit
- New Single Family Detached (IRC), New Single Family Attached (Duplex) (IRC), or New Townhouses (IRC) — per the County's official 2025 scope-of-work classification list
- Construction or removal of any building/structure may not commence until a valid building permit is obtained from the County Building Official (Summit County Development Code § 10-3-20)
- A source of water must be verified prior to issuance of a building permit for a dwelling — either a statement from an existing water system representative confirming hookup capacity, or evidence of water rights/state engineer filing number for a private source
- A site plan (11"x17" minimum to 36"x48" maximum) must be submitted with the application; must be prepared and wet-stamped by a Utah-licensed surveyor, architect, landscape architect, or engineer if the parcel has a platted building pad, average grade over 5%, proposed structure height over 28 feet, or setbacks closer than 3 feet to the required line
- Financial security (bond or escrow) may be required prior to permit issuance to cover site debris/material abatement costs
- Planning approval may be required prior to building permit submittal for certain projects — contact the Planning Department at (435) 336-3124 to confirm
- Projects on slopes 15% or greater require a geotechnical report
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Grade (Engineering)
Must be completed by Summit County Engineering prior to footing inspection
- 2
Footing / Foundation
Geotechnical report must be provided at time of footing inspection
- 3
Certificate of Elevation/Survey Inspection
Planner reviews as-built top-of-foundation-wall and roof-ridge elevations against the approved site plan to verify height/setback compliance; required prior to shear/framing inspection when indicated on the approved plan. Performed by a planner in-office, not on-site.
- 4
4-Way Inspection
Windows, fireplaces, and furnaces must be installed before this inspection. Gas line and Power-to-Panel inspections are performed only after 4-way (gas lines must be under test pressure; minimum two 20-amp GFCI-protected circuits required for power-to-panel).
- 5
Weather Barrier
Windows must be installed and all exterior wall penetrations completed prior to this inspection
- 6
Insulation (incl. Spray-Applied)
Spray-applied (closed/open cell foam) insulation must be inspected before additional insulation covers it; allow 24 hours ventilation prior to inspection
- 7
Final Building and Final Engineering
Both required prior to Certificate of Occupancy for new construction. Local fire district inspection (scheduled directly with the fire district) should be completed prior to the building department's final.
See the full Unincorporated Summit County inspection guide — scheduling & re-inspection fees →
Tips
- The County's own Single Family Dwelling Checklist (current as of 4/2026) states: 'Review timeframes are ESTIMATED to be 9-14 business days.' The EPROCESS360 FAQ separately states new single-family dwellings 'may take up to 14 business days for review' and new commercial projects 'may take up to 21 business days.'
- Re-chased 2026-07-23: Summit County's Building Permit Fee IS published — Ordinance 834-P (County-Wide Fee Schedule), item 2, sets it at a flat 0.0075 (3/4 of 1%) of construction valuation, $100 minimum, applying to both residential and commercial permits. Construction valuation is computed from the ICC Building Valuation Data (BVD) table (published by the County, February 2026 edition). A $200 Plan Review Deposit (credited toward the 65%-of-permit-fee Plan Review Fee) is due for new structures. The final dollar total still isn't visible until EPROCESS360 completes plan review and applies the exact valuation, but the rate/formula itself is no longer undisclosed — contact the Building Department at (435) 336-3124 or buildingquestions@summitcountyutah.gov for a project-specific total.
- All submissions, reviews, and permit issuance go through the EPROCESS360 online portal (summit.co.ut.eprocess360.com) — the County does not accept paper plans or perform over-the-counter reviews.
- Starting January 1, 2025, the County changed its permit 'Scope of Work' classification titles — applicants must select the correct new title (e.g., 'New Single Family Detached (IRC)', 'Addition (Living Space)', 'Alteration (Interior)') or the application will be rejected for insufficient information.
- Permits are valid for 180 days from the last activity; a Permit Extension Request may be submitted once.
- Snyderville Basin properties (surrounding Park City) fall under the separate Snyderville Basin Development Code (Title 10, Chapter 8) with its own Planning Commission and General Plan — confirm which of the County's two planning districts (Snyderville Basin vs. East Side) your parcel is in, since planning/zoning prerequisites can differ even though building permit review is handled by the same County Building Division.
- A written statement confirming water availability (existing system hookup letter, or well/water-rights evidence) is required before a dwelling building permit can be issued.
- Certificate of Occupancy requires final Building and Engineering inspection approval, a Final Fire Inspection report, and (depending on water/sewer source) either a well log, a water-system final approval letter, a sewer-system final approval letter from Snyderville Basin Water Reclamation District, or Final Wastewater Approval from the Summit County Health Department for septic systems.
- Rooftop or ground-mounted solar PV installations require this same Residential Building Permit process through EPROCESS360, with no distinct solar fee line currently published — confirmed by direct-text-search of the County-Wide Fee Schedule (Ordinance 834-P) and the ICC Building Valuation Data table, neither of which contains the word 'solar' as of 2026-07-19. Historically, Summit County (with Park City) was one of Utah's first two jurisdictions to adopt the 'Solar ABCs' expedited/streamlined model solar permitting process, per Utah Clean Energy's Solar Permitting Toolbox — the original standalone checklist document (DocumentCenter View 272) is no longer reachable on the county's website (confirmed 404, no Wayback snapshot) as of this verification; confirm current solar-specific submittal requirements with the Building Department at (435) 336-3124.
- EV charger (EVSE) installation is treated as standard electrical work under this same Residential Building Permit / electrical permit process, not a distinct permit type — see this file's dedicated ev-charger-permit entry. Re-chased 2026-07-20 by rendering the full County-Wide Fee Schedule PDF (Ordinance 834-P) page-by-page as images (the direct-fetch/text-search approach previously failed since it is a scanned document): the Building Department Fee Schedule's 'Alternative Energy Permits' category is explicitly limited to solar, hot water, photovoltaic, geo-thermal, and wind generated power — no EV/electric-vehicle line item exists anywhere in the schedule, so EV charger installation is billed as ordinary electrical work under the general Building Permit Fee (0.0075 of construction valuation, $100 minimum).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Summit County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Summit County
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →